The Floor Cut away the flat side channel & replace with true 3D channel: (Evergreen.100”) Cut out the original floor from nearly bolster to bolster & replace.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
Exterior Window and Door Frames
Bardia Baheri Rotary High Voltage Motor Physics project.
Manitoba School Bus Pre-Trip Inspection
REMOVABLE BUILDING A Λ SIGNAL Presented by BOB VAN CLEEF of the North River Railway.
Design for Elderly and Disabled Environments:
Cabinet and Countertop Installation
Railcar Anatomy B Components Randy J. Quaife
Judging The Model “A” Area 2 Electrical System
SERVICING EVAPORATIVE
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Flexible Manufacturing Common Sheet Metal Seams Copyright © Texas Education Agency, All rights reserved.
Competency: Draw Wall Sections
Tom’s Tips for Silencing Your Model “A” 2014 Missouri Valley Region Membership Meet.
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
BalloonSat Construction Ideas and Suggestions. What is a BalloonSat? Functional Model of a Satellite Carried by Balloon to at Least 60,000 Feet Operates.
Living with the lab Prototyping with Sheet Metal.
Modifications to the Lionel 0-6-0t Switcher
DAILY PRE-TRIP.
Vent window installed. Install door frame side latch.
This is the 8’ metal bending brake we used. Since I forgot to take pictures, the pictures I use in this presentation to describe what I’m doing are from.
Voyager Spaceprobe1:48 scale Read all the instructions and review the parts sheets before starting. Note the red stars for aligning the HGA dish, support.
Pneumatic Arm Assembly Instructions
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Chapter 7 Metals.
Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
Window Details (Wood) Window Assembly u Finished window assembly depends on: –architectural design of structure –region of country/climate –material.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Maintenance Management Seminar
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
Equipment and Tool Institute June 18, Challenger Body Structure Diane Coopmans, Body Structures Engineering.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Product Design AQA GCSE
COOKER (2 Litres) 1.Brief Research Cost of Cooker :- Rs.1250 – 2500/- Types of Cooker :- 1. Ordinary pressure cooker 2. Electric pressure cooker 3. Solar.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Scratch Build a Water Tower
Corvette Assembly Process Chassis And Final Assembly NCRS National Convention July 20, 2011 John Hinckley.
Notes on Converting 3 Rail Locomotives to 2 Rail Operation By Joe Foehrkolb Baldwin Forge & Machine Baldwin, Maryland.
Auto shop safety Safety around the shop. Safety Which characteristic is essential for the professional auto technician? Responsible attitude Knowledge.
Bathroom Notes Chapter 24. Types of bathrooms: Master Bath –A full bath –Part of the master bedroom area.
Compressor Replacement – ODU
Pouch Stacker & Boxer DR Mark Smith October 8,
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
BalloonSat Construction part 2 Ideas and Suggestions L. Paul Verhage 3 April 2015.
2 meter long PVC tube Fitted with a lid in each end – see photos on next pages Brass top, to fasten a rope, and to help fasten the hinge for the top lid.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
WELCOME TO GOLD COAST REGION’S CONCOURS UNIVERSITY & CONCOURS PREPARATION SCHOOL 2016.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Chapter 12 Replacing Hoods, Bumpers, Fenders, Grilles, and Lids.
Building Construction
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
PostBase Automatic Feeder Component Removal Service Training
Flexible Manufacturing
Woodworking Hardware Ag Mech I Standard 6:4-5.
Sheet Weathering Lead sheet Step flashings Feature tops
Hydraulic Arm Assembly Instructions
Building a Nightstand Woods 1 Final Project Step #1
Tube Heater, 3,000 Watt 240V Top + Back Front 1”Hole For Mixer Shaft
Christmas Card Box Marcus P. Dula.
Removal of salon doors on 1968 Roamer Sedan.
Clay Canteen Project.
Presentation transcript:

The Floor Cut away the flat side channel & replace with true 3D channel: (Evergreen.100”) Cut out the original floor from nearly bolster to bolster & replace with a new floor. New floor made from