How Technologies can be used to provide flexibility in asset monitoring By Daniel Stephens.

Slides:



Advertisements
Similar presentations
Intelligent Pressure and DMA Management
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
CMP206 – Introduction to Data Communication & Networks Lecture 1 - Networking Fundamentals.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
RAD ISM 01/2011 Slide 1 Wireless Mobility System.
Airmux-500 HPMP – 2011 Slide 1 Solution Note: Railway Crossing Accident Prevention Customer Type: Intercity train Strategic Sales Development.
Koos Kunneke – MMIS Analyst Corne Engelbrecht – Maintenance Engineer Advance Asset Condition Assesment.
Managing the Information Technology Resource Jerry N. Luftman
Stephen S. Yau CSE465 & CSE591, Fall Information Assurance (IA) & Security Overview Concepts Security principles & strategies Techniques Guidelines,
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
DAKNET Presented By: rreema.
Deriving Performance Metrics From Project Plans to Provide KPIs for Management Information Primavera SIG October 2013.
What is Influx InfoTech ?. About Influx InfoTech IT products & services company Delivering technology driven business solutions Hi-end infrastructure,
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
Cute Trac Vehicle Tracking System
ZIGBEE PROTOCOL FOR WIRLEESS SENSOR NETWORK ZIGBEE PROTOCOL FOR WIRLEESS SENSOR NETWORK Research paper Lina kazem
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Release & Deployment ITIL Version 3
BUSINESS SYSTEMS IMPROVEMENT PROJECT NC Department of Transportation Early 1980’s – Legislative Directive to use a SHARED Fleet Maintenance System SVFMS.
In the cab of both vehicles, a radial signal is constantly being transmitted to a distance from the vehicle specified by the user upon installation and.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Systems Analysis and Design: The Big Picture
AGENDA Welcome and introductions Brief introduction to PSI Mobile Technical Overview Demonstration Q and A Next Actions.
Solution Overview for NIPDEC- CDAP July 15, 2005.
1 The SpaceWire Internet Tunnel and the Advantages It Provides For Spacecraft Integration Stuart Mills, Steve Parkes Space Technology Centre University.
Project Overview Application Migration for Client Name Concealed 2nd Client Name Concealed InnovaIT Web Services.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
INFORMATION SYSTEMS Overview
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
1 Geometry Measurement. 2 Gauge 3 Cluster Camera Sensor.
A Mobile-IP Based Mobility System for Wireless Metropolitan Area Networks Chung-Kuo Chang; Parallel Processing, ICPP 2005 Workshops. International.
IBM Corporation IDATE November 20, 2003 Investment in the Mobile Enterprise Scott Stainken General Manager, Global Pervasive/Wireless e-Business.
PASSPORT SYSTEM – STANDARD AND E-PASSPORT The Passport includes standard international Security Features such as: Hologram Ultra Violet Print (can be seen.
Introduction + irastah proposes a cost effective method of tracking a human's mobility using two technologies.
Java Asynchronous Wireless Application Server (JAWAS)
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Service Transition & Planning Service Validation & Testing
Flexible, Modular Interlocking Systems for a modern railway network
Wireless traffic service platform for combined vehicle-to-vehicle and vehicle-to-infrastructure communications Authors : T. Sukuvaara and P. Nurmi IEEE.
ISO17799 Maturity. Confidentiality Confidentiality relates to the protection of sensitive data from unauthorized use and distribution. Examples include:
© 2012 Veritec Solutions Incorporated. All Rights Reserved. Potential Synergies from Positive Train Control Bruce Patty Vice President – Transportation.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Stanford University -- Using Hyperion for Budget Formulation & Analysis Presented by Dr. Andrew Harker Director of Budget Management Stanford University.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
INTRODUCTION:- The approaching 4G (fourth generation) mobile communication systems are projected to solve still-remaining problems of 3G (third generation)
Impact Research 1 Deploying Wireless LANs for Business Benefit Summary Document.
16 February 2016 Connected Worker. © 2015 by Honeywell International Inc. All rights reserved. Connected Worker 1 Real Time Gas Detection, Real Time Telematics.
Managing Information for Transparency November 15, 2010 Monica Fuijkschot Director, Information Management.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
1 Video - Essential for Today’s Subway Systems November 2011.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Interset Support Overview March 2017
Corporate Presentation
Project Management PTM721S
Communications in Railway Centralized Traffic Control Systems
Ping™ 6.
A New Era in Critical Communications
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Integrated Policy Sales and Medical Screening Solution 2016
LO2 - Be Able to Design IT Systems to Meet Business Needs
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
Presentation transcript:

