Responsibility Assignment Matrix (RAM) — Purpose  Ensure that all tasks are assigned to people  Show levels of involvement of people to work.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

A Short Course in Project Management
Lesson 15: Closing the Project Topic 15A: Close Project Procurements Topic 15B: Close the Project or Phase Administratively.
WBS: Lowest level OBS: Lowest level
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
1 Operations Management Lesson 5 Project Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Lecture 4 Project Management Chapter 17.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Roberta Russell & Bernard W. Taylor, III
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Software Project Management Task Estimating and Scheduling
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
The Triple Constraint Cost Quality Schedule Within Available Resources Project Scope.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Project Management Tools and Techniques An Introductory Course in Project management Foundations.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Scheduling Class 7.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Project Management.
Project Management – PTM721S
Chapter 3 Project Management. Chapter 3 Project Management.
Project Management MGT 30725
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management: PERT/CPM
deterministic Fixed and known in advance, representing a
17 Project Management.
Chapter 6: Project Time Management
17 Project Management.
Project Management CPM Method Tutorial-p2
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 16 – Project Management
PROJECT MANAGEMENT (BSBI 622)
Exercise – A small building.
AOA A style of project network diagram in which arrows
Presentation transcript:

Responsibility Assignment Matrix (RAM) — Purpose  Ensure that all tasks are assigned to people  Show levels of involvement of people to work

Linkage Between WBS and OBS X OBS WBS X X X

Responsibility Assignment Matrix R - RESPONSIBLE A - APPROVE S - SUPPORT (DOES THE WORK) I - INFORM C - CONSULT LEGEND SSSISSSSIS IDENTIFY POTENTIAL MARKET IDENTIFY SURVEY POPULATION DEVELOP SURVEY TEST SURVEY ON SAMPLE FINALIZE SURVEY CONDUCT SURVEY COLLECT SURVEY ANALYZE DATA REPORT RESULTS AND SUGGESTION CCRRRRRRCCRRRRRR RIIAIIARIIAIIA S R/S S RIIIIARIIIIA CUSTOMER TEAM MEMBER SENIOR MANAGEMENT SUPPORT STAFF PROJECT MANAGER MARKETING STUDY RASIC Method

RASIC Coding System  R = Responsible  Ensures that the assigned work is completed  A = Approve  Approves that the work meets all requirements  S = Support  Does the work  I = Inform  Is kept informed of work status  C = Consult  Is consulted on the work

Guidelines  Team member names should be shown across the horizontal axis in the final matrix.  There should be only one R and one S for each activity if possible.  Every activity should have an R and an S. R/S for an activity is acceptable.  The project manager will have the majority of Rs.  The customer and senior management have the majority of As and Is.

Project Schedule — Purpose  Determine if requested completion date is possible.  Identify start and completion dates of all work.  Determine the controlling sequence of activities.  Provide data for resource allocation.  Track progress by providing a baseline.

Scheduling Step 1: Step 1: Estimate Activity Durations

Estimating Techniques  Deterministic  Best Guess  Delphi (Consensus)  Probabilistic  Program Evaluation Review Techniques (PERT)

Scheduling Step 2: Step 2: Determine Activity Sequence By Creating a Network Diagram

WBS/Network Diagram Linkage bdacf g jieh jac fg i bde h

Network Diagram Methods Precedence Diagram Method A B C D J E F G H I Arrow Diagram Method A B C D E F G H I J

Create a Network Diagram  A  A is the first activity  B, CD A  B, C and D are dependent on A  EF B  E and F are dependent on B  GC  G is dependent on C  HC D  H is dependent on C and D  IF G  I is dependent on F and G  J E, I, H  J is dependent on E, I, and H  J  J is the last activity

Precedence Diagram Method Logic Connection Activity A B C D E F G H I J

Scheduling Step 3: Step 3: Calculate the Schedule Using Critical Path Method (CPM) Procedures

What’s is the Critical Path?  Riskiest path in a project  Path with the most important activities  Path with least slack  Path with least resistance  Path with longest duration  Path to Emerald City

What’s is the Critical Path?  Path with least slack  Path with longest duration

Determine the Critical Path  A = 2 weeks  B = 1 week  C = 3 weeks  D = 1 week  E = 4 weeks  F = 3 Weeks  G = 2 weeks  H = 1 week  I = 2 weeks  J = 1 week

Project X — Critical Path Solution Activity Name Float Duration ES EF LS LF E 4 B 1 F 3 J 1 I 2 G 2 C 3 A 2 D 1 H

Scheduling Step 4: Show the Schedule by Drawing Gantt and/or Milestone Charts

Enhanced Gantt Chart Jan Feb Mar April May June Task A Task B Task C Task D Task E Task F - Non-Critical - Slack/Float - Critical

Gantt Charts  Simple to construct  Easy to interpret  Good for management reporting

Project X — Gantt Chart Solution Duration Time Activity ABCDEFGHIJABCDEFGHIJ Non-Critical - Slack/Float - Critical

Develop a Project Schedule  Prepare a project schedule for the room you are going to paint.