Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.

Slides:



Advertisements
Similar presentations
Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
Advertisements

A PRESENTATION FOR Americas Authority in Membrane Technology First Year of Operational Experience at Tennessee's Largest Membrane Filtration Plant KYTN.
© 2013 O’Brien & Gere Volute Press Application on Water Treatment Residuals 2013 NYC Watershed / Tifft Science & Technical Symposium September 19, 2013.
Zelienople Water Department Sources and Treatment.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Case Study: Disinfection byproducts in a recently constructed public water supply Maria O’Connell, P.E. Kristine Wheeler, P.E. New York State Department.
Surface Water Treatment Plant
Water Treatment Plant General Discharge Permit
City of Willits WTP Design and Funding Procurement Update February 24 th City Council Meeting Scott Buecker, P.E.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
Introduction to Environmental Engineering Code No. (PE389) Lec. 5 and 6.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Water System Planning Study
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Reverse Osmosis Feed Treatment, Biofouling, and Membrane Cleaning
E NVIRONMENTAL E NGINEERING 441 Lecture 3: Water Treatment Philadelphia University Faculty of Engineering Department of Civil Engineering First Semester,
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
1 Full-Scale Testing of Innovative High Rate Filter Media for Plant Expansion Bob Raczko, P.E. United Water.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the 7 th Power Plan November 18, 2014.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Considerations for Brackish Groundwater Use as a Water Supply for Small Water Systems and Municipalities Eddie C. Livingston, MSCE, P.E. Livingston Associates,
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
NC AWWA-WEA 2015 Annual Conference Monday, November 16, 2015 The Use of Chlorine Dioxide to Reduce TOC at Davidson Water, Inc. Water Treatment Plant.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
Electricity | Natural Gas | Water | Wastewater Adding Whey for Denitrification Dale Adams, P.E Managing Engineer, Colorado Springs Utilities September.
Update on RCR Permitting
1.Submit your Creek Survey if you haven’t already done so. 2.Which part of the water cycle is MOST responsible for polluting surface water? 3.Municipalities.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Desalination for Drinking Water Purposes TCEQ Trade Fair David A. Williams, P.E Robert W. Sims, P.E. Austin, Texas May, 2016.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Potable Reuse in Texas Where Are We Now? Joel Klumpp Texas Commission on Environmental Quality Potable Reuse in Texas Where Are We Now?
Brine Concentration Pilot Project (AquaSel) Update
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Grey Owl Municipal Water feasibility study
Water Filtration Plant Improvements Project Summary
AquaSel Brine Concentration Pilot Project Update
TVRWRF 23 MGD Expansion Disinfection System Conversion
Area Wide Optimization
Perris Water Filtration Plant Membrane Upgrade – Phase I
Affordable Energy Production from Renewable Fuel
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Water Reclamation Plant Feasibility Study Update May 28, 2014
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
Big Sky Wastewater Facility Plan Update
Linking AMPs to Short-Term and Long-Term Investment Plans
Southwest Section AWWA 2018 – Baton Rouge, LA
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Presentation transcript:

Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL

Engineering Projects Intake Repairs – goal to make sure the operation of the intake remains reliable and safe until more permanent upgrades can be completed. Coordination with Chisholm SUD and City of Georgetown on use of some of Brushy Creek MUD’s intake structure and electrical building site for their new intake and water plant facilities – goal to be cooperative without compromising desired current and future levels of operability and make sure upgrades are compatible with these future plans, i.e., location of surge tank and electrical building. Membrane Testing – goals – to meet TCEQ requirements, increase capacity, protect membrane investment to water quality changes.

Intake Repairs Testing of medium voltage cables and transformer at intake complete – acceptable for continued use. Pumps No.1 and No.3 are now in good reliable operating condition. Working with Plant staff to modify automated pump valve controllers. Signal and electrical shorts from flood have damaged relays and electronic controller. New splice to repair damaged cable on Pump No. 2 has been made but is not sealed yet. Power to compressor building – new breaker to be installed to determine if we can get power to intake structure – if not, temporary power from compressor building can be “run-down” to intake. CH2M HILL will provide report on testing and any final recommendations for repairs before more permanent upgrades will be made.

