Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.

Slides:



Advertisements
Similar presentations
G-131 & E/L-131: Exercise Evaluation and Improvement Planning
Advertisements

FEMA Updates April 10, Welcome and Introductions Andy Mitchell Division Director Technological Hazards Division National Preparedness Directorate.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
1 RIC 2009 Federal Emergency Management Agency (FEMA) Activities at Nuclear Power Plants Session Chairmen: Mel Leach Director, Division of Preparedness.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
NRC LICENSE APPLICATION PROCESS
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
Peer Review Training – National Science Foundation February 7, 2012 Appendix F – Checklist for Review of Monitoring Performed over Contracted Audits and.
What’s New in the REP Program? Revised Program Documents & Training April 29, 2014
1 Implementation of New Exercise Scenario and Demonstration Area Requirements April 21, 2009 Jacques Singleton Program Specialist, Emergence Management.
Human factors Training & Competence CaspianExplorer.com.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Session 121 National Incident Management Systems Session 12 Slide Deck.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Protection Against Occupational Exposure
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Webinar April 19, 2011 HazMat Grant Program: HMEP Application Guidance Overview and Explanation of the Sample Application for the HMEP Grant Program for.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
สถานการณ์ ท่านดูรับผิดชอบเรื่องการ เตรียมการและตอบโต้ภาวะฉุกเฉิน ของหน่วยงาน ขณะนี้ท่านได้ จัดทำแผนเผชิญเหตุของ หน่วยงานเสร็จเรียบร้อยแล้ว ท่าน ได้รับคำสั่งจากหัวหน้าหน่วยงาน.
Nuclear Energy Institute Initiatives NRC Region I/FEMA I, II, & III Joint Scheduling Conference Susan Perkins-Grew Senior Project Manager.
1 NRC REGION I, FEMA I,II, III Joint Emergency Preparedness Information Conference January 22, 2010 William Eberst Technological Hazards Division /REP.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Regulatory Framework for Uranium Production Facilities in the U.S.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Intervention for Chronic and Emergency Exposure Situations Developing a National Capability for Response Emergency Response Plans Lecture IAEA Post Graduate.
ISO Registration Common Areas of Nonconformances.
State Update Joint Exercise Scheduling Conference Wilkes-Barre, Pennsylvania January 20-22, 2010.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
A risk assessment is the process of identifying potential hazards an organization may face and analyzing methods of response if exposure occurs.
Emergency Preparedness: State & Local Developments and Possible Industry Impact Sue Perkins-Grew.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
NRC Update of Low Level Waste Emerging Issues
Office of Nuclear Materials Safety and Safeguards
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC’s LLW Regulatory Program: Update of Emerging Issues
HSE Case: Risk Based Approach.
Robert Kahler Branch Chief
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Research and Test Reactor Safety: The Regulatory Perspective
Adding Nuclear Power to the Grid
Research and Test Reactor Decommissioning Inspections
Group D4. - Nuclear fuel cycle, nuclear waste
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
TRTR Briefing September 2013
Louisiana School Emergency Management Program
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency National Preparedness Directorate Technological Hazards Division Radiological Emergency Preparedness Program Albert G. Coons

Albert Coons April 21, FEMA’s Responsibilities  Take the lead in the review of offsite emergency plans.  Determine whether offsite REP plans are viable by reviewing all plans and evaluating regularly scheduled exercises.  Pursuant to 44 CFR 353 Appendix A, respond to any requests by the NRC. Review 15 of the 16 NUREG-0654 Planning Standards -109 detailed planning criteria -Produce Interim Finding Reports (IFR)

Albert Coons April 21, Players in the Review of Applications FEMA Oversees offsite response planning, review, and evaluation for nuclear activities NRC Oversees onsite response planning and all regulation, licensing, and monitoring of nuclear facilities Memorandum of Understanding 44 CFR 353 Appendix A

Albert Coons April 21, Application Site Situations Situation 1 Situation 2 Situation 3 County Y State X County Y State X County Z County Y State X

Albert Coons April 21, FEMA Deliverables - New Reactor Licensing FEMA DeliverableDuration Acceptance Review Letter13 Working Days IFR for Requests for Additional Information (RAIs) 90 Working Days Situation 1 Site 120 Working Days Situation 2 or 3 site Applicant Response Time 48 Working Days 63 Working Days Situation 2 or 3 site IFR for Open Items (OIs)30 Working Days Applicant Response Time33 Working Days IFR for Reasonable Assurance (RA)30 Working Days

Albert Coons April 21,  Provided with Application  Jurisdiction REP Plans, existing and proposed  All counties/local jurisdictions in the 10-mile EPZ  All States in the 50-mile EPZ  NUREG-0654 Cross-Reference  Additional Review Materials  All-Hazard Emergency Plans (EPs)  Letters of Agreement (LOAs) Key Application Components for FEMA Review

Albert Coons April 21, Standard Operating Procedure  Supporting the Combined Licensing Application process for new reactors.  Provide an understanding and guidance during the review process from the earliest letter or memo to the completion of the Interim Finding Report (IFR).

Albert Coons April 21, Process Overview  Acceptance Review  Purpose: Ensures the application is sufficient for FEMA to begin Phase I review  Duration: 13 days  Deliverable: NRC – Acceptance Review Letter  Phase 1/1A Review – IFR for RAIs  Purpose: Define gaps in planning, equipment and training  Duration: 90 days – Situation Days – Situation 2 or Situation 3  Deliverable: NRC – IFR for RAIs Applicant – RAIs

Albert Coons April 21, Process Overview  Phase 2/1B Review – IFR for OIs  Purpose: Define unresolved issues  Duration: 30 days  Deliverable: NRC – IFR for OIs Applicant – OIs  Phase 4/2 Review – IFR for Reasonable Assurance  Purpose: Assessment of offsite planning that characterizes preparedness related tasks and conditions that must be completed or met in order to operate the proposed plant  Duration: 30 days  Deliverable: NRC – IFR for Reasonable Assurance

Albert Coons April 21, Interim Finding Conditions 44 CFR AdequateInadequate Plans are adequate and there is reasonable assurance that they can be implemented with only limited or no corrections needed. Plans are inadequate and cannot be implemented until they are revised to correct deficiencies noted in the Federal review Plans are adequate, but before a determination can be made as to whether they can be implemented, corrections must be made to the plans or supporting measures must be demonstrated (e.g. adequacy and maintenance of procedure, training, resource, staffing levels and qualifications, and equipment). Adequate – Corrections Must be Made

Albert Coons April 21, RAI Process

Albert Coons April 21, Contact Albert G. Coons