Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
PUBLIC WORKS DEPARTMENT
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Budget Presentation Boone County Fiscal Court Fiscal Year
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
THE FUTURE OF TRANSPORTATION FUNDING AN ALDOT PERSPECTIVE December 3, 2014.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
PUBLIC WORKS DEPARTMENT FY Budget Worksession July 22, 2009.
"The Use of Condition Assessments to Improve Maintenance Level of Service in Texas" Joe S. Graff, P.E. Texas Department of Transportation.
ESTIMATES UPDATE TRAINING BULLETINS FOR 2013 Melissa Hollis, Basis of Estimates Coordinator August 1, 2013 webinar.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Current Construction Projects Major Projects Pinellas County.
What does PWD do for our City?. Administrative Services Engineering Operations.
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
Los Angeles County Metropolitan Transportation Authority ACEC-LA Luncheon February 12, 2014 Frank Quon, P.E. Executive Officer, Highway Program.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Public Works Department FY Budget Challenges February 16, 2010.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Our Trail Journey So Far and The Adventure Ahead.
Roadway Median Tree Program Public Works Department July 13, 2015.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
Madison Avenue Reconstruction Department of Planning and Development.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Public Works. Strategic Plan Presentation Department Organization Strategic Goals relating to Public Works Department Issues.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
District 7 (Los Angeles and Ventura Counties) State Highway System San Gabriel Mountains National Monument Area SAN GABRIEL MOUNTAINS NATIONAL MONUMENT.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
VDOT’s Operations Program Opportunities May 20, 2016
Region 4 Managers Meeting May 11, 2016
US26: Cornelius Pass Rd -185th Ave
State Highway System San Gabriel Mountains National Monument Area
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Highway 169 Bridge Replacement & Pavement Resurfacing
Responsibilities and FUNDING
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Presentation transcript:

Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer

Highway Maintenance Work District 5 Signs Pothole Patching Lighting Mowing Guardrail Striping Drainage Signals Agreements with Local Agencies (Non-Interstate)

Panel Sign Installation Mowing Striping Lighting Guardrail Repair Street Sweeping Pothole Patching

Highway Construction Work District Recommended Highway Plan Formally - “Six Year Plan” Programs the funds for the next two years The “Biennium” Approximately $70 million Federal Stimulus -For Dist. 5 road projects Approximately $23 million Federal Stimulus - For projects in the KIPDA Planning area

Westport Road / Interchange Widen Westport between Hubbards Ln. and Watterson Full Interchange at the Watterson Single Point Urban Interchange (Bardstown Rd.) Hall Contracting Fall 2008 to May 2010 $47 Million

I-65 Major Rehab Complete removal of Concrete Sections Replace With Asphalt Traffic Control Contractor????? December 2009 Completion Approx. $30 Million Stimulus Funded

Cable Rail Installation Installation on KY 841 from I-65 to Dixie Highway I-65 in Bullitt, Hart, and Barren Counties Gibraltor System – (4 wires) RMD Holdings Fall 2009 Completion $3.1 Million

I-65 Patching & Diamond Grinding Patch Bad Concrete Areas from MP to Grind Surface Faulkner Construction Fall 2009 Completion $5.7 Million Stimulus Funded

I-64 Widening Widen I-64 between I-265 and Shelby Co. Line 3 Lanes in each direction – Barrier Median Gohmann Asphalt & Construction Fall 2010 Completion $34 Million

Eastern Parkway “Road Diet” and Pedestrian Safety Bridge over Floyd and Brook Streets Rehab Warnock Ramp Reconfiguration Over-Height Truck detection system MAC Construction (Low bid – not yet awarded) January 2010 Completion $7.1 Million

Preston Highway (KY61) 4-Lane Widening From Jefferson County Line to John Harper Highway One of Four Sections Stimulus Funded Flynn Brothers Contracting January 2010 Completion $6.2 Million

Shawnee Expressway Bridge I-264 West to I-64 West Bridge Mainly for Rehab Lane Configuration stays the same Faulkner Construction May 2010 Completion $5.6 Million

QUESTIONS? (502) Transportation.ky.gov