June 18, 2013 WINDSOR PARKWAY – ROSWELL ROAD INTERSECTION RELOCATION FEASIBILITY ANALYSIS.

Slides:



Advertisements
Similar presentations
City of Hubbard Transportation System Plan Update April 25, 2012.
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Asheville Regional Airport/City of Asheville Fire Station Feasibility Study Public Safety Committee June 25, 2012.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Fixed Time Signal Coordination
Location Hammock Dunes DRI – Includes: -Hammock Beach -Ocean Hammock
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Photo Red Light Enforcement Program Update Public Safety Committee June 18, 2012 Item #2.
New I-65 Interchange at Worthsville Road Welcome!.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Lec 24: Ch1.(T&LD): Urban transportation planning vs. Site planning Review the transportation-land use cycle (Read examples in Ch.1 & compare the development.
Module 5 Displaced Left Turn (DLT) Intersections
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Ralston & El Camino lane reassignment proposal John Boykin , The Belmont traffic safety commission considered a proposal to reassign.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
1 INTERCHANGE SELECTION CE 550 SPRING OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
DSRC and SPaT, SSM, SRM & MAP
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Assistant City Traffic Engineer
MD 30 (Hanover Pike) at Mt. Gilead Road
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Downtown Valdosta Truck Traffic Mitigation Study
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Problem 2: Moe Rd/Route 146 Intersection
CE 3500 Transportation Engineering Saturation flow and signal LOS
Comprehensive Transportation Plan
School of Civil Engineering
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Presentation transcript:

June 18, 2013 WINDSOR PARKWAY – ROSWELL ROAD INTERSECTION RELOCATION FEASIBILITY ANALYSIS

sandyspringsga.gov Windsor Parkway Intersection Overview  Project Background  Accident Summary  Operations Summary Existing Proposed  Options Option #1A Pros/Cons Option #1B Pros/Cons Option #2 Pros/Cons  Planning Level Cost Comparison 2

sandyspringsga.gov Windsor Parkway Intersection Relocation Overview Project Background  Intersection Improvement Project has been identified in the following publicly vetted documents:  Roswell Road Corridor LCI (2008) Roswell Road Corridor LCI (2008)  Transportation Master Plan (2008) Transportation Master Plan (2008)  2027 Comprehensive Plan (2007) 2027 Comprehensive Plan (2007)  Zoning application triggered reviews by: Georgia Regional Transportation Authority (GRTA) as a development of regional impact (DRI):  January 30, 2013: Notice of Decision (NOD) issued  Based on report, if JLB project is approved, the City must construct offsite improvements or risk losing federal funding Input into DRI NOD solicited from regional and local entities such as: Atlanta Regional Commission (ARC) Georgia Department of Transportation City of Atlanta  Concluded that Hedden St is entitled to full signalized Intersection 3

sandyspringsga.gov Windsor Parkway Intersection Relocation Overview  Accident Summary High Accident Intersection  103 reported accidents from January 2009 to May 2013  47 of these are head on, angle, or opposite side swipe 4

sandyspringsga.gov Windsor Parkway Intersection Overview Operational Summary – Existing Condition  Level of Service (LOS) E & F due to following: Skew Angle - Windsor Pkwy intersects Roswell Rd at a 57º angle (90º is ideal) Split-Phase - As a result of the skew angle, the signal cannot allow the east and west movements to occur at the same time for safety reasons and green time is reduced Turn Lanes - Windsor Parkway is a 2 lane approach with a left thru and a right turn lane  Separation and Queuing are not desirable: Signal separation between the Roswell Road with Winsdor Pkwy and W. Weiuca Rd is 700’ (GDOT criteria currently requires 1,000’ minimum) Substandard separation creates vehicle stacking and weaving movements that degrade operations  The vehicle queue northbound on Roswell Road often blocks the intersection with Meadowbrook Road and can spill back through West Wieuca and often Weiuca Roads  Traffic Volumes: Existing volume of left turns from westbound Windsor Pkwy to southbound Roswell Road are at the threshold volume to warrant a dual left turn lane Traffic volumes on Roswell Road are heavy and demand the majority of signal green time creating longer delays on Windsor Pkwy 5

sandyspringsga.gov Windsor Parkway Intersection Overview Operational Summary – Future Condition  Level of Service (LOS) C projected due to the following: Skew Angle: Corrected to a 90º Split-Phase: Signal can run without split phase allowing improved operation (frees up an estimated 25 seconds of green time per cycle) Turn Lanes: Windsor Pkwy configured with 2 left turn lanes in all current options under consideration  Separation and Queuing are more desirable: All current proposed options result in additional stacking and queuing length of approximately 300’ additional. City and GDOT criteria currently requires 1,000’ minimum.  Traffic Volumes: The new design does not reduce traffic volumes; however, it provides additional turn lanes and improved signal operation to improve the level of service at the intersection 6

sandyspringsga.gov Windsor Parkway Intersection Relocation Option #1A (Auction site) 7

sandyspringsga.gov Windsor Parkway Intersection Relocation Option #1A  Pros: Greatest level of service provides for dual left turns, dedicated through and right turn lanes Provides a 50’ buffer from Windsor Parkway to the townhomes Increases queuing length  Cons: Impact to the buffer/backyards of adjacent townhomes Largest footprint (five lanes) and largest number of parcels impacted Second highest projected construction cost Greatest impact on auction site 8

sandyspringsga.gov Windsor Parkway Intersection Relocation Option #1B (Auction site) 9

sandyspringsga.gov Windsor Parkway Intersection Relocation Option #1B  Pros: Reduces total lanes at intersection to four Provides a 50’ buffer from Windsor Parkway to the townhomes Reduces impact to auction site Lowest project construction cost  Cons: Impact to the buffer/backyards of adjacent townhomes Reduced level of service of overall intersection due to lack of dedicated right turn lane onto Roswell Road 10

sandyspringsga.gov Windsor Parkway Intersection Relocation Option #2 (Restaurant site) 11

sandyspringsga.gov Windsor Parkway Intersection Relocation Option #2  Pros: This option will not impact the auction site Projected construction cost similar to Option #1B Least amount of impact to homes on Hedden Street  Cons: Highest total construction cost Displaces active restaurant Least amount of queuing length along Roswell Road Reduced level of service of overall intersection due to lack of dedicated right turn lane onto Roswell Road 12

sandyspringsga.gov Windsor Parkway Intersection Relocation Options Planning Level Cost Comparison  Option #1A (Auction site) - $4.4M  Option #1B (Auction site) - $3.7M  Option #2 (Restaurant site) - $5.7M 13