F-35 19 Feb 2015 Gregg Costabile, SES Director of Engineering, F-35 Lightning II Program.

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

F-35 Lightning II: Connecting to the Global Supply Chain Tom Burbage
Large Aircraft Survivability Initiative (LASI) Programmatic Overview Briefing for the: 4 th Triennial Aircraft Fire & Cabin Safety International Research.
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
The Affordable Solution - JSF ‘Joint Strike Fighter’,'JSF', and the JSF Logo are Trademarks of the United States Government. DISTRIBUTION STATEMENT A.
Sensors and location technologies – the front end of ISR
Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001 Air Armament Center Lethal Strike JPO Eglin Air Force Base,
Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.
7 th Fighter Squadron Screamin’ Demons Capt Michael “Tuff” Thompson.
F/A-18E/F SUPER HORNET BLOCK II MULTI-YEAR PROCUREMENT
PROFESSIONALISE | RE-PRIORITISE | STANDARDISE | BENCHMARK | IMPROVE INDUSTRY RELATIONSHIPS AND INDUSTRY PERFORMANCE | LEAD REFORM UNCLASSIFIEDNew Air Combat.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
United States Marine Corps
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
Lockheed Martin Aeronautics Company PROPRIETARY STATEMENT GOES HERE Chart Number C-130J Program Overview Arlen Rens Lead Production Test Pilot Bratislava.
Headquarters U.S. Air Force Fly – Fight – Win USAF Developmental Test – Value Added Maj Gen David Eichhorn Commander, AFFTC 26 August 2010.
ICBM Systems Directorate Minuteman III
4 March 2015 Steven Szilagyi PEO IWS D4
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Document No: JPRO September 2001 Volume 1 – Executive Summary.
Data Processing Equipment
New Applications of UAVs – A Driving Force Behind Joint Ventures Presented by; Haider Ali Bhatty Deputy Director General, Advanced Engineering Research.
Presented by - Patrick Hay MODERN FIGHTERS PRESENTED BY: PATRICK HAY.
The program work breakdown structure (WBS) establishes the essential
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Aeronautical Systems Center USAF Alternative Fuels Certification Program 1 AFPEO/Agile Combat Support.
Lockheed Martin Aeronautics Company DAU JSF Program and Interoperability DAU 8 June, 2004 JSF Program and Interoperability DAU 8 June,
Effective Methods for Software and Systems Integration
F-35 Lightning II In the early 1990’s the Department of Defense launched a tri service combat aircraft recapitalization program called the Joint Strike.
John Gruetzmacher, Lockheed Martin
AFGLSC and Depot Program David Mayfield, Program Manager
1 Corporate Overview CIC Luncheon Feb 15, Industry Leader Lockheed Martin #1 Aerospace and Defense Company with Revenue Greater than $20 Billion.
Integrating COIN and Full Spectrum Training LtCol M. B. Barry 23 Sep 2010.
Our Mission To earn your business through a combination of hard- work, intelligent choices and above all – integrity with loyalty. We hold ourselves and.
Losing Air Dominance? Hard Lessons in Strategic Planning.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written.
BQM-167A Advanced UAV System Architecture
Logistics Workforce Categories  Ms. Vicki L. Harris  DRC Contractor  Force Management and Organization Division  (A4RF)
PROFESSIONALISE | RE-PRIORITISE | STANDARDISE | BENCHMARK | IMPROVE INDUSTRY RELATIONSHIPS AND INDUSTRY PERFORMANCE | LEAD REFORM UNCLASSIFIEDNew Air Combat.
Delivering innovative ISTAR solutions SG.E
Joint Strike Fighter F-35 An International Collaboration Jon Waldrop
UNCLASSIFIED 1950’s Military assistance from USN 1980’s Stand alone shipbuilding 2010’s Shipbuilding for export Introduction of Korea Navy Logistics &
DISTRIBUTION STATEMENT A // APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITEDSLIDE #: 1 F-35 DOC #: JSF AS BRIEFED: July 2013 SBIR: The F-35.
Air Force Strategy to Resources
Life Cycle Logistics.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Control and Accountability of USAF Property on a Large and Busy Air.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Briefing Title_Date - 1 © 2014 Lockheed Martin Corporation DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Use or disclosure.
F – 35 Lightning II Cpl. Jakub Moštěk. F – 35 Lightning II Single-seat Single-engined (jet) Stealth 5 th generation multirole fighter Ground attack, reconnaissance,
Doing Business with the Naval Air Systems Command Presented to: SMART PROC 2015 Presented by: Ken Carkhuff Deputy Associate Director NAVAIR Office of Small.
UNCLASSIFIED DISTRIBUTION STATEMENT A – Cleared for public release by OSR on Sep – SR case number 10-S-3203 Developmental Test & Evaluation Presented.
Capability Based Approach to Approach to Joint Warfighting Joint Warfighting Presented by: RDML Mark Harnitchek Vice Director, Joint Staff Logistics Directorate.
Authorized for Public Release IAW SPR dtd RDML Mark R. Milliken Deputy Assistant Secretary of the Navy, International Programs (DASN IP)
1 DFRC SUAS Program Operations and Risk Management Approach for Small UAS Presented to the Certification Working Group 6/26/2008 Brad Flick/DFRC Chief.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. © 2014 Lockheed Martin Corporation SFTE_SETP_25Oct - 1 Use or disclosure.
F-35 Joint Strike Fighter America’s Next Generation Strike Aircraft.
DRAFT Strategic Customer Value Analysis May NAVAIR OVERVIEW INTERVIEW NAVAIR OVERVIEW INTERVIEW.
Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited ABMA September 2007 Tom.
Breakdown Work Structure Applying Management Tools to a Project.
USMC Operational Efforts
DoD Template for Application of TLCSM and PBL
FRCSW Advanced Technology Innovation (ATI) Intermittent Wiring Initiatives Overview 25 July 2017 JTEG Brett Gardner, ATI Avionics STL.
Supportability Design Considerations
Life Cycle Logistics.
“Existing world order is being redefined.” Henry Kissinger Jan 2015
CH-53K Marine Heavy Lift Replacement
Korea Navy Logistics & Future Tasks
Development Test Overview
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
The Controversial F-35 Joint Strike Fighter (JSF)
DDR&E Advanced Capabilities Overview
Presentation transcript:

F-35 19 Feb 2015 Gregg Costabile, SES Director of Engineering, F-35 Lightning II Program

Overall Program Status F-35 Program baseline holding steady; Continued progress on all fronts Total weapon system view Affordability SDD – Cost reduction initiatives Production – Ramp Rate, Blueprint for Affordability, Block Buys O&S – $19B Reduction in O&S estimate, R&M program, Cost War Room, Aircraft Availability Focus Schedule Service IOCs on track/Global Sustainment posture accelerating Software development/fielding not on critical path (margins) Technical performance Past risks improving (helmet, hook, fuel dump, lightning protection, software maturity) Current risks/issues being addressed (engine, structural cracks, ALIS, R&M, Mission Data Files) Partnership strong and FMS customers growing Not the same program as in the past

What Makes F-35 Different F-35 utilized an integrated systems approach to ensure long lasting lethality and survivability advantages against current and future Air to Air and Surface to Air threats Key elements of the F-35 systems of systems approach was the integration of and synergies between: Advanced Stealth Fused Multi-Spectral Active and Passive Situational Awareness Advanced Inter-operability Multi-Ship Situational Awareness and Tactics / Mutual Support Advanced Offensive and Defensive Electronic Attack Advanced Countermeasures Maneuverability with Combat Loads Persistence F-35 represents a system of system design solution to ensure operational advantages over current and future threats for the US and it’s allies!

F-35 Lightning II Team JSF CTOL P&W F135 RR - Liftfan Interoperability CV STOVL 3 Services 8 International Partners Global Sustainment 3 Foreign Military Sales Team JSF Domestic / International Suppliers Autonomic Logistics 3 Flight Test Facilities Integrated Training

F-35 Characteristics Key Attributes: CTOL General Features: Sensors Stealth Integrated Avionics Air-to-Ground (A/G) Munitions Intraflight DL Advanced Aircraft Survivability General Features: Single seat Speed: 700 kts or 1.6M (630/1.6M STOVL) Ceiling: 50,000 ft+ Engine: PW F135 Sensors Fully integrated open architecture system A/G – Air-to-Air (A/A) radar/Synthetic Aperture Radar Electro Optical (EO) A/G Targeting system A/A Infrared Search and Track (IRST) function Electronic Support Measures (ESM) Short range EO spherical coverage CTOL (AF) Length: 51.4 ft Wing Area: 460 ft2 Weight (Empty): 29,400 lb Internal Fuel: 18,200 lb Range: 600 + nm Length: 51.1 ft Weight (Empty): 32,600 lb Internal Fuel: 13,500 lb Range: 450 + nm Wing Area: 668 ft2 Weight (Empty): 34,900 lb Internal Fuel: 19,700 lb STOVL (BF) CV (CF)

