PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Chapter 3 Project Management.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
MGMT 483 Week 8 Scheduling.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
Project Scheduling. SEEM Project Scheduling (PS) To determine the schedules to perform the various activities (tasks) required to complete the project,
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
Project Management Techniques.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Time Management
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Network Planning Methods Example PERT & CPM
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Project Scheduling IENG 321 IENG 321.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Project Planning & Scheduling
Project Management for Business
Project Scheduling Chapter 14.
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

PROJECT MANAGEMENT

Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks PERT and CPM Methods Use of Project Concepts

What is a “Project”? A project is a series of related jobs directed towards some major output and requiring a significant period of time to perform. Distinguishing characteristics of projects Examples – New product introduction Installation of Equipment

What is “project management”? Project management can be defined as planning, directing, and controlling resources (i.e., people, equipment, material) to meet the technical, cost and time constraints of the project.

Examples Building constructionDesigning an advertising campaign Research and development Startup and shutdown of a plant Computer systems design Manufacturing of aircraft, ships or large machines Fund raisingPlanning a military invasion

Objectives and tradeoffs Three objectives:- Costs- Sum of direct and allocated costs Schedule – Project milestones and completion dates are set at the outset. Meet them or trade-off between costs Performance – the performance characteristics of the product or service. Trade-off may also be required here.

Objectives and Tradeoffs Meet the specifications Stay within the budget

Project Management Activities and Decisions Planning Scheduling Project Control

Planning Identify the project customer Establish the end product or service Set project objectives Estimate total resources and time required Decide on the form of project organization Make key personnel appointments Define major tasks required Establish a budget

Scheduling Develop a detailed work breakdown structure Estimate time required for each task Sequence the task in the proper order Develop a start/stop time for each task Develop a detailed budget for each task Assign people to tasks

Control Monitor actual time, cost, and performance Compare planned to actual figures Determine whether corrective action is needed Evaluate alternative corrective actions Take appropriate corrective action

Scheduling Methods Two main types of scheduling methods are in use. They are generally classified as 1.Gantt charts 2.Network Methods a.CPM b.PERT

Gantt Chart Project Example (Figure 1) Week

Network Methods-1 CPM – Critical Path Method Developed by E.I. Duponds & Co as a way to schedule the startup and shutdown of major plants. Plant activities were repeated often so activity times were fairly well known. CPM uses time-cost trade-off. Four estimates for each activity are used: normal time, normal cost, crash time and crash cost

Network Methods-2 PERT-Program Evaluation and Review Technique First developed in the mid 1950’s for the Polaris submarine project. It was used to schedule 3000 subcontractors, suppliers and agencies. It is credited with bringing that project ahead of schedule by up to two years.

PERT PERT requires three time estimates for each activity: optimistic time estimate most likely time estimate pessimistic time estimate These estimates recognize the uncertainty in activity time for real life situations

PERT Activity times are converted to expected time of completion and variance for each activity

Network Project Chart (Figure 2) Start 410 Dig basement Pour footing Lay block foundation Install main floor Erect frame Finish below- grade work Secure outside sheathing Install roof boards Install windows Finish rough-in frame

Constant-Time Networks Activity times assumed to be constant “Dummy” activities – Duration time of 0 and are sometimes needed to indicate precedence relationships only in drawing networks Notations used in calculating start and finish times: ES(a) =Early Start of activity a EF(a) =Early Finish of activity a LS(a) =Late Start of activity a LF(a) =Late Finish of activity a

Network Diagram (Figure 3) Event Activity 2

Dummy Activity Situations (Figure 4a) F H G E a. Activities F and G have the same predecessor (E) and the same successor (H)

Dummy Activity Situations (Figure 4b) E A B C D b. Activity A and B have a common predecessor (E), but they also have different predecessors (C and D)

Dummy Activity Situations (Figure 4c) C D I K J c. Activities C and D have a common successor (K), but also have different successors (I and J)

Calculating ES, EF, LS, LF, and Completion Time ES (a) = 0 for the starting activity EF (a) = ES (a) + t (a)* ES (a) = max [EF (all predecessors of a)] Project completion time = max [EF(all ending activities)] * t (a) denotes the duration of activity a LF (a) = min [LS (all successors of a)] LS (a) = LF - t(a)* Forward Pass: Backward pass:

Forward and Backward Passes Information from computations on the networks are used for several managerial purposes. 1.critical path identification 2.slack times calculation 3.Determination of final completion date of project

CRTTICAL PATH The critical path is the longest time path through the project network It determines project completion Activities on the critical path are carefully monitored

Slack Times Total Slack Time = LS (a) - ES (a) = LF (a)- EF (a) total slack is the amount of time that an activity duration can be increased without delaying the project completion. activities on the critical path will have a slack of zero Free Slack Time = min [ES (all successors of a)] - EF (a) free slack is the amount of time an activity time can be increased without delaying the start of the very next activity.

Activity Start and Finish Times (Figure 5) [ES, EF] [LS, LF] [0, 3] 3 [0, 3] [3, 8] 5 [3, 8] [5, 7] 2 [6, 8] [0, 4] 4 [2, 6] [3, 5] 2 [4, 6]

Use of Project Management Concepts Scheduling is only part of a complete approach to project management Tradeoffs between sophistication and cost of methods Choice between PERT and CPM Project management software

Microsoft Project Primavera Systems Inc. Sure Trak 2.0 Scitor Corp’s Project Scheduler 7 Kidasa Software, Inc. Milestones e.t.c.