Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

Sectional Assembly and Installation
Slab Project Asian Lantern or Tea Pot
A Lesson in the “Math + Fun!” Series
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Mosaics. History of Mosaics Mosaic can be traced back through several cultures. The first culture attributed with mosaics was the Aboriginal Native Americans.
NGfL CYMRU GCaD FLOOR COVERINGS.
Interior Wall and Ceiling Finish
Background Surface Treatments
InvisibleSHIELD™ Installation invisibleSHIELD™ Product Installation Training Carefully review product installation instructions Practice product installation.
Engineering Drawing Lecture 3
Study Lesson 2 Using drawing tools & applied geometry.
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
HVAC523 Soldering.
Mirror Mosaic. The Purpose The goals of this assignment are to: Practice and improve your straight line cutting Learn to use the grinder to shape pieces.
Pattern Layout, Pinning & Cutting
Grouting Ceramic Tile This step comes after the tile is installed and has had time to cure. It is very important to either follow the instructions listed.
ICRA Panel System Installation Instructions
Steps to Regrout Bathroom Tile Ph. No.(914) or (888)
Typical Walk-in Closet with elfa® décor
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Building a Wooden Planter Box. The Most Important Part of any Project is the Planning Determine what type of wood to use for the box (pine, cedar, cypress,
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Design and Technology Marking and Measuring Tools.
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
Wall Coverings  Selected according to: ○ Function ○ Size ○ Existing furnishings ○ Budget ○ Maintenance.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
CONSTRUCTING A FIVE CABIN LATRINE
PLAN #PartProcessTools and equipmentQuality controlSafety *Aprons must be worn is ALL stages of manufacture Tim e 1 MDF base Mark out on MDF piece Pencil,
Building a clock PART 1: The Body. Gathering materials  The wood that you will be using is called Maple. You can identify it by knowing that it is: Heavy.
Step 1: Prepare the surface The floor should be clean, dry, flat and sound. The floor should be free from oily/waxy or curing compounds.
Basic Screen Printing Procedures for T-Shirts GOP_5-2 Screen Printing.
Dry lining by direct bond – overview
Sumo Robot. Materials Part NameQty 3-9 volt Motor2 Gear sets2 Wheels4 Axles 4 Base1 Straws2 Switches2 Bolts & Nuts4 Hook up wire15'
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Name: ___________________
Scratch Build a Water Tower
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Drawing & Drafting Tools. T-Square Why is the letter “T” in its name? Why is the word “square” in its name?
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Week No. 02 Lesson Name File
Principles of Manufacturing Copyright © Texas Education Agency, All rights reserved 1.
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
Finishing your clay project. Set-up  Get your piece from the kiln room  Examine it  Does it have any rough areas or small bumps?  Get some sand paper.
Agricultural Mechanics Career Development Event Concrete and Masonry
 Step 1: Digging the Hole  First dig yourself a good hole. I had a look at pond liners that were available first and knew that I could get one that.
Everything about drywall (lather)
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
Cones.  Cones are shapes that have a circular base and come to one point at the top.
One Point Perspective: City Drawing A Tutorial
One Point Perspective: City Drawing A Tutorial Art 1: Fall 2011 MMRoberts.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
How to dry mat your photos. Supplies White or black mat board Image Millimeter ruler T-square ruler Mechanical pencil Exacto Knife and Green Gridded cutting.
Cones. Cones are shapes that have a circular base and come to one point at the top.
The problem is to design, construct and test the most efficient bridge within the specifications. Back to start of slide show.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Grouting Armstrong Alterna Tile
BUILDING CONSTRUCTION
One Point Perspective: City Drawing A Tutorial
Presentation transcript:

Method to fix wall tiles

Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the water penetrate freely into the tiles.

Step 1: Prepare the wall surface The wall surface should be clean, dry, flat and sound. The wall surface should be clean, dry, flat and sound. The floor should be free from oily/waxy or curing compounds.

Step 2: "Square-off" the walls This involves finding the appropriate horizontal and vertical lines on which to begin applying the tile. First, use the level to locate the lowest point of the wall you are tiling. Floors and tubs are often uneven. At this point, use the level to draw a perfectly horizontal line one full tile height above the floor or tub line. (Figure 1).

You may choose to nail a very straight furring strip below and against this line to assist in the even application of tiles and to prevent tiles from slipping out of line and down the surface of the wall.

Step 3: Find the Center : Find the center of the wall. Lay tiles side by side along the floor from this point to the right corner or end of the area to be tiled (Figure 2).

Step 4: Alternative Centre method This is not possible, mark off a strip of wood in tile widths (Figure 3) and use this to calculate the location of the tiles. If less than ½ a tile would be needed to finish the row, move the "center point" to the left 21/4". This adjustment will insure a larger piece of tile at either end, and thus a more attractive installation.

Step 5: Draw vertical line: Use your level or plumb line to draw an exactly vertical line at the "center point" from bottom to top of the area to be tiled (Figure 4)

Step 6: Apply the tile to the wall: Decide where to start. If there is an outside corner or edge, start there and go to the inner corner. Otherwise, start at the "center point". Proceed in the order shown (Figure 5). Holding the notched trowel at a angle, apply the mastic evenly.

Cover only a few square feet at a time Figure 5 until you "get the hang of it." Apply no more than you can cover with tile in 30 minutes. For hard to reach areas, spread mastic on the back of each tile before placement.

Step 7: Place tiles: Place the tiles carefully, in the order shown (Figure 6). Either flop them up into position from the bottom edge, or press them into place with a slight twist. Too much sliding will force mastic up into the joints. Press firmly into place. Use the level often to check horizontal and vertical alignment of the tiles as you work.

After all whole tiles have been applied, wipe away any mastic in unoccupied spaces. Do not allow it to dry. Allow the tiles to set for 4-5 hours before removing the furring strips (if used) and applying the cut tiles.

Step 8: Cutting Tiles: Cutting tiles is not difficult. If a tile cutter is not used, scratch the glazed tile surface with a glass cutter and a "straight edge" at the desired cutting line. With glazed side up, lay the tile on top of a dowel (a pencil or coat hanger wire will do). Press downward on both sides of tile for a clean break (Figure 7). Smooth cut edges with the whetstone. To make curved cuts or notches, mark area to be removed with a pencil. Use tile nippers or pliers to cautiously nip away the waste, a little at a time. If cuts are to be covered by fixture plates, perfection is not required.

Step 9: Further Cuts & Cleanup: To apply a tile completely around a pipe, first cut tile in half, then nip away the space for the pipe (Figure 8). Remove any mastic on the face of the tiles with mastic solvent or a razor blade. Allow tiles to set at least 24 hours before proceeding with the next step.

Step 10: Apply the Grout: Mix the grout according to package instructions. Use the rubber faced trowel, squeegee or firm sponge to spread grout diagonally across the face of the tile, and thus into the joints (Figure 9).

Step 11: Finishing up: Wipe excess grout away with a clean damp sponge. Use a popsicle stick, eraser or toothbrush handle to remove excess grout from joints (Figure 10). Remove any grout that accumulates in the space between tub and tile. This space should be filled with tub caulking to insure a tight, waterproof seal. After the grout dries enough to form a haze on tile, polish the surface with a dry cloth. To insure the lasting beauty of your tile installation, coat the grout with a silicone sealer to protect it from dirt or discoloration.