Training the dipoles A.Werveij What did we learn without beam in 2008 ? Superconducting electrical circuits K-H.Meß The Sector 34 Incident Ph.Lebrun Calorimetric.

Slides:



Advertisements
Similar presentations
February 2009 Summary of Chamonix 09 Steve Myers.
Advertisements

Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
CRYOGENICS AND POWERING
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
The Sector 3-4 incident at the LHC: fault tree and corrective measures Ph. Lebrun Risk Analysis Review Committee CERN, 5 March 2009.
Expected Quench Levels of the Machine without Beam: Starting at 7 TeV ? P. Pugnat CERN, Geneva, Switzerland LHC Project Workshop Chamonix XV, Tuesday 24.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
LHC Status ReportLHC Status Report Lyn Evans 96 th LHCC meeting, CERN 19 th November 2008.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
R.Schmidt, HC 28/5/ Access to underground areas during powering Risk: accidental massive helium release (as on 19 September) when superconducting.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
The integration of 420 m detectors into the LHC
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
HL-LHC IT STRING and Series test of SC link
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
Experience: past events and accidents
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Powering from short circuit tests up to nominal
Brief report of the hardware commissioning activities
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Presentation transcript:

Training the dipoles A.Werveij What did we learn without beam in 2008 ? Superconducting electrical circuits K-H.Meß The Sector 34 Incident Ph.Lebrun Calorimetric and electrical measurements and related software N.Catalan -Lasheras LHC Cryogenics: What did we learn from cool-down to first beams S.Claudet What else did we learn? M.Pojer Roberto Saban & Mirko Pojer

Training the dipoles 2R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? A.Verweij in sector 56

Training the dipoles 3R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? A.Verweij in sector 56

Training the dipoles 4R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? A.Verweij in sector 56Sector Number of magnets Number of quenches to 7 TeV 6 TeV 6.5 TeV (±30%) Est. 1 Est. 2 Est. 3 Est Total Est. 1: Based on 115 MB’s that have been submitted to a thermal cycle in SM-18 (2008 before HWC, P. Xydi and A. Siemko) (2008 before HWC, P. Xydi and A. Siemko) Est. 2: Extrapolation from sector 5-6 data + estimate 1 for ALS & ANS Est. 3: 2 quenches per NOE magnet + estimate 1 for ALS & ANS Est. 4: 3 quenches per NOE magnet + estimate 1 for ALS & ANS 993 / 8 = / 3 = / 8 = / 3 = 41

5R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? K-H.Meß Superconducting electrical circuits Harmless  The third current lead shared by two circuits (Kirchoff’s Law)  Short inside the dump resistor on the QF of Sector 45  Short to ground on the dump resistor on the QD of Sector 56  Missing resistor on one of the poles of an undulator which gave a very exotic transfer function  Leveling of the DFB to properly wet the superconducting cable Potential inconvenience to operation  Distribution of the conductors on cables sharing the same DFB but on different circuits – symptom: apparent detraining  The reference magnet puzzle – magnetization cycle Potentially dangerous  Symmetric quenches  Transient spike when the dump switch opens due to the difference in Eddy currents in the two apertures  Quench back in corrector circuits inducing coupling on other circuits … up to quenching the main magnets  Pending: splice and voltage tap non-conformities Unresolved  MCBX and MCBY mystery: unexplainable transfer functions  The hunch on the MCBYs  Fast quench propagation observed on only the dipole circuits Surprises

Mandate of the Task Force  Establish the sequence of facts, based on experimental measurements before incident, observations after incident and timing  Analyse and explain the development of events, in relation with design assumptions, manufacturing & test data and risk analyses performed  Recommend preventive and corrective actions for Sector 3-4 and others Mandate of the Task Force  Establish the sequence of facts, based on experimental measurements before incident, observations after incident and timing  Analyse and explain the development of events, in relation with design assumptions, manufacturing & test data and risk analyses performed  Recommend preventive and corrective actions for Sector 3-4 and others 6R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? Ph.Lebrun The Sector 34 Incident Temperature drift during the 7 kA current flat top (15 Sep 2008) Measured versus simulated incident with 220 n  joint and bad contact with U- profile and wedge No electrical contact between wedge and U- profile with the bus on at least one side of the joint No bonding at joint with the U-profile and the wedge

7R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? Ph.Lebrun The Sector 34 Incident The current decay from 8700 A EnergyMJ% Stored in the magnets Dissipated in UJ Dissipated in UA Dissipated in cold mass Dissipated in electrical arcs

8R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? Ph.Lebrun The Sector 34 Incident

