Weekly HSE Lateral Learning 13/06/05 31/05/05NDSC Fatality B4P B4P Rig-88, Ahmed along with several members of the Rig 88 night shift crew were preparing.

Slides:



Advertisements
Similar presentations
Hand tools injury prevention
Advertisements

Opening/Closing Rail Car Plug and Sliding Doors
Lifting Techniques.
Drilling Contractor Safety
CONTRACTOR KILLED IN FALL FROM ROOF WORKING AT HEIGHT Work at height is work in any place at, above or below, ground level, where a person could be injured,
1 Struck-By Module 3. 2Objectives After this module you should be able to – identify the most common struck-by hazards – take the necessary steps to avoid.
Struck-By/Caught-Between
Machine Shop Hazards, Machine Tool Safety
Assessment.
Shipbreaking Module 4: Heavy Equipment & Material Movement
1 Caught-Between Module 4. 2Objectives After this module you should be able to – identify the most common caught-between hazards – take the necessary.
Lifting Techniques Preventing Back Injury in the Workplace University of Louisiana – Monroe 2012.
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
INTRODUCE SELF AND EXPLAIN GOING TO COVER BASIC
Crane & Hoist Training & Inspection Requirements Crane Safety.
Warehouse Safety. © Business & Legal Reports, Inc Session Objectives Identify warehouse hazards Prevent back injuries Work safely with material-handling.
Material Handling. Introduction Handling and storing materials include a wide variety of tasks like: Hoisting tons of steel with a crane Driving a truck.
1 There are many activities in Well Engineering that involve Working at Height ! An unprotected Fall from a height as low as 1.5 meters can beFATAL.
Mine Fatalities Involving Conveyors. Mining Fatality On August 1, 2005, a 30- year old laborer, with eight weeks mining experience, was fatally injured.
WEEKLY SAFETY MEETING April 22nd, IRI 750 OGEC rig NGIRI2.
Job Hazard Analysis Proactive Planning to Prevent Incidents Also known as: Task Safety Analysis, Job Safety Analysis Pre-requisites: None Course Goals:
Annual Refresher Training Tools and Machine Guards.
SAFETY RULES Follow all directions the first time they are given. Be courteous in language and actions. Be on time and prepared to participate. Respect.
Elkhorn Construction Inc..  A BJSA is a tool in which we plan our work, identify hazards, mitigate the hazards, and assign the responsible people. 
Copyright © Texas Education Agency, All rights reserved. Flexible Manufacturing Basic Safety 1.
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
Nearmiss Presentation
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
Toolbox Talk 2016 Struck by an Object.
QCF Diploma Health and Social Care Health and Safety Part 5.
10 steps to Safe Lifting.
JOB SAFETY ANALYSIS Presentation. ANY New Job/ Activity Recognize the Hazards Plan the work Protect the people Before starting ANY new job/ activity,
MNM Fatal Slip or Fall of Person Slip or Fall of Person August 21, 2004 (Oregon) August 21, 2004 (Oregon) Sand & Gravel Operation Sand & Gravel.
Warehouse Safety Is This You????.
Mine Fatalities Involving Conveyors
Roofing fall protection
PDO Safety Advice Date: LTI: Amputated finger
PDO Second Alert What happened:
No Removal of cellar frames by hands
Always use mechanical handling aids when carrying out a heavy lift
Safe Rigging Practices
Never intervene to correct obstacles without stopping the activity
High Potential Near Miss
يوم السلامة 2012 اقتطع وقتا للسلامة.
Safety is part of our culture at Halliburton
Always ensure the correct grade and length bolts are used
PDO Second Alert Stay out of the line of fire What happened:
Do not work at height without fall protection
Always wear fall protection equipment when working at height
PDO Safety Advice Use this Alert: Discuss in Tool Box Talks and HSE Meetings  Distribute to contractors  Post on HSE Notice Boards  Include in site.
Hands and Fingers !!! No. 12 What happened ?
Keep away form ‘line of fire’
SAFETY LEADERSHIP FOR FRONTLINE SUPERVISORS
PDO Safety Advice What happened? Your learning from this incident..
LTI: Finger Crush Injury Hands off suspend loads “Use Tagline”
Always stay out of the line of fire
PDO Second Alert Date: Incident title: LTI What happened?
Always keep your fingers away from pinch points
PDO Second Alert Use Hands Free Lifting Aids What happened?
Be aware of potential pinch points
Always intervene an unsafe act
A1 Pole Changeout Energized
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
Always keep your hands and fingers away from the Line of Fire
Effective communication prevents incidents
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Use the correct lifting device for the load
Only perform tasks under your responsibility
Presentation transcript:

Weekly HSE Lateral Learning 13/06/05 31/05/05NDSC Fatality B4P B4P Rig-88, Ahmed along with several members of the Rig 88 night shift crew were preparing the rig to commence drilling operations after completing a rig move. Part of this task is to set back the mast lifting line equalising yoke. This requires working at a height of 35 meters above the rig floor. It was planned to be done with one man in the mast itself and one man on a man-riding winch, both assisting in tying the yoke back. During this operation the cable supporting Ahmed fell off the snatch block hung underneath the crown block. Ahmed and his supporting cable fell the 35 meters to the rig floor, first hitting the travelling block. Ahmed was declared dead at 09:45 on the same day. He died of cardio repertory arrest due to severe head injury and multiple injuries to his chest abdomen and arms. LEARNINGS: The mobile cheek plate on the snatch block supporting Ahmed was found open and the static cheek plate found deformed. It was discovered that a safety pin was omitted from the retainer bolt during rig-up. The block had been subject to many activities during the preceding 8 hours which may have contributed to the backing out of the bolt. The deformed static cheek plate had been, sometime in the 8 hours preceding the incident subject to a load much greater than man-ridding alone. Observations on the power of the winch indicated a stall pull could be powerful enough to deform this plate. The rig had pulled out master-bushings preceding this incident. Ahmed was probably lifted too high. He was suspended on a 10m tail chain. At the height he was supposed to be lifted to, this would have put the interface between chain and cable at the block point. No secondary fall device was fitted. The incorrect winch was used. The utility winch was used to lift Ahmed instead of the man ridding winch. No hazard awareness or control. The PTW system was disregarded. No meaningful TBT or Job instructions. A climbing belt was used, not a man-riding harness. Slide 1/3

Weekly HSE Lateral Learning 13/06/05 Aimed at PDO DSV’s: Some simple checks on your rig to prevent a similar occurrence 1.Check what kind of man-riding procedures are in place on your unit, review them and highlight violations. To which height is man-riding allowed, are there any jobs that will require breaking this height rule? 2.Are all man-riding activities controlled with a PTW. Have a look back at the PTW record does it match with the activities undertaken 3.Is there a secondary fall device installed below the sheave. In its simplest form this is a wire sling suspended independently such that if there is a catastrophic failure of the sheave the wire will be caught 4.Are man riding belts in use and what type, the photo show a climbing belts not a man riding belt, familiarise yourself with what constitutes a man riding belt 5.Is there a dedicated Man riding winch, does it meet the requirements for a man riding winch, check with contractor, is it used for any other purpose. What is the pulling power of this winch? Use the manufactures stall load, unless you know the actual pull 6.What types of shackles are used to connect the snatch blocks to the respective pad eyes. 7.Do they have a dedicated number and are they part of the Lifting equipment register 8.Conduct a mast inspection together with the Rig Manager and assure your self that: 1.all sheaves/snatch blocks are properly secured 2.right type of shackles are in use ( see attached 2003 HSE info note next slide) 3.all shackles are secured with the right safety pin (no welding wire). 4.Check your findings against the latest Mast inspection check list of your unit and investigate major deficiencies. 9.Before such activities that ensure that hazard awareness controls are in place e.g. a JSA, check quality TBT’s are carried out 10.Use the Rig HSE File Slide 2/3 This is a climbing belt not a man riding belt

Weekly HSE Lateral Learning 13/06/05 Slide 3/3 Simple Guide to Shackle Use 4 types of shackle available 1/ Screw Pin Bow Shackle 2/ Round Pin Bow Shackle 4/ Safety Type Bow Shackle 3/ Screw Pin “D” Shackle 1.Single Lifts, no vibration or significant movement 2. Permanent fixture, not regularly opened and closed 3. For used with chains 4. For use on moving items (and vibration) or items out of sight Type 4 shackle will be used for suspending sheaves in mast

