Date: 13/06/20071 Sustainable practices relating to decommissioning of concrete structures Presented by Paul Kelly MCIWM Characterisation Land Quality.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
Inaugural Discussions on the Global Programme on Sustainable Ship Recycling Dhaka, Bangladesh – 12 January 2008 Donata Rugarabamu Secretariat of the Basel.
Regulation of Low Level Waste Management
LOW LEVEL RADIOACTIVE WASTE MANAGEMENT Implementation issues – the Governments perspective (DECC & NDA) Bruce Cairns & Matthew Clark 22 nd March 2011.
Albania Good practices and Gaps 13 December 2013.
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.
IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Environmental Management Systems An Overview With Practical Applications.
Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.
TRP Chapter Chapter 4.2 Waste minimisation.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
History of Responsible Care® in the Gulf Alan J. Izzard Borouge VP Corporate HSE/ VC RC Committee.
January 2013 Action Plan Skills Building: Module 3 Planning the Details: Activities, Timelines, Resources, and More.
Update on progress with development of DS459
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
1 SAFEGROUNDS SAFety and Environmental Guidance for the Remediation of UK Nuclear and Defence Sites.
Tom MAZOUR IAEA, Division of Nuclear Power
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
Development of a PCR for Green Coffee production September 2012 Update.
West of England Joint Waste Core Strategy September 2009.
Environment Protection (Waste to Resources) Policy TIANA NAIRN November 08.
Important informations
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
1. Zoning for Foreign Animal Disease Presentation to RCC Stakeholder Dialogue Session February 2014 Canadian Food Inspection Agency Dr. Cheryl James
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
SWWMG: June 2012 LEGISLATION UPDATE: End of Waste regulations, landfill tax, waste exemptions and the government Red tape Challenge.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Supply Chain Case Study Context and Drivers Presented by: Simon Bremer, Programme Manager, Characterisation & Clearance.
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
Muston planning for Bath & North East Somerset Council 3 June 2015 Councillor Training – Planning Mike Muston – Muston Planning.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Program and Quality.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
Waste and Minerals Core Strategy Preferred Strategy Consultation Land Disposal Workshop Uckfield 3 November 2009 Ian Blake, Team Manager – Waste and Minerals.
Building More Homes on Brownfield Land: Local Development Orders Brownfield Land and LDO Masterclass February 2015 Mide Beaumont DCLG.
Brownfield Register Making Data Standards Work Kevin Flanagan April 2016.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Massimo Garribba Director, Nuclear Energy, Safety and ITER
Workshop on E-waste Recycling and Refurbishing: Environmentally Sound Management Practices Guidance Supporting Environmentally Sound Management (ESM)
How to Protect the Local Environment
WASTEMENEGEMENT IN BUILDINGS
Fair Go Rates System Dr Ron Ben-David Chairperson
Nuclear and Treaty Law Section Office of Legal Affairs
Route 2: Strategy Document Template (Powerpoint format)
Nuclear and Treaty Law Section Office of Legal Affairs
Updating the NRC’s Alternative Disposal Request Guidance Document
NDA Draft Strategy.
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
Fair Go Rates System Dr Ron Ben-David Chairperson
USNRC IRRS TRAINING Lecture18
Operationalizing Export Certification and Regionalization Programmes
Strategic Environmental Assessment (SEA)
Sellafield Major Permit Review
TM TM on the Safe Disposal of Intermediate Level Waste
Presentation transcript:

Date: 13/06/20071 Sustainable practices relating to decommissioning of concrete structures Presented by Paul Kelly MCIWM Characterisation Land Quality & Clearance

Date: 13/06/20072 Waste Management Hierarchy Waste Management Hierarchy. Established principles and cornerstone of Waste Management Legislation Most preferred option is highest, least preferred option lowest Who has not heard of it?

Date: 13/06/20073 SD:SPUR “SD:SPUR” stands for Site Decommissioning: Sustainable Practices in the Use of Resources. The initiative was developed to establish through dialogue safe, socially, economically and environmentally sustainable practices in the use of resources arising from the decommissioning of nuclear sites.

Date: 13/06/20074 SD:SPUR Guidance document SD:SPUR Guidance Document on Sustainable Practices in the use of construction resources. Published 2005 Still valuable and relevant guidance document Free to download from CIRIA/SD:SPUR website

Date: 13/06/20075 SD:SPUR Guidance Continued. –‘The environment agencies require waste producers and waste disposal organisations…to use ‘best practice’ to ensure that people and the environment are protected and the waste hierarchy is applied during all waste management operations’ –‘The process of what represents ‘best practice’ involves a comparative assessment of different options, often involving a multi-attribute decision assessment approach’. –‘Various types of multi-attribute assessment are possible but the most widely used is the Best Practicable Environmental Option (BPEO) study’. –Above comments taken from SD:SPUR guidance document Site or Business area

Date: 13/06/20076 Characterisation requirements CLQ&C team can facilitate characterisation requirements to allow further consideration of options identified with regard to material reuse, recycling and, if lack of reuse/recycling options, disposal at appropriate facilities depending upon assessment of materials and results obtained.

Date: 13/06/20077 C&C Plan for Concrete Concrete re-use on Sellafield Site primarily for landscaping purposes. (Calder Cooling Tower basins shown) Other possibilities for re-use exist. Trial undertaken on Sealine concrete covers. Identified/confirmed other uses possible.

Date: 13/06/20078 WRAP Protocol. C&C investigations into Concrete Re-use led to consultation of WRAP Quality Protocol. WRAP – Waste & Resources Action Programme. Quality Protocol for recycled aggregates produced Updated 2008.

Date: 13/06/20079 WRAP Protocol continued. Good quality recycled materials, such as Recycled Concrete Aggregate from Concrete must meet pre- determined standards. Not just any Recycled Concrete Aggregate can be used. Quality Protocol clearly defines requirements.

Date: 13/06/ C&C Progress on Concrete Recycling Most concrete released off-site disposed of via Lawsons Recycling Beckermet. Unsure if working to WRAP Quality Protocol. Resulting Recycled Concrete Aggregate unable to be used in new build projects back on the Sellafield Site if protocol not followed.

Date: 13/06/ C&C Target/Plan Discuss with stakeholders (EA, local councils, supply chain etc.) full adoption of WRAP Protocol. Meet with Sellafield Project Designers/ Specifiers to discuss suitable projects for application of RCA and try! Engage with WRAP for support/advice. Internal standards/procedures will be required.

Date: 13/06/ Current Issues – Storage Storage options for demolition/excavation arisings limited on Sellafield Site. Flexible Intermediate Bulk Containers (FIBC’s) used predominantly across site. No defined storage standards.

Date: 13/06/ Review of storage standards. Storage & use of FIBC’s could be improved. Review of storage standards undertaken Identified current industry best practice. Findings to be implemented across site in near future.

Date: 13/06/ Current Industry Guidance BS EN ISO 21898:2005 Packaging – Flexible intermediate bulk containers (FIBCs) for non-dangerous goods. Proposed EA/SEPA/NI EHS & HSE Joint Guidance – Draft Other relevant documents available but none covering storage of radioactive materials in FIBCs.

Date: 13/06/ Findings UN ‘approved’ FIBCs available. Lined/bunded storage area required. FIBCs covered and protected from elements. Labelling requirements identified. Inspection routines to be implemented.

Date: 13/06/ Summary Decommissioning activities at Sellafield to increase dramatically. Can we reuse the material we produce? Infrastructure required – storage, crushing equipment, stockpiles of product & suitable applications. Many opportunities lie ahead.