The LT Dipole July 8 th, 2014. Motivation Combine expertise of LBNL & TAMU to overcome common obstacles and reach higher fields with regular milestones.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Block-coil NbTi dipoles for 6 Tesla Rapid-cycling SuperSPS
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Report from WAMHTS-2 and opportunities for HTS Naoyuki Amemiya Kyoto University 1.
12 Tesla Hybrid Block-Coil Dipole for VLHC Raymond Blackburn, Nicholai Diaczenko, Tim Elliott, Rudolph Gaedke, Bill Henchel, Ed Hill, Mark Johnson, Hans.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
FCC Week 2015Design Options for 16 T LTS Dipoles – G. Sabbi 1 Overview of Magnet Design Options for LTS Dipoles in the 16 T Range GianLuca Sabbi, LBNL.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
Recent Developments in Nb 3 Sn Dipole Technology at Texas A&M Peter McIntyre Dept. of Physics Texas A&M University
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
Helical Solenoid Development
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Program overview: motivation, target parameters, timeline A.V. Zlobin 15 T dipole design review 28 April 2016.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
MQXC Nb-Ti 120mm 120T/m 2m models
TQS Overview and recent progress
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Model magnet test results at FNAL
ERMC/RMM activities May 2017
FRESCA2 Update on the dipole design and new calculations
EuroCirCol: 16T dipole based on common coils
Naoyuki Amemiya Kyoto University
HTS Magnet R&D at BNL Ramesh Gupta November 17, 2017.
the MDP High Field Dipole Demonstrator
Voltage tap layout and quench antenna options for the long QXF magnet
Model Dipole Fabrication & Testing 2016 Plan, Schedule, Budget
Presentation transcript:

The LT Dipole July 8 th, 2014

Motivation Combine expertise of LBNL & TAMU to overcome common obstacles and reach higher fields with regular milestones Modular approach –LT1: 13T Nb 3 Sn open-aperture (9x5 cm 2 ) –LT2: 15T, LT1 + a racetrack of BSCCO-2212 –LT3: 19T, LT2 + a flared winding of BSCCO-2212 Stress management and continuous support of reacted cable to avoid damage losses

Magnetics for LT1

Magnetics for LT2

Stress management structure Magnetics for LT3

Before pancake winding Add pic of just mandrel Window for quench heaters and voltage taps

Mandrel ‘heart’ Magnetic cutout also serves as a slot Common design allows part reuse Thin-skin slots into place

Pancake and associated structure

Pre-structure for flare These pieces provide supported form, and allow safe removal of flare 873mm bending radius, 10° arc (same as HD3)

Flared winding and structure Pins for flare? Window for quench heaters and voltage taps

Remove mandrel ‘heart’ and install spanner plates Aperture now cleared in end pieces Continuous support of Nb 3 Sn mitigates assembly damage

Assembling two halves Common wall pushes out plates through thick-skin Continuous support of Nb 3 Sn mitigates assembly damage

Removal of spanner plates

Completed coil package

Bladder/key magnet assembly Similar to HD2/HD3, yoke is keyed against shell, then coil package is inserted and keyed