Weekly HSE Lateral Learning 18/05/05 Picture 2 20/02/05 Dalma NM 1A B3P Rig 53 While pressurising to set 9 5/8” whipstock the mud pump pressure increased to kpa and stopped. The pump stroke gauge read zero. The supervisors suspected that the pump had tripped. The Chief Electrician checked and reported everything was OK. While this check was ongoing TP opened up test pump to apply final test pressure, the test pump Pressure gauge indicated kpa! LEARNING In fact kPa had been applied to system by the mud pumps, the pumps had stalled due to pressure and the pop off valve had failed. Investigations observed that the stand pipe manifold pressure gauge hose had ruptured causing the sensor diaphragm to fail.. The gauge of remote choke panel was also connected to same sensor. (MULTIPLE GAUGES ON ONE SENSOR) The relief valves did not function even at kPa. Mud pumps relief valves were set & tested to kPa on , The relief valves were found stuck as dried out mud was found to have hardened on top of piston, mud was allowed to accumulate against the valve because of the backward slope of the pipe ACTIONS 1. Check on your rig: the piping arrangement from the pressure relief valves to the tank, this piping needs to be - Sloping downward to prevent mud settling and drying against the valve - Be straight, no bends - Be anchored securely at the tank end - Be made of piping rated equal to the system pipework 2. All gauges must have a separate sensor, with the exception of monitoring devices such as geolographs 3. Have pressure gauges (analog type) installed on standpipe manifold, visible for the driller and crew

Weekly HSE Lateral Learning 29/04/05 15/04/05 OD&E LTI 3P C4P RIG-40, During a routine interwell rig move, the rig carrier sustained a flat tyre. The rig carrier was raised off the ground and the surrounding sandy area was leveled. The bolts holding the wheel retaining wedges where loosened and some of the retaining wedges were removed. The plan was to move the forklift into position to support the wheel prior to removing the last of the retaining wedges. As the wheel was slowly turned by hand, it came off the hub and fell over. The Junior Mechanic and Derrickman tried to jump clear but their legs were hit by the falling wheel. The Derrickman sustained a broken leg. The Junior Mechanic had bruising to his wrist and leg. LEARNING The job appeared to have been reasonably well planned and supervised. A ToolBox Talk was held, although the operational aspects were well covered safety aspects were not, no procedures were in place, the area was prepared and the right tools were being used. Previous experience of all involved was that these wheels are tight on their hubs and require a lot of effort to remove, this time it fell off unexpectedly Always Expect the Unexpected…and Plan for it. ACTIONS 1.A quality TBT/JSA prior to such a job is vital. Ask the “what if’s” What if the wheel falls, what escape route does the team have What is different now, is the wheel hot? 2.It is apparent now that this very hazardous job, no procedures were in place or JSA done. This is a 2.8 ton wheel, the removal of which requires men to stand in front of it while loosening its retaining bolts. Work such as this needs in depth planning, but firstly the rigsite teams need to be able to recognize what constitutes a hazardous job. It is the responsibility of the senior personal on site to be able to recognize such hazards, and protect their workers 3.Although the medivac went well, The Thuraiya belonging to the DSV failed to operate during this emergency. All rigs to check their emergency contact systems weekly, you never know when you need them The Senior Mechanic, standing directly in front of the wheel and turning it. when the wheel fell off he was able to duck through the center hole. he was very fortunate to escape unharmed. The wheel passed over him!

Weekly HSE Lateral Learning 06/04/05 30/03/05 Schlum (Reda) PDO 2P C3P WPH-15, While preparing to connect lifting chains to ESP motor clamp, the motor rolled slightly and pinched the technician’s left index finger at the 3rd digit. Although employee was wearing proper PPE gloves, the pinch resulted in a cut approximately ½ inch in length and required 6 stitches ACTIONS: 1.Do you have a similar catwalk with large grove, what additional problems does this cause you? how do you manage this hazard? It needs thought about before you start to place large heavy objects on it, not after you’ve hurt someone 2.The step by step approach to handing a large item such as an ESP pump should have been detailed in the toolbox talk, 3.Ask for assistance, when manoeuvring difficult objects first look at mechanical means, if this is not possible do it as a coordinated team LEARNING The technician was working alone, attempting to move a heavy load sufficiently to secure a lifting device. This was made all the more difficult by the grove in the catwalk. The grove had trapped the ESP pump, the lifting lugs made it difficult to turn. Thought should have gone into how this pump was going to be handled on a catwalk with a large grove in the middle, rollers are used at the other end Was a Toolbox talk held for this job was it effective? Is their procedures for handling pumps?