MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Architectural Drawing
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Flip this House Indiana! WE BELIEVE!!. Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Working Safely In The Office.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Airstream Project: Day 1 (9/17/2012) Monday
WOOD LIGHT FRAME CONSTRUCTION
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
INSTALLATION MANUAL Job Forman Responsibilities
Source One Source One Network and Building Solutions.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Innovations in Building Permit Processes Building Safety Division 1.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
1 Home Department Phasing, Barricades and Panels Key Points Construction areas are always “hidden from the Customer” to protect the shopping experience.
Clean-up Steps Remove water Empty Contents Remove water, mud & muck Remove wall materials and etc. Wash Sanitize Ventilate & dry.
2012 Heartland Design Awards. A bold, dramatic and dazzling dining room sets the tone for a modern redesign of a single-family home in the suburbs. This.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Understanding House Plans
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Residential Construction Unit 6 Interior finishes Mr. Todzia.
Tiffany Victorian assembly instructions By Laser Dollhouse Designs.
How to update your kitchen for under $1,000. This is the before picture Here were some of the issues: –Kitchen has 30+ year old cabinets. The white dishwasher.
Commercial Kitchens.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
GENERAL INFORMATION SEATING SEATING CHART Assigned seats With a SUB you stay seated Tardy – is not in the room Bathroom and Water before entering room.
Chapter 24 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Status of AMS02 Integration Area in Building 867 January 10, 2007.
DIL-009 Phasing Plan TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Abney Enterprises L.L.C. Concessions International Cooler Addition Phase II Project.
Space Planning Chapter 7 and 16.
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
Bathroom Notes Chapter 24. Types of bathrooms: Master Bath –A full bath –Part of the master bedroom area.
By Angela Forte, Michelle Gagnon, Kerri Morse, & Sam Oosterman.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
IET 120 CONSTRUCTION PROJECT Name: Jesse Webb-Greenhill.
High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
House Project.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
Light Bulb Changing Procedure
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
Click here for the LIVE WEBCAM
Assembly And Installation Of Ikea Kitchen Cabinets
FLOOR PLANS CHAPTER 7 – PART 1.
Both D bathrooms and e kitchen What makes you special!
Consulting Captains, LLC
Architectural Drawing
J bathroom/ hi bedroom/ I kitchen
RISER PROJECT F bathroom.
C bathroom/AB and B Kitchens
Presentation transcript:

MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations and to see if they have any site specific regulations TThis is especially important in mall locations CComplete the detailed construction schedule CCross reference the Material Schedules on plan to the FFE Plan to the Items Ordered Sheet to look for discrepancies CConduct pre-construction meeting with the SM, DM, CM and GC to alleviate apprehensions and go over expectations

 Day 1; Monday; 12:00 noon until 5:00 am (16 hours)  Day 2; Tuesday; 12:00 noon until 5:00 am (16 hours)  Day 3; Wednesday; 12:00 noon until 5:00 am (16 hours)  Day 4; Thursday; 12:00 noon until 5:00 am (16 hours)  Not needed if floor is not being done  Day 5; Friday; 6:00 pm close until 5:00 am (11 hours)  Days 6 & 7; No work over the weekend (OPTIONAL)  Day 8; Monday; 6:00 pm close until 5:00 am (11 hours)  Day 9; Tuesday; 8:00 pm until 5:00 am (9 hours)  Day 10; Wednesday; 8:00 pm until 5:00 am (9 hours)  Thursday; Store is back to normal hours

 Demo of back line/int. walls  Rework electric & plumbing  Build new walls/rock 1 side  Blocking/install wall cubbies  Set backline cabinets & counters  Re-set equipment  Power and plumbing hook ups  Clean and re-set store for a normal morning opening

 Demo frontline, save pastry case  Saw cutting for floor sink relo  Re-work electric and plumbing  Set new bar, POS, & pastry case  Re-set all equipment  Power and plumbing hook ups  Seam Corian counters at the BL  Demo floor tiles to be replaced  Scarify floor of thinset  Prep for back splash wall tile  Begin wall prep for paint  Demo and set panels at 1 st R. R.  Clean and re-set this store for a normal morning opening

 Rough framing inspection  Re-locate/add wood soffit panels  Install new ceiling lighting  Finish first R.R. install Fixtures  Install Banquette seating  Continue wall prep  Demo existing chair rail  Replace all damaged ceiling tiles  Install R.R. accessories  Clean and re-set store for a normal morning opening

 Install floor tile, base and grout  Install backsplash tile and grout  Continue wall prep  Demo and set panels at 2nd R. R.  Install under counter lights at cubbies  Install FRP at the wet cabinets  Final ceiling prep for Friday paint  Prep and install wall cladding at the accent wall  Install custom wood trim at hallway door  Clean and re-set this store for a normal morning opening

 Protection for ceiling paint  Install BOH Eliason door  Finish 2nd R.R. install fixtures  Install R.R. accessories  Finish and sand all spackle  Clean and re-set this store for a normal morning opening

 Install free-standing merchandise bays  Build and set new condiment cart  Begin wall paint, paint R.R.  Install chair rail  Install new walk-off mat  Install FRP & re-set BOH as per plan  Install vinyl wainscoting  Clean and re-set this store for a normal morning opening

 Finish all wall painting  Install custom shelving unit  Install artwork/mural trim  Install metal corner guards  Install mural  Install artwork  Silicone throughout  Clean and re-set this store for a normal morning opening

Wednesday Day 10  Final electrical inspection  Final plumbing inspection  Build and set furniture  General punch list  Professional cleaning service  window cleaning  mechanical floor cleaning  high dusting  general cleaning  After today, the store is back to normal hours  Final building and health inspections are done during the day on Thursday

BEFOREAFTER OBJECTIVES: add Clover, claimed 500 square feet of unused square footage which increased customer seating from (18) to (32) seats, open-space feel with updated palette.

BEFOREAFTER OBJECTIVES; enlarge BOH and Managers area, get the full size refrigerator into the back of house, open up space, while increasing seating from (11) to (20) seats, we also replaced floor tile (tile over tile).

KEEPING THE CUSTOMER HAPPY WHILE INSIDE ….

Setting Trailer Utility Hookups General Guide Lines  Trailer must fit the location  Get prior approval from the town  Safe & separate egress for customers and workers  Plan on minimum 4 days to set trailer with inspections (NJ)  Prior arrangements for ice delivery and bulk milk storage  Prior coordination of data runs for POS and brewing equipment  Temporary dry storage will be required  We were able to open store and then remove trailer in one day

This store was completed in 11 days working thru the weekend, turn over on Friday. We installed new floor tiles and did a full bar reversal. There were only a few hours of interrupted business.