1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Understanding the School Set Up Menu Presented by: Josh Mostyn Presented by: Josh.
Using…. EasyCBM Reasons to use EasyCBM
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
Calendar Browser is a groupware used for booking all kinds of resources within an organization. Calendar Browser is installed on a file server and in a.
What is so good about Archie and RevMan 5
School of Psychology Online Ethics Guide No. 1 Submitting an application for ethical review. JRC/13/10/2014.
DB Audit Expert v1.1 for Oracle Copyright © SoftTree Technologies, Inc. This presentation is for DB Audit Expert for Oracle version 1.1 which.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
Researcher User Manual for Event Forms. Accessing the Researcher’s Portal The Researcher’s Portal is available through the Research website at the following.
© 2008 QUALCOMM Incorporated. External presentation to (audience), prepared by QUALCOMM’s (presenters name) – Month Day, 2008 Hours of Service Driver Training.
Workflow Practices using Class Live Sarah Haley. 1. Respond to Questions/Concerns First, I check and respond to all . Then I log in and check Questions.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Getting started on informaworld™ How do I register my institution with informaworld™? How is my institution’s online access activated? What do I do if.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Enrolment Services – Class Scheduling Fall 2014 Course Combinations.
Get Started with IOA Communities: Look for this button!
Logging In In order to log on to RRP (Rotary Resource Planning), you have to either: Click on this link or type it in your.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
1 15 April 2010: Post Mortem Analysis by M.Zerlauth MP3.1 Markus, Adriaan, Odd, Zinur and many others…
Jin Huang Ph.D. Candidate Massachusetts Institute of Technology.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
M. Gheata ALICE offline week, October Current train wagons GroupAOD producersWork on ESD input Work on AOD input PWG PWG31 (vertexing)2 (+
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
Adding, editing, and deleting items using CONTENTdm Administration.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
QPS high level controls LabView tools, an overview.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
HWC Review – Sequencer Vito Baggiolini AB/CO, with the team: Carlos Castillo, Daniele Raffo, Roman Gorbonosov.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
Update on the automation of quench heater analysis Zinour Charifoulline 18/06/2015TE/MPE-PE, ZCh1 Automation team: Odd Oyvind Andreassen, Jean-Christophe.
Trials Search Co-ordinators, Archie & RevMan 5 Lynn Hampson, Sheila Wallace, Gail Higgins, Karen Hovhannisyan Tuesday, 13 October 2009.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Instructions for Website How to register: 1. Click “Register” under the banner 1.
QC-specific database(s) vs aggregated data database(s) Outline
Managing Windows Server 2012
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
UW-Superior V10.7 for Instructors
Acknowledgements: H.Milcent, R.Denz, R.Schmidt, M.Zerlauth
MP3 Review Software tools
J. Uythoven for the MPE-MI & MS Teams
Remaining Online SW Tasks
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Conducting the performance appraisal
Powering from short circuit tests up to nominal
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Conducting the performance appraisal
Register training Using the college register system
Optimizing Efficiency + Funding
February 11-13, 2019 Raleigh, NC.
Presentation transcript:

1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay, Odd, Reiner, Roman, Zinur and many others…

2 15 April 2010: Post Mortem Analysis by M.Zerlauth Preamble  1 st version of POWERING SERVERS ready for release early next week – Support work of MP3 through continuous online analysis of powering events (with and without beam) – Data driven mechanism, ie arriving PM RAW DATA FILES will be grouped into powering EVENTS, and are analyzed in SESSIONS – Analysis session finishes typically some 7-8 minutes AFTER circuit trip and might (depending on the analysis outcome) SUPERLOCK circuits in case of equipment malfunctioning – Analysis module included in initial release Single Circuit Event (SCE) module for dissection of event into individual circuit events 600A Energy Extraction 13kA Energy Extraction Quench Heater Discharge Analysis (QHDA) 600A Quench discard module FGC_ext analysis (for possible feedback issues) Automatic Powering Event Recognition (Summer module for final decision on event type, identification of fault source, FGC faults, MP features, circuit lock,…)

3 15 April 2010: Post Mortem Analysis by M.Zerlauth Reminder: PM Server Architecture PM Data files PMA Scheduler Event Builder Data Collection PM Data Manager Libraries (references, DB Access Logging) GUI Modules Database LHC Logging PMA server PM buffers notifies triggers runs uses reads writes browses triggers Courtesy of Vito

4 15 April 2010: Post Mortem Analysis by M.Zerlauth ONLINE and PLAYBACK servers  ONLINE server – Launched from CCM or – For real-time analysis in CCC – Completely automatic, including automatic confirmation & circuit locking – Keeps history of past 15 analysis sessions in memory  PLAYBACK server – Launched from CCM or – For offline analysis by equipment experts,… – Allowing replaying ANY event in the past – NO EFFECT ON LHC OPERATION, ie no circuit locking, etc…. – Manual confirmation/discard for potential saving of results – Keeps history of past 15 analysis sessions in memory

5 15 April 2010: Post Mortem Analysis by M.Zerlauth What to do in case a circuit gets super-locked 1. Identify the super-locked circuit(s). Most likely the CCC will let you know, otherwise check the list of locked/super-locked circuits in the PIC SCADA – Circuits locked by POWERING SERVER will be marked in Comment

6 15 April 2010: Post Mortem Analysis by M.Zerlauth What to do in case a circuit gets super-locked 2. Identify the EVENT during which the circuit was super-locked. If it is recent it will most likely still be present in ONLINE server, easiest to check PM Database (from CCM or )

7 15 April 2010: Post Mortem Analysis by M.Zerlauth What to do in case a circuit gets super-locked 3. Open the according analysis SESSION, either in the ONLINE server (if still present) or in PLAYBACK In ONLINE: Use File -> Reconnect menu: In PLAYBACK: Use File -> Load Event menu:

8 15 April 2010: Post Mortem Analysis by M.Zerlauth What to do in case a circuit gets super-locked 4. Identify event source + cause of locking in ‘Overview’ tab, eventually browse to details in ‘Modules Graph’ tab

9 15 April 2010: Post Mortem Analysis by M.Zerlauth What to do in case a circuit gets super-locked 4. Identify event source + cause of locking in ‘Overview’ tab, eventually browse to details in ‘Modules Graph’ tab

10 15 April 2010: Post Mortem Analysis by M.Zerlauth What to do in case a circuit gets super-locked 5. If applicable, document reason for failure in MP3 logbook, unlock circuit after authenticating in PIC SCADA

11 15 April 2010: Post Mortem Analysis by M.Zerlauth Let’s try some examples….  14-OCT PM – – CIRCUIT_LOCK: Locked because of heater discharge  17-OCT PM – Sector 23 trip from 3.5TeV following quench test, Heater firing on MQ.14R2  23-OCT AM – Sector trip of A23 from injection current – Trip of RQ9.R2 (+ heater discharge) – EE file not OK

12 15 April 2010: Post Mortem Analysis by M.Zerlauth Conclusions  Server ready to be released mid next week (announcement will be sent to EIS’s, operators and MP3 members)  Limited number of modules included in initial version (a lot of tuning already done but tbc for e.g. 600A EE, 13kA EE, QPS_600….)  Expecting <1 circuit locks per day (depending on activities), please document in logbook cases where you think the circuit lock was unjustified  I’m available to help, don’t hesitate to call me if needed (I’ll receive as well automatic s)  Next weeks essential for learning with new system, will add new modules starting early next year