How Technologies can be used to provide flexibility in asset monitoring By Daniel Stephens

Agenda Introduction Aim Pilot - Concept Overview Conclusions Final system overview Infrastructure Benefits Conclusion Questions 1

Aim To prove the concept and technology for unattended track measurement system operation – and to subsequently obtain approval and undertake a full system roll out To improve the quality of the recorded asset Integrate into an end to end management solution To ensure the seamless and reliable delivery of data from 'X' to 'Y', To provide condition data at a higher frequency than the current schedule of 2 to 4 weeks 3

Pilot – Concept Data is recorded by mobile un-attended systems (No human involvement) The data must be transmitted to a fixed point that is centrally located. This centrally located storage depository must have data processing capabilities enabling the data to be translated into a readable format The data must have the ability to be viewed easily by the end user. The storage location must be connected to the outside world where data can be transmitted to and from any location, but still be securely connected to the corporate network Due to the ad-hoc nature of the data being recorded, the solution should take into account that this could happen at any time of the day 4

Pilot - overview Product acceptance and various approval processes undertaken Two class 168 Chilterns DMU’s fitted with laser camera technology Lasers, cameras and an inertial box On-board processing box Wi-Fi and GPS systems Marylebone station fitted with a automatic wireless download system Processing software developed to convert recorded data into useable data Positioning software developed to locate the measurements 5

Pilot - Overview 6

Pilot - Conclusion 7 The Pilot enabled us to understand how the equipment works and to provide accurate analysis of the data. Further work was required to integrate the end to end solution It was identified that using a purely optical arrangement would not provide the reliability required with the environmental conditions High speed performance improvements were required along with signal redundancy. Equipment maintenance was an issue. Business paper was written and approved and funding granted for roll out

Pilot - Conclusion 8

9

Final System Overview

Final System Overview - 2 The equipment was added to, to include axle end vertical transducers as well as the original laser/camera/inertial box set-up 11 Laser/camera system mounted on the bogie Axle end transducers

Final System Overview - 3 All bogie mounted equipment is interfaced into one on-train control box with the use of GPS for positioning. Vehicle designs were undertaken, including: MkIII Class 390 – Pendilinos 168 DMU’s UFM160 New data processing software and infrastructure Deployment of full Wi-Fi infrastructure in nominated stations 12

Infrastructure

Infrastructure

Benefits Increased Frequency of recording Allows for more proactive maintenance of track Detailed monitoring of deterioration Targeted maintenance – correct materials, tools, personnel Immediate feedback on maintenance effects Predicted reduction in Level 2’s and ESR/TSR’s Potential to look at reducing foot patrolling Leading to ultimately a reduction in costs 15

Conclusion - 1 To prove the concept and technology for unattended operation – and to subsequently obtain approval and undertake a full system roll out – This project was successful in this area, with the roll out nearly complete on various vehicle types and a well driven roll out plan established – slide 10 and 11. To improve the quality of the recorded asset – As yet to be determined, full data analysis over a period of time is required to adequately quantify this – slide 18. Integrate into an end to end management solution – Successful, however ongoing IT issues may delay improvements – slide

Conclusion - 2 To ensure the seamless and reliable delivery of data from 'X' to 'Y‘ – The movement of data and the processes in place provide a seamless movement of data, but continued issues with the maintenance of the on-train equipment and the interference on the Wi-Fi system – Slide 14. To provide condition data at a higher frequency than the current schedule of 2 to 4 weeks – This has certainly been achieved but acceptance into the day to day maintenance regime is still yet to be achieved, increasing confidence in the data output will bring this in time – slide 8 and 9. 17

Conclusion

Acknowledgements Imagemap Incorporated AEA Technology Rail Bentley Rail Systems Interfleet Technology Bombardier transportation Alstom Network Rail Eurailscout T-Mobile and Nomad Serco Railtest 19

References Diagram Slide 10. ‘UGMS Hybrid Track Geometry Measurement System Specification’, Page 6, AEATR-VTI , Issue 3, June Andrew Hicks Slide 15. ‘NMT and UGMS update’, Slide 10. Network Rail Slide 5. ‘Unattended Geometry Measurement Systems’, Page 21. Network Rail Slide 14, ‘Unattended Geometry Measurement System’, Page 35. Network Rail Slide 18, ‘UGMS Data Validation: Progress Report 6’, Page 24, 04/02/04. Zachary Naylor 20

Questions 20