System Development and Demonstration (SDD) Update CY2012 CY2013 CY2014 CY2015 CY2016 CY2017 CY2018 Q1 Q2 Q3 Q4 J F M A S O N D  Block 2B    Block 3i  Block 3F LRIP 3 LRIP 4 LRIP 5 LRIP 6 LRIP 7 LRIP 8 LRIP 9 LRIP 10 LRIP 3(17) LRIP 4(32) LRIP 5(32) LRIP 6(36) LRIP 7(35) LRIP 8(43) LRIP 9(57) LRIP 10(92) USMC IOC USAF IOC USN IOC 2B 2A DT&E 2B DT&E Cert Cert 2A 2A DT&E Cert 2B 2B DT&E Cert Spin Up OT II F Blk 2B Integrated Test 3i DT&E 3i Cert 3i Initial Final 3i DT&E Cert Block 1A TR1 3F 3F DT&E Block 1B TR1 Cert Block 2A TR1 3F Block 2B TR1 3F DT&E Blk 3i TR2 Cert Block 3F TR2 OT IIG OTRR Fleet Release Spin Up OT II G OTRR OT IIG OTRR Lightly shading are baseline Prominent bars are status Blk 3 Integrated Test Spin Up OT II G

F-35 Current Fleet Laydown F-35A F-35B F-35C Nellis AFB 5 A/C Total Patuxent River NAS 9 A/C Total Edwards AFB 20 A/C Total Luke AFB 19 A/C Total MCAS Beaufort 9 A/C Total Eglin AFB 44 A/C Total Break-down of aircraft shown on chart: Operational Aircraft = 18 MCAS Yuma – 18 Training Aircraft = 72 Eglin AFB – 44 Luke – 19 Beaufort – 9 Test Aircraft = 31 Developmental Test = 18 Edwards AFB – 9 Patuxent River NAS – 9 Operational Test = 16 Edwards AFB – 11 Nellis AFB – 5 A/C Awaiting Ferry = 0 – NOT INCLUDED in totals for Operational / Training / Test Aircraft ************************************************************** F-35 has 125 total aircraft (not including 6 static assets) 14 flyable SDD assets (includes AA-1 – Not shown on chart) 111 LRIP assets (DD-250’ed) MCAS Yuma 18 A/C Total 90 Operational / Training Aircraft 34 Test Aircraft Note: Does not include AA-1 at China Lake As of 28 Jan 15

F-35 Bed Down Through 2018 Total: 386 F-35 Global Deployment F-35A As of 17 Sep 2014 *Source Data: Sustainment Beddown Break Down_091114 F-35 Global Deployment Australia (2) Williamtown Italy (7) Amendola Grottaglie United Kingdom (9) RAF Marham Norway (9) Orland FMS (39) Total: 386 F-35A F-35B F-35C

Global Production System Norway Casebank Canada Australia Kitron Natech Mindready Ben Machine Novatronics Micreo LTD Levett Applica DY4 Interfast TAE Aerostaff Cablex Strite Dishon Composites Atlantic Techni Metronor Amphenol Ferra Hexagon Avcorp BAE Australia Centra Nav-Aids AIM Norway Kongsberg ASCO Megellan-Bristol Magellan-Chicopee Heroux Devtek Quickstep Marand Jotne EPM Technology GKN Raytheon Rolls Royce Woodward MPC GE GE Aviation LM Owego NGC Amherst BAE Systems Controls General Dynamics ITT Excelis UTAS BAE IEWS Times Microwave Pratt & Whitney L3 Comm GE Aviation Systems LM ISS NG ES NG Advanced Technologies UTAS (HS) Essex LM MST Rockwell Collins Rockwell Collins VSI McCormick Selph LM Space Systems LM Aero-Palmdale GKN NGAS Marvin Moog Parker Aerospace NGIS ViaSat Honeywell Honeywell/Cat Alliance Ball LM Aero-Ft Worth Raytheon Systems Boeing Eaton BAE SanminaSCI LM Pinellas LMMST LM EIS Harris LM M&FC General Dynamics Marion Curtiss-Wright, Kidde Moog, LSI UTAS (Burnsville) Honeywell Goodrich Services A.W. Bell Denmark Rosebank Chemring Systematic Software Engineering Trelleborg Sealing Solutions GPV Terma United Kingdom Damco GE Aviation BAE SYSTEMS Corena Danish Aerotech Honeywell Goodrich Rolls Royce Selex GKN Italy Selex Comms S3 Log RDF Beaufort Martin Baker Alenia York Electtronica Aster Cobham Selex Galileo The Netherlands Aerea Piaggio Dutch Space PHM Consortium Moog - SBC Rotodyne Aeronamic Fokker - Elmo Oto Melara Logic Fokker (TU) DAP Kale Aero Selex SI Vitrociset TNO NLR Brookx Aselsan Segundo Mona Havelsan Turkey Dutch Aero Eurocast Axxiflex TAI ALP Aviation Thales Cryogenics Fokker - Aerostructures Vestel Thales Nederlands As of Feb 13 9

