Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008.

Slides:



Advertisements
Similar presentations
USDA - RURAL DEVELOPMENT
Advertisements

Construction Contracting
Roles & Responsibilities in Construction Management
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Procurement Management
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Determining Responsive Bids and Responsible Bidders and Offerors Presenter: J. Peter Stamps, CPPO, VCO VA Dept of General Services.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Marcy Mealy Procurement Specialist CDBG Program
Project Procurement Management
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Project Close Out CTC-470.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Engineering & Buildings Procurement Seminar.
Change Orders. Build the project that was bid and awarded.
Sole Source Training.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Dr. Ralph Ellis Click to edit Master title style Click to edit Master subtitle style 1 Dispute Review Board Value Contributions Ralph Ellis, P.E., Ph.D.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
IDENTIFYING THE STRENGTHS & WEAKNESSES OF YOUR CONSTUCTION PROJECT McCune Construction Services Group, L.C.C.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
King Fahd University of Petroleum & Minerals
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Contract Training Class I
TYPES OF CONTRACTS.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Agency Construction Management :CM NOT AT-RISK
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
1 Office of the State Comptroller Bureau of Contracts Basics of Request For Proposal Procurement Presented by Nisha E. Thomas Elizabeth Jaggers Peter Vander.
Resolving Common Construction Disputes By: Bob Bourg Claims and Disputes Manager Washington State Department of Enterprise Services Engineering and Architectural.
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
Measurement and Payment
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Discussion of the Differences Public Works Law and Bid Law
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Project Control
Construction Oversight
Pre-Construction Services
CONTRACT DOCUMENTS & CONSTRUCTION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Administrator of Construction Todd Wilson Senior Project Manager
Controlling Project Cost and Schedule
Delta Water Supply Project
Directed Change Constructive Change
Presentation transcript:

Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008

1.Discuss CO procedures before construction begins 2.Develop a potential change order (PCO) log and filing system 3.Distribute a PCO log at each progress meeting 4.Evaluate each PCO before making a recommendation 5.Never lower your standards of professionalism 6.Evaluate and resolve each PCO as fast as possible 7.Choose your battles wisely Guidelines for Change Order (CO) Management

Construction Management 1.Quality Assurance 2.Contract Administration 3.Change Order Management

Definitions Potential Change Order (PCO): An issue that could affect the cost or duration of a contract. Change Order (CO): A change to the cost or duration of a contract. Claim: A potential change order.

Issues that initiate PCOs  Drawing error  Specification error  Contract document discrepancy  Code violation  Engineer-requested change  Submittal review comment  Request for information  Owner-requested change  Contractor-requested change  Substitution request  Permit agency request  Permit requirement  Easement requirement  Property owner request  Utility conflict  Value engineering proposal  Changed site condition  Safety  Code change  Code interpretation  Tax increase or decrease  Quantity increase or decrease  Weather  Material availability  Labor availability PCOs that correct the design EX: $18K LS vs $31K T&M

Number of PCOs to Expect $10M$50M Tunnel10 to 2020 to 50 Reservoir15 to 3030 to 60 Pipeline30 to to 150 Pump Station 50 to to 200 Treatment Plant 75 to to 500 EX: Salem & Clearview

Time and Cost to Resolve PCOs PCO $1,000 Hours 3 Cost $500 $10,0008$1,000 $25,00016$2,000 $100,00040$5,000 $1,000,000160$20,000

Percent (%) Change Orders to Expect Pump Station – 1.5% to 5% Reservoir – 1.5% to 5% Treatment Plant – 1.5% to 5% Pipeline – 5% to 10% Tunnel – 10% to 30%

Paying for Change Orders Lump Sum Time and Materials Unit Price

Meet and Discuss CO Procedures before Construction Begins Proposed Agenda PCO log Number of PCOs / COs to expect Forms Recommendation and Owner approval process Lump sum vs. time and materials Quantity overruns on unit price bid items Markups on labor, materials, and equipment Contract documents governing PCO and CO procedures Liquidated damages Distribution of PCO log at weekly progress meetings #1

Develop and maintain a PCO log and Filing System Never remove an unresolved PCO from the PCO log Maintain a file for each PCO PCO file should document the event that initiated the PCO Correspondence regarding a PCO should reference the PCO number Develop and maintain a CO log and filing system #2 EX: Hajek & Curran

Distribute a PCO log at each Progress Meeting Include PCOs as agenda item Distribute PCO log and review status of each outstanding PCO Ask if there are there any PCOs that should be added to the log #3

Evaluate each PCO before Making a Recommendation to the Owner Scope Cost Schedule impact #4 EX: Valve Stem EX: Math error EX: T Bailey valve/labor cost EX: Gas monitors EX: Clearview Attorney & River Crossing PCO EX: Use baseline schedule, schedule of values, certified labor rates, equipment rates, RS Means

Never lower your standards of Professionalism Always treat the people with respect Let the other side have its day in court (i.e., listen) You do not have to come to an agreement at a PCO meeting Never infer that someone has deceived or lied Public works contracts are a marriage not a date #5 Disagreements regarding PCOs are professional disagreements not personal disagreements EX: Peter Falk (Columbo) EX: Ted & Munkdale EX: Sheffield and Landis EX: Kenko “run off road” EX: Gaynor and Cox EX: Hajek and Alia

Evaluate and Resolve each PCO as Fast as Possible The longer a PCO goes unresolved the more time everyone has to determine its impact on cost and schedule. #6

Choose your Battles Wisely You do not need to win every battle to win a war. #7

EXAMPLE – Choose your Battles Wisely $29,270 Weak$12,695 $28,168Very Strong$14,093$15,609 $10,454Strong$7,200 $5,272Strong$2,909 $996Very Weak0$996 $74,718$36,897$37,893 Contractor’s Request Strength of Contractor’s Request Engineer’s Proposal Agreement

$20K $40K $30K $10K $300K $266K $200K $250K $150K $100K $50K $171K Contractor’s Proposal Negotiated Change Order EXAMPLE – Choose Your Battles Wisely

EXAMPLE – Pump Station Change Orders $403,000 $288,000 $115,000 Contractor’s Proposal Agreement Savings Bid Amount -- $8.5M Final Cost -- $8.8M PCOs – 140 COs – 41 = 28.5%

Time to Resolve PCO Low Animosity High Cost of CO EXAMPLE – Resolve PCOs as Fast as Possible

Owner’s Letter: “I conclude that the information received was designed to deceive and mislead. We have been led down a path of compromise and cooperation that has resulted in delivery of equipment that will not function as the contract requires. Given the now visible pattern of misinformation and misleading actions, the Contractor’s plan is rejected in its entirety!” Contractor’s Response: “While I would prefer to ignore this rejection letter in its entirety, to be silent would give the impression that it is accurate. The letter is full of inaccuracies and misinformation. It qualifies as “hate mail” rather than professional, accurate criticism. We deserve compliments not criticism. Instead we received slanderous criticism.” Example – Never infer that Someone has Lied