AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL Changing the Energy Paradigm? the Impact of Fukushima on the future of Nuclear Power John Saroudis Regional.

Slides:



Advertisements
Similar presentations
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Nuclear Power: Opportunities, Challenges and Solutions Black Sea Energy Conference - April 2006 Ron Cullen General Manager and Project Director Romania.
Energy. oil and natural gas  supply 62% all energy consumed worldwide  how to transition to new sources?  use until mc of further use exceeds mc of.
Dr. Kamal Kant Dwivedi Counselor (S&T) Embassy of India Washington DC,
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
GENERATION III AND III+ NUCLEAR POWER PLANT DESIGNS ACR-1000 (Advanced CANDU Reactor) Dr. Şule Ergün Hacettepe University Department of Nuclear Engineering.
IAEA International Atomic Energy Agency Overview of CANDU Reactor Technology and the CANDU 9 Simulator Matthias Krause Nuclear Power Technology Development.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
Some nuc. reactors. Nuclear reaction by Fission Nuclear fission: All commercial power reactors are based on nuclear fission. generally use uranium and.
The Harnessed Atom Lesson Six Atoms to Electricity.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Different Ways to Generate Electricity
Princeton - Department of Chemistry USC - Department of Physics Princeton - Department of Chemistry Nuclear Physics Lab – Oliver R. Gothe May 12, 2008.
Resource and Energy.
POWER PLANT.
Role of nuclear power in India’s power-mix Anil Kakodkar Department of Atomic Energy.
Clean and Sustainable Nuclear Power
Nuclear Power Station Lecture No 5. A generating station in which nuclear energy is converted into electrical energy is known as a Nuclear power station.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
Nuclear Reactors Chapter 4
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.
Should Japan Continue to Use Nuclear Power? GROUP 8 Nancy, Jefrey, Alice
© OECD/IEA 2010 Cecilia Tam International Energy Agency Martin Taylor Nuclear Energy Agency The Role of Nuclear Energy in a Sustainable Energy Future Paris,
How they work and what happened at Fukushima Daiichi Plant.
Nuclear Reactors and Nuclear Energy Conversion of mass-energy to electrical energy mass-energy  thermal  kinetic  electric Produces large amounts of.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
Types of reactors.
CANDU Fuel Options: Practical Adaptability Jerry Hopwood Vice President, Marketing & Product Development World Nuclear Association, Annual Symposium September.
Energy Resources. Non-renewable energy resources are made of: fossil fuels uranium (used in nuclear plants).
International Energy Markets Calvin Kent Ph.D. AAS Marshall University.
1 IEA Energy Scenarios for India for 2030 Lars Strupeit Malé Declaration: Emission inventory preparation / scenarios / atmospheric transport modelling.
Renewable/Non-renewable Resources
NUCLEAR ENERGY Or How The World Learned To Stop Worrying and Love the Alternative Energy Source Sophia Khan and Dom Bolton.
Steven Biegalski, Ph.D., P.E. Director, Nuclear Engineering Teaching Laboratory Associate Professor, Mechanical Engineering Dusting off the Atom: Nuclear.
BY SEAN ZDEB AND JORDAN CHANG Nuclear Energy Reborn: The Pro’s, Con’s and Rebirth of a World-Changing Fuel.
16469 Low Energy Building Design Sustainability – an overview Dr Nick Kelly ESRU.
Nuclear Power Reactors SEMINAR ON NUCLEAR POWER REACTOR.
4/2003 Rev 2 I.4.7 – slide 1 of 48 Session I.4.7 Part I Review of Fundamentals Module 4Sources of Radiation Session 7Nuclear Reactors IAEA Post Graduate.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
U.S. Primary Energy Consumption by Source and Sector, 2008 (Quadrillion Btu) 99.2 Quadrillion BTU Source: DOE/EIA.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Thermal Hydraulic System Experiment
IB SL NUCLEAR POWER. WHAT IS IT? The process of generating nuclear power starts with the mining and processing of uranium and other radioactive elements.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Capacity to do work by performing mechanical, physical, chemical, or electrical tasks or to cause a heat transfer between two objects at different temperatures.
PIME 2004 / Barcelona, Feb. 10, 2004Nuclear Energy Division 1 PIME 2004 plenary session February 10, 2004 – Barcelona Preparing the future : New challenges.
Nuclear Power. Fission Uranium-235 Plutonium-239 Neutron 10n10n 10n10n 10n10n Strontium-90 Xenon-144.
Furnace/Burner Boiler High Pressure Steam Turbine Generator Electricity Cooler/Condenser Steam Ash and Smoke Coal is burned in a large Furnace/Burner to.
DAVID VAN WAGENER NOVEMBER 26, 2008 CHE 384: TECHNOLOGY REPORT Nuclear Power: Advanced Generations and Outlook.
1. HUNTER-GATHERER SOCIETIES HAD VERY LIMITED ENERGY REQUIREMENTS. THESE WERE MET USING WOOD (A RENEWABLE RESOURCE). 2. THE INDUSTRIAL REVOLUTION CHANGED.
Different Ways to Generate Electricity
Dr. Jeremy Whitlock Canadian Nuclear Laboratories (Chalk River, Ontario) Canadian Nuclear Laboratories (Chalk River, Ontario)
Nuclear Power Reactors
Uranium Ore - must be “enriched” most abundant = 238 U fissionable = 235 U (“fuel”) Reminder: Isotopes different # of neutrons Naturally occurring radioactive.
Nuclear Power. What Is Nuclear Power? Nuclear power is the use of nuclear reactions that release nuclear energy, which generates heat. The energy produced.
2016 January1 Nuclear Options for the Future B. Rouben McMaster University EP4P03_6P03 Nuclear Power Plant Operation 2016 January-April.
Sean Goldrick Paper Reviewed: World Energy Outlook 2012, IEA Report Topic: Energy/Climate Change.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
NUCLEAR REACTORS G. HETSRONI Emeritus Danciger Professor of Engineering Technion – Haifa – Israel.
Generator Operation. Video of Generator synchronizing.
NuScale Generator A Practical Energy Alternative for the Future
IAEA International Conference on Fifty Years of Nuclear Power – The next Fifty Years Moscow - Obninsk, Russian Federation - June 28, 2004 Nuclear.
Date of download: 11/7/2017 Copyright © ASME. All rights reserved.
Pressurized Water Reactor
Session Name: Lessons Learned from Mega Projects
BY ELLA CATHERINE, JACKSON, BRANDON, AND KELSEY
Presentation transcript:

AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL Changing the Energy Paradigm? the Impact of Fukushima on the future of Nuclear Power John Saroudis Regional Vice President June 28 th, 2011 Bucharest, Romania

Outline Background CANDU Plant layout Passive features EC6 Safety Summary The impact of Fukushima on future of nuclear power The role of CANDU AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 2

Background Qinshan Construction AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 3

EC6 Reference Plant Layout AECL-OFFICIAL USE ONLY/A USAGE EXCLUSIF-EACL 4 Reactor Building Service Building Turbine Building Spent Fuel Bay Standby Diesel Generator Secondary Control Area 24 hour SQ UPS batteries in SB Severe Accident Diesel Generators (adjacent to reservoir) Emergency Diesel Generators

EC6/C6 Design Features Natural uranium fuel Neutron economy Modular, horizontal fuel channel core Separate low-temperature and pressure moderator On-power refuelling Calandria vault filled with light water which surrounds the core Two independent passive safety shutdown systems Reactor building access for on-power maintenance AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 5 Fuel bundle Calandria tube Fuel channel Calandria (reactor core) Fuelling machine CANDU 6 Reactor Face 37-element bundle (20kg / 50cm)

EC6 Schematic AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 6

Passive Features Passive sources of decay heat removal following reactor shutdown: 190 tonnes heavy water in heat transport system (HTS) 210 tonnes of high pressure emergency core cooling (HPECC) 240 tonnes of heavy water in calandria vessel 520 tonnes of light water in calandria vault 2000 tonnes of light water in reserve water tank (RWT) 77 AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL

8 ~240 tonnes D 2 O in Calandria Vessel (> 5 hours to heat up and boil off) ~190 tonnes D 2 O in Heat Transport System ~520 tonnes H 2 O in Calandria Vault (10 to 20 hours to heat up and boil off ) Reactor Core and water inventories as passive features preventing severe accidents Inherent passive sources of decay heat removal following reactor shutdown (part of original CANDU design)

EC6 Thermosyphoning Schematic AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 9 Reserve Water Tank MSSVs Heat generated by fission product decay Opens automatically RWT under gravity flow into the steam generators can continue to remove decay heat from the fuel in the reactor for three days by thermosyphoning on the primary side Connection to EHRS Automatic opening by UPS power Primary side Secondary side Feedwater supply Heat transfer from primary side to secondary side

AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 10 Loss of Power - Heat Sinks for EC6 All electrical power available Loss of Grid (Loss of Class IV) Loss of Grid + Stand By Class III Diesels Loss of AC Generation (Loss of Class IV & Class III & EPS DGs) Station Black Out (Loss of Class IV/III/II/I & EPS DGs & SARHRS DG) Available Power Sources Class IV from Grid Class III Standby Diesels Class I UPS EPS Diesels 24 hour SQ UPS SARHRS Diesel Class III Standby Diesels Class I UPS EPS Diesels 24 hour SQ UPS SARHRS Diesel Class I UPS EPS Diesels 24 hour SQ UPS SARHRS Diesel 24 hour SQ UPS SARHRS Diesel 24 hour SQ UPS Available Heat Sinks Main Feedwater Auxiliary Feedwater Shutdown Cooling Emergency Heat Removal System Moderator System Reserve Water System Shield Cooling Emergency Core Cooling Local air coolers Spent Fuel Bay Cooling Severe Accident Recovery & Heat Removal System (SARHRS) Containment Cooling Spray Auxiliary Feedwater Emergency Heat Removal System Reserve Water System Shutdown Cooling Moderator System Shield Cooling Emergency Core Cooling SARHRS Containment Cooling Spray Local air coolers Spent Fuel Bay Cooling Emergency Heat Removal System Reserve Water System Emergency Core Cooling (ECC) SARHRS Containment Cooling Spray Local air coolers NSQ Fire water (diesel driven) Reserve Water System Severe Accident Recovery & Heat Removal System (SARHRS) Containment Cooling Spray NSQ Fire water (diesel driven) Reserve Water System High Pressure ECC NSQ Fire water (diesel driven) HTS boil off Moderator boil off Calandria Vault boil off Amount of heat to be removed 2,182 MWth (reactor at full power) 1.8MWth (spent fuel bay) <1% of Full Power after 24 hours (reactor) 1.8MWth (spent fuel bay) <1% of Full Power after 24 hours 1.8MWth (spent fuel bay boil off) <1% of Full Power after 24 hours 1.8MWth (spent fuel bay boil off) <1% of Full Power after 24 hours 1.8MWth (spent fuel bay) boil off) TimingIndefinitely 13 days (spent fuel bay) Indefinitely (reactor) 13 days (spent fuel bay) > 3days (reactor) 13 days (spent fuel bay)

EC6 Safety Summary Both active and passive systems to prevent severe accidents Severe accident progression is relatively slow Robust design against severe accidents 11 AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL

The Impact of Fukushima on the Future of Nuclear Power World Population Trends World Energy Consumption Are we more efficient? Do we have a choice? Nuclear needs to play a role. AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 12

Anticipated World Population 2011 October 7 Billion Billion Billion AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 13

Population Growth in Major Regions AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 14 Source: IEA World Energy Outlook 2010

Global Primary Energy Intensity AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 15 Source: IEA World Energy Outlook 2010

Changes in residential electricity demand: United States example AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 16

World Overall Primary Energy Demand AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 17 Source: IEA World Energy Outlook 2010

Where electricity consumption growth will come from AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 18 Source: IEA World Energy Outlook 2010

Electrification of developing regions AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 19 Source: IEA World Energy Outlook 2010

Meeting Future Energy Needs Energy needs will rise with electricity leading the way; With current policies in many countries renewables will play a key role but up to a point; cost considerations will soon take over; Abundance of relatively inexpensive coal and gas will make them key players in electricity generation (growing evidence of climate change will become a factor longer term that will curtail their use); Nuclear will continue to grow; some slowdown expected in certain countries; BUT economics will be a key factor: nuclear will be successful in markets where it is competitive (e.g. China) AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 20

World Electricity Generation to 2035 AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 21 Source: IEA World Energy Outlook 2010

U.S. Generating Capacity to 2035 AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 22

Where we were….. Where we are going….. AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 23

Nuclear Power – Part of our urban landscape 24 Public acceptance, safety, and close to home. AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL

A modest design step, a large performance step CANDU 6: Heavy-water cooled 740 MWe class ACR-1000: Light-water cooled 1200 MWe class 25 AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL

Future options Long Term:  Develop Gen IV reactors Short Term  New Uranium supplies?  Deploy Uranium saving technologies  Recovered Uranium  Recovered Plutonium  Thorium  Depleted Uranium  Mixed Oxides  Actinide Waste CANDU CAN UTILIZE THEM ALL 26 AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL

CANDU advanced fuel cycles 27 Current focus areas AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL

Summary Fukushima is an extraordinary event that will leave its impact on the nuclear industry in the form of lessons learned and new safety improvements; With a few exceptions the use of nuclear power to general electricity will continue (but with some delays); The key factor that will affect nuclear’s future will be economics (China and India will be leaders); Over the next few years subsidies to renewables will be significantly reduced and the playing field will be leveled; Nuclear will continue to be a key player. AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL 28

OFFICIAL USE ONLY 29 AECL Branch Office Cernavoda, 6, Medgidiei St Cernavoda – Romania Tel: Fax: AECL Bucharest Office, Polona Street, Floor 2, Sector Bucharest – Romania Tel: Fax: