CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)

Slides:



Advertisements
Similar presentations
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Advertisements

Heavy Concrete Construction Formwork
Present Procedure for cutting stuck casing on Drilling PLATFORM
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Presented by: Ginnette Clark Terri Hall Robert Ishmael Michael Petry.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Chapter 34 Bridge Construction.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
EQUILIBRIUM OF RIGID BODIES IN TWO DIMENSIONS
Excavating and Lifting Part 3
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
Chapter 19 Floors.
Installation. Indoor Unit Installation Typical Installation.
AUTOMATIC LATHES These are machine tools in which components are machined automatically. The working cycle is fully automatic that is repeated to produce.
TP4-ENERSOL-TD/PV double function
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Instruction Manual for inserting the CMS ZDCs using the crane.
Classification of Lathe
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
Installation. Indoor Unit Installation Typical Installation.
CMS ZDC Remote Exchange Crane Paul Debbins University of Iowa June 26, 2008.
ET 493 Instructor: Dr. Koutsougeras By Rhett Falcone and Scott Dauzat Advised by Dr. Mitra.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Precision Layout Unit 21.
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
POWER TOOLS Electric drills
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
HiRadMat box relative to beam position and vertical lift table.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Problem Statement & Conceptual Designs September 6, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Blocking a b c d.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Annex 4 - Moving Frame and Whiffletree assembly
Baby-MIND Modules & Services
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
CLIC Handling Engineering Update
ProtoDUNE – DSS Installation, Alignment and QA
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
MICE Partial Return Yoke Mechanical Design
MACH 118: Lathe & Mill 1 Lathe Workholding.
INSTALLATION SEQUENCE
nTof pipe cutting proposal Robotic platform design
Mounting a BalanceBox®650 to a brick wall
F&T Inc. OVERHEAD CRANE SAFETY.
Unit 2: Design Fundamentals
Bunker Wall Design Wall ESS
US-HiLumi – Shipping Post Assembly Status
Presentation transcript:

CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane) to implement an alternate method to remove the BARS payloads from the ZDC Crane in the event of severe inoperability of the ZDC Crane system. Paul Debbins May 22, 2014

Example Davit crane for Payload Extraction: Beech B lbs (450kg) capacity At Boom length = 1070mm

Steel Bars Payload Attachment Points CMS ZDC Crane Emergency Payload Removal HAD Module EM Module 330kg total Lifting Bolt: Bossard mm bolt This feature exists in Steel Bar – used For all previous lifting EM Module lifting eye EM module cannot be fixated From center point due to Presence of lifting lug. Offset Lifting eye provided for Fixation of emergency payload Removal system Lifting Lug 65kg Total

CMS ZDC Crane Emergency Payload Removal Lifting Lug and Hand “Grappling” Tool Lifting Lug Grappling Tool Lifting lugs are fitted with 12,5mm thru hole. Grappling tool is ~1,25m steel tubing with 12mm pin fitting Grappling tools insert into thru hole of lifting lug and provide attachment point for manual steering of the Payloads when suspended from hand (davit) crane

CMS ZDC Crane Emergency Payload Removal Beech B1000 geometry, clearances to ZDC Crane during operation B1000 Davit crane Boom has 12mm Clearance below ZDC crane carrier Beam. <5mm lift needed To disengage payload From ZDC Crane. 200mm clearance between ZDC Crane Carrier Beam and Payloads Davit crane is capable to Insert into spaces of ZDC Crane and couple to payload 450kg max CAD Model with Basic Crane Dimensions and Movable Joints

Line in tunnel floor is origin of Tunnel wall – maximum extents of Davit crane platform Tunnel Floor Monorail Beam – lowest overhead obstacleTunnel wall outline Tunnel Floor CMS ZDC Crane Emergency Payload Removal Tunnel Geometry and Clearances Drawings Referenced: LBL 24C4246 E CERN LHCJ __0013 CERN LHCJ__0014

