Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.

Slides:



Advertisements
Similar presentations
CDM Basics Marcos Castro, World Bank Institute CFCB Sao Paulo Workshop São Paulo City Hall, 4 May 2010.
Advertisements

1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROCESS TO P REPARE AND I NCLUDE CPA S UNDER A CDM P O A.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
The New Market Mechanism Emissions Trading – Developments in China & Europe Workshop 25 th April 2012 Dr Luke Redmond
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
CARBON CONTRACTS - the PCF experience September 30, 2002.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Annual Meeting of the Host Country Committee on Carbon Finance Washington D.C. February 15-16, The World Bank Carbon Funds:
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
CDM Investment Opportunities in Israel Presented by: Adi Dishon Project Manager.
From Pipe Dreams to Pipelines: Getting the first CDM project in Israel going Presented by: Adi Dishon Managing Director.
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Carbon Finance Risk Management Marina Olshanskaya Regional Energy/Kyoto Protocol Specialist RBEC Energy and Environment Practice Meeting Wednesday 27 th.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
FAO NAMA learning tool to support NAMA preparation in agriculture
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
CAPACITY DEVELOPMENT FOR THE CLEAN DEVELOPMENT MECHANISM PROJECT CYCLE IN THE PHILIPPINES Roberto C. Yap, S.J., Ph.D. Climate Change Information Center.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Forest Carbon Partnership Facility Global Dialogue on Developing a Readiness Preparation Proposal August 13-14, 2009 Structure of the R-PP template Review.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Sustainable Development Impact Evaluation Miriam Hinostroza.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Carbon Finance Strategy the World Bank Carbon Finance Strategy the World Bank CHARLES CORMIER Sept 2005.
Clinic: PIN preparation Hakim Zahar, P.Eng. Vice-President ECONOLER INTERNATIONAL & Natasa Markovska, D.Sc. EE Senior Scientific Collaborator Consultant.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First Regional Workshop, Tunis January Cross-cutting issues to.
Does project reduce, prevent or mitigate the release of 1 or more of the Kyoto gases [See appendix 3]? Does the project remove CO2 or other GHGs from the.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist,
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
KfW Carbon Fund From PoA to NAMA Barcelona 31th of May 2011.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
NAMAs in the Context of National Sustainable Development Karen Holm Olsen Brainstorming session, 9 April 2013, AM (CET) UNFCCC coordinated.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Template Contents of the Low Carbon Development Strategy (LCDS)
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
DNV experiences and viewpoints
Possibilities for promoting environmental protection projects
Work Accomplished by JISC
Presentation transcript:

Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development

Contents Project screening PINs: Purpose and Key Elements Buyers’ Perspective Preview of PDD How to get started?

Project Screening Undertaken by seller and buyer to prioritize investments Cast the net widely at first, then narrow focus according to feasibility, profit, etc. Fully use the process –to map out key risks, drivers, and uncertainties –to identify and engage project champions and affected stakeholders

Purpose of Project Idea Note (PIN) Communication tool used by project developers and investors early on in the process Aids in the conceptualization, marketing, financing and screening/evaluation of projects Prerequisite for more serious negotiations (e.g. Letter of Intent) ‘Road map’ for formal CDM application/project document DNA may require before issuing Letter of No Objection

PIN – Key Elements Clear description of project activities and technologies employed Identify project participants and arrangement for implementation –Participants’ roles and their technical, financial capability to undertake –Status of third party involvement if appropriate (e.g., PPA in case of electricity generation project or agreement with municipality, private operator regarding ownership of waste in case of landfill project) Eligibility outline: additionality and baseline scenario –Why the project should not happen on its own? –Sources of GHG emission reductions and total ER volume including possible leakage Local, national, and global benefits Risks

1.Project Financing –Bankability: sooner can achieve financial closure, better the chances of selection –Project costs already determined and realistic –Idea of how carbon would impact implementation or address expected financing gap 2.Credible baseline and adequate volume –Carbon credit volume should be sufficient to cover CDM or VER transaction costs –Suggested minimum threshold: 20 ktCO 2 per year or 100 ktCO 2 total before What buyers look for (1)

What buyers look for (2) 3.Commercially viable technology 4.Competent, credible counterparties clear champion and institutional arrangements sound legal arrangement -- who owns, who operates, what type of agreement between project participants 5.Viable business + operation model 6.Demonstration of sustainability, safeguards EIA and/or relevant environmental permits Compliance with social + environmental safeguards plus relevance to sustainable criteria of host country

PIN Content For national project approval: –See handout (India Example) For buyers: –Most accept World Bank template, available at

Preview: Purpose of PDD Project Design Document –Part of formal CDM requirements (unlike PIN) –One of very few legal requirements for CDM eligibility A detailed, well-substantiated document addressing key questions –How will project reduce GHG emissions? –Why is project eligible for CDM? –How will project risks be managed and shared by participants, and project impacts on stakeholders managed? Conveys project information to the relevant stakeholders –potential investors, validator (DOE), DNA, and public at large

1. Selection of most applicable, approved methodology: –Existing approved methodologies can be combined where appropriate. –If none exists, one can submit a new one or (minor) alteration of existing one, at own expense 2.Assessment & demonstration of additionality: –Most critical issue for project acceptance –Project will be refused if not proven 3.Articulation of Sustainable Development Benefits and Documentation of stakeholder consultations, permits, etc. 4.Sound monitoring plan – key for eventual verification Critical elements of PDD

PDD Content General description of project activity Application of a baseline methodology Duration of the project activity / Crediting period –Choice of the crediting period (10 years, 7 x 1 and 7 x 2 years, 30 years for A/R activities) (Application of) monitoring methodology and plan Estimation of GHG emissions by sources Environmental impacts Stakeholders’ comments Contact information on project participants

How to get started (1) Browse CD4CDM Project’s ‘CDM Project Pipeline’ Tracker Tool  Browse DVD/CD-ROM or UNFCCC CDM website: 

Official homepage:

 Reference Decisions of CoP and CoP/MoP –e.g. Marrakesh Accords Documents: –Guidelines –Templates –Reports –Modalities and Procedures Forms Procedures Guidance/clarifications

Thank you for your attention!