F-35 - >2100 Aircraft Coalition United Kingdom United States Italy Netherlands Turkey Canada Australia Norway Denmark Japan Israel Korea Common Understanding in accordance with Production, Sustainment and Follow-on Development MOU

2014 Key Accomplishments Development / Test Production Developmental Flight test Completed 1354 flights (~1286 planned) Completed 9477 test points (~9958 planned) Began Block 3 flight testing Completed Block 2 Air-to-Surface weapons testing Completed first F-35C ship trial aboard USS NIMITZ 33 flights / 124 catapult launches / 124 arrestments US Reprogramming Lab (USRL) delivered Mission Data File to flight test Production Completed Production Lot 4 aircraft deliveries Delivered last Air Force F-35A to Eglin AFB Completed LRIP 8 Negotiations Fielding / Sustainment Began F-35B modifications to support USMC IOC Activated F-35 squadron at Luke / delivered 1st a/c Completed first F-35A and F-35B modifications to address life-limiting parts F-35 Mx training facility update 422nd TES Squadron received SAPF Certification & Accreditation Fielding / Sustainment (cont.) ALIS SOU Kit delivered to 57th Wing Weapons Instructor Course aircraft Formed Reliability and Maintainability Program Assigned Regional Airframe and Engine Mx for Europe and Asia-Pacific Region Overcame engine failure mishap Ended year with a 65% Mission Capable Rate & 55% Aircraft Availability Rate Partners S. Korea signed Letter of Acceptance (40 F-35As) Dutch pilots trained to support OT at Edwards AFB Australia's 1st F-35A delivered to Luke AFB Israel purchasing additional 14 F-35s Designated Italian FACO Heavy Airframe Depot (Europe) Designate Turkey, Netherlands, Norway as Heavy Engine Depots (Europe) Designated Australia & Japan as Heavy Airframe Depots (Asia-Pacific) Designated Australia & Japan as Heavy Engine Depots (Asia-Pacific) Hill AFB

2015 Key Milestones Development / Test Production F-35B Operational Test-1 (OT-1) aboard the USS WASP The first operational fleet weapons drop F-35C second shipboard trial (DT-2) aboard USS EISENHOWER Complete Block 3i Testing: MS capabilities, Gen III Helmet Begin/Continue Block 3F Testing FS Wpn Seps, Wpn Env, Ext store flight env MS capability development and verification Production Completing contract negotiations for production lots 9 (61 a/c) & 10 (98 a/c) Deliver 45 aircraft to field Fielding / Sustainment Block 2B software release for training Start AF and Partner pilot training at Luke AFB USMC IOC Deliver the first F-35A to Hill AFB to support the 34th FS First aircraft arrival to 422nd TES Squadron to support USAF Weapons School First two FMSs being installed in the F-35 SIM facility Mx training capability delivered; Electronic Media Lab (EML) & Outer Mold Line (OML) fully equipped Make DoD recommendation for OCONUS component repair Partners Italian Final Assembly and Check Out (FACO) facility’s 1st F-35A rollout Norwegian and Italian pilots integrated into the 62nd FS standup Certify Italian & Australian tankers Dutch jets delivered to Edwards for OT Hill AFB

F-35 Program Priorities Events Program Phases Programmatics Culture USMC IOC (1 July 2015) USAF IOC (1 August 2016) Operational Test Partner/FMS Deliveries Program Phases Development Sustainment/Fielding Production Follow-on Development Programmatics Safety/Security Affordability "Normalization" of Program Global Fielding/Sustainment Culture Integrity Transparency Accountability Discipline

Values slide SLIDE #: 14

Back Up Slides

Bottom Line F-35 Program baseline holding steady Continued progress on all fronts Not the same program it was in the past