CMS ZDC Crane Emergency Payload Removal Case studies of Removal in Different stages of ZDC Crane Position 4 positions of ZDC Crane are considered Case 1: ZDC Crane Positioned over TAN slot – Payload can be in any vertical lift position. The Davit crane is used to lower the payload back into the TAN slot. Case 2: ZDC Crane is positioned at Maximum Height excursion. The Davit crane is used to remove the payload from the ZDC Crane and place the payload into a Special Sarco reserved for this purpose. This is NOT the usual Sarco used in normal ZDC Crane operation. Case 3: ZDC Crane is positioned centered over Sarco – Payload is raised (not penetrating Sarco) This condition is the maximum extension of the system toward the transport side tunnel wall. The Davit crane is used in the same manner as Case 2. Case 4: ZDC Crane is positioned centered over Sarco – Payload is partially lowered into Sarco. In this case the Davit crane cannot be used as the lowered payload holds the Sarco captive in place which obstructs the placement of the Davit Crane. A cable winch is used in this case to lower the Payload into the Sarco directly.

Case 1: Payload raised partially or fully – still centered over TAN Slot These show the geometric placement of the Davit to make initial fixing to the Payload in The fully raised (worst case) position. Adequate clearances exist to tunnel features. Prior to the placement of the Davit crane – the normal Sarco is removed from the area To make room for the Davit crane.

Case 1: Next steps The Davit crane is raised slightly to lift the payload off from the fixation pins. The fixation pins are Removed and the payload is then progressively lowered back into the TAN slot

Case 1: final steps The payload is fully lowered into the TAN and the Davit crane is disconnected from the payload. The HAD section and EM section are each done separately in similar manner.

CMS ZDC Crane Emergency Payload Removal Case 2: Payload Fully Raised, Rotation to Maximum Vertical Excursion to overhead cable tray In this condition there exist 50mm clearance of ZDC crane to cable tray on + side TAN, 120mm clearance on – side TAN The Davit crane is fixed to the payload as in Case 1. Again adequate clearances exist to attach the Crane to the payload and to the space and services of the tunnel. The Davit crane lift the Payload ~5cm To free the fixation pins which are removed.

Case 2: extraction of Payload away from ZDC Crane The payload is lowered slightly to allow the Lifting Bridge fixtures to clear. It is also possible to unbolt the lifting Bridge components to remove them after the payload is suspended from the Davit crane. The Davit crane and payload are moved straight back from the TAN toward the transport side tunnel wall. Maximum position of Davit crane away from TAN

Case 2 - continued The Davit crane and suspended payload are then rotated 90 deg. The grappling tools (not shown) allow 4 persons to maintain positive control of the suspended payload from a distance of ~1.5m.

Case 2 – Final steps The Davit crane cannot fully lower the payload to the floor. The distance between the floor legs of the Davit crane are Too narrow for the usual Sarco base platforms. A spare Sarco exists at CERN which can be placed on a narrower platform That will fit between the legs of the Davit crane. The Davit crane is then positioned to span the special sarco and The payload is lowered into the Sarco and disconnected. Special Sarco To fit with the Davit Crane. This sarco Will be reserved for This purpose.

Case 3: ZDC Crane is fully extended toward Transport Side of tunnel. This case is the minimum clearance for the Davit crane against the Transport side tunnel wall. With the davit crane placed at the furthest limit to the Transport side tunnel wall, there is enough clearance to allow The fixation of the payload to the crane. The operational sequence follows then, the exact steps of Case 2.

Case 4: Payload is partially inserted into receiving Sarco In this case the receiving sarco cannot be removed to allow placement and use of Davit Crane. A hand operated cable winch is affixed to the side of the crane and with the use of a pulley bolted to the ZDC crane top most beam the payload is lowered directly into the Sarco

Bracket mounted to the End Plate of the ZDC Crane. Fixation Is with 6 M6 bolts This bracket can be mounted Identically on both sides of the ZDC Crane There exists clearance Between line shaft And lifting point of Payload. Line shaft Can also be removed. Suitable cable winch is Mounted on Bracket Cable Pulley bracket Bolted to frame Case 4: Proposed winch solution

Drawing Ref: LBL 24C4236 EM Module payload removal. When positioning the Davit crane for EM module payload removal There exists adequate clearance between the Davit crane leg and The front floor jack of the TAN 384mm clearance of Davit Crane leg to Tan front faceTan Jack floor plate occupies space 300mm Back from TAN face The EM module payload is removed in the same fashion as the HAD module for All cases.

The Davit crane used in this demonstration is a US based model. A suitable European model needs to be identified for use at CERN.