Pump No 2. Cable Repair step

Proposed Shared Intake

Intake Next Steps Brushy Creek MUD should make any remaining recommended repairs to intake for safe reliable service until upgrades constructed. CH2M HILL to provide proposal to begin design of permanent upgrades. Finalize agreements with Chisholm and Georgetown – design and construction to have some shared cost

Membrane Testing History of the Brushy Creek Water Facility July 2001 – Naismith Engineering/CH2M HILL completed PER –established treatment and capacity April 2002 to July Membrane Pilot Testing – established flow per membrane area on Lake Georgetown Water July 2004 – Design complete – TCEQ approves provided we check membrane operations with Stillhouse and Georgetown waters 2006 Plant starts operations and Stillhouse water beginning to be pumped to Lake Georgetown 2009 – Higher capacity needs, different water quality and need to test for TCEQ

Plant must have capacity for a peak day water demand. During design 6.25 mgd capacity selected – uncertainty of growth projections and relative ease of expansion. Demands are now at plant capacity – need additional capacity accepted by TCEQ Key is to balance capacity against membrane cleaning. The fewer membrane cleaning cycles the longer the membranes last. Things that effect membrane fouling – flow and water quality Plant Capacity

Changes in Water Quality Record Flood – short term suspended solids, manganese, low pH, low alkalinity – increase in fouling Record Drought – warmer water, higher organic foulants – algae – increase in fouling

Raw Water Turbidity Average up to 2001 – 3.5 NTU/ NTU

Raw Water Manganese

Raw Water Hardness

Status of Membrane Testing Effort- Completed Task 1, Initial Evaluation of Task 2, Draft of Task 3 1.CH2M HILL to identify TCEQ requirements. Summarize in TM. 2.CH2M HILL and BCMUD staff to define testing goals, including flux rate or flow rate to be the target for the test. Confirm with Pall the wash cycles and mode of operations. CH2M HILL to summarize in TM. 3.CH2M HILL to develop a detailed protocol for 30-day test. Submit to TCEQ for approval. Make changes as required by TCEQ. 4.BCMUD staff to operate selected test rack for 30-day test following approved protocol. CH2M HILL to provide limited technical support. 5.CH2M HILL to prepare report outlining full-scale test results. Submit to BCMUD and TCEQ for review/approval.

Initial Findings Staff has made some positive changes to adjust to changes – change to a coagulant that has recently shown to be more effective for membrane systems, added more modules Some foulants still continuing to require membrane cleaning at higher rates than desired for capacity and membrane life. With the addition of the modules and by addressing the foulants, there is a significant opportunity for higher capacity and less cleaning – thus meeting some important goals – more capacity, better adjustment to changing water quality, few cleans – which protects your investment and extends its life.

Recommendation To get the best value of the plant, get the best rating we can from TCEQ by making some upgrades for capacity and treatability

Upgrades UpgradeUseBenefitCost Range (capital) Additional water softener Soft water must be used for cleaning membranes otherwise scale can form Higher wash volumes for more capacity and complete cleans quicker. $40,000 to $45,000 Additional air scrub capacity Air is used to scrub and clean membranes along with chemicals – more modules need more air Better cleaning and protection of membranes $75,000 to $85,000 Addition of sodium permanganate to raw water Oxidizes manganese and organic compounds Reduces manganese levels to the membranes $60,000 to $80,000 Increase storage of cleaning chemicals and blend tank Chemicals used to clean membranes More modules require higher wash volumes – need more storage that is also makes it safer for handling $60,000 to $80,000 Backwash supply TankWater used to flush membranes after cleaning Better cleaning and protection of membranes $20,000

Upgrades UpgradeUseBenefitCost Range (capital) Spare Rack Mounted air Solenoids - Controls valve air on racks 6 weeks to order – rack would be down if not working $10,000 Improve Decant basin solids settling Basins settle solids and recycle water back to ponds Reduce organic loading to ponds – lower disinfection byproducts $20,000 to $30,000 MiscellaneousOther ancillary needs like air filters on racks, lab instruments Improved operations$15,000 to $25,000 Total$300,000 to $375,000 Does not include engineering cost

Next Steps Make Upgrades Submit test plan based on upgrades Test Potential to get 2 mgd more capacity with upgrades than if not done – that $0.19 per gallon of treatment capacity – compared to new plant that is $3 per gallon of treatment capacity.