9R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? Ph.Lebrun The Sector 34 Incident Calorimetric measurements Electrical measurements on «suspect» cells/subsectors powered at limited current During further power tests, track temperature evolution in normalized conditions Modify quench detection system to include interconnects and bus bar splices Consider option to measure currents in 13 kA circuits at both ends of sector and detect differentials Review possible improvement of mechanical clamping of interconnects and gradually implement whenever possible Prevention of initial fault Recommendations Mitigation of consequences Increase number/size of relief devices on cryostat vacuum vessels Review number, size & position of pressure relief devices on beam vacuum system Review closure logic of beam vacuum sector valves Consider possibility of triggered opening of quench relief valves below set pressure Consider general firing of quench heaters Reinforce external anchoring at locations of vacuum barriers Reexamine personnel underground access rules Review location of AUG in tunnel and protection from blast Review recorded signals, recording frequency and time stamping coherence among different systems

10R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? N.Catalan-Lasheras Calorimetric and electrical measurements Sector 12 7 kA 9.3 kA +40 mK -10 mK Relative temp 1 or 2 hour flat tops 7 kA 8.5 kA7 kA Relative temp Sector 23 Sector 34 Sector 45 Sector 56 Sector 67 Sector 78 Sector mK -10 mK Relative temp All the current plateaux were scrutinized for suspect temperature increase Unstable conditions and dynamic temperature control prevent accurate calculations. All the current plateaux were scrutinized for suspect temperature increase Unstable conditions and dynamic temperature control prevent accurate calculations.

11R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? N.Catalan-Lasheras Calorimetric and electrical measurements  U(  T ) Assessment of  the baseline slope (valve opening mismatch)  the temperature increase during powering plateau  the internal energy variation (J/kg)  the deposited energy assuming a mass of 26 l/m of He Assessment of  the baseline slope (valve opening mismatch)  the temperature increase during powering plateau  the internal energy variation (J/kg)  the deposited energy assuming a mass of 26 l/m of He ~ 2 7 kA The new powering procedures will demand mandatory calorimetric and electrical tests in ALL sectors at the beginning of the next LHC powering campaign

12R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? N.Catalan-Lasheras Calorimetric and electrical measurements 0.7mV/7kA=100nOhm 0.7mV*7kA=4.9W Snapshot on : 0.85mV*8.4kA=7.1W Calorimetric measurements spotted a suspect region in Sector 12 an inter-pole splice resistance of 105 nOhm in magnet 2334 (B16R1)

13R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? S.Claudet Cryogenics: from cool-down to first beams ≈15K/d x 13 d ≈8 K/d x 8 d ≈12 K/d x 4 d “25 days for 20K” + 3 days for Filling + 2 days for 1.9K  30 days (4 to 5 wks) “25 days for 20K” + 3 days for Filling + 2 days for 1.9K  30 days (4 to 5 wks)

14R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? S.Claudet Cryogenics: from cool-down to first beams Running two sectors with one cryoplant was tested during powering Not valid for large transients, but an interesting alternative for low beam loads. It is a validated fall-back scenario if serious problems with a refrigerator Running two sectors with one cryoplant was tested during powering Not valid for large transients, but an interesting alternative for low beam loads. It is a validated fall-back scenario if serious problems with a refrigerator

15R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? S.Claudet Cryogenics: from cool-down to first beams Non conformities were detected, workarounds found during the run and consolidations actions ongoing level gauges on stand alone magnets, DFBLC heat load, valves on current leads, heat loads on the triplet, etc. Stability was achieved stable services, global refrigeration mastered, 15mbar established, DFB, current lead and beam screen cooling loops stabilised Recovery from quenches or failures a lot of experience gained and results obtained Towards more stable services electricity, cooling water controls, insulation vacuum Getting ready for round the clock operation

16R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? M.Pojer What else did we learn? The Procedures The Tools which implemented the procedures and assisted the operators during the execution and the analysis Sequencer Post-Mortem browser PIC supervision QPS supervision Nominal Powering to Nominal (P2N) Databases … others were developed during the hc efficiency, automation and no compromise Some teething problems were identified and were corrected or are being corrected remote resets, communications problems, timing, coherence between time stamps, etc.

17R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? M.Pojer What else did we learn? Hardware problems 600A-10V LHC type power converters QPS requires a smooth change in current, otherwise it trips LHC 600A-10V: 0V-crossing distortion The power converters generate some distortion when crossing through zero voltage with current in the load  QPS trips 600 A-10 V Crowbar Issue Some PCs don’t have the crowbar and are not safe under certain conditions Reduced dI/dt and d 2 I/dt 2 which could limit operation and physics Frequent clogging of water filters installed on cables and converters lines  flow reduction and stop of the converter ECR to add crowbar on those circuits A decision was taken to change all filters around the machine from the present 50 μ to 100 μ mesh

18R.Saban Feb 24th, 2009LHC Performance Workshop Chamonix - What did we learn without beam in 2008? Conclusions Many surprises : training & sector 34 During the commissioning the equipment owners and the operation crews gathered the experience which they expected to re-commission, run and debug the equipment The incident in sector 34 requires modifications of the hardware, upgrade of protection systems and the development of additional test procedures While during most of the commissioning campaign the observations matched what was expected; in a few cases however, they revealed non-conformities some of which remain to be understood, followed and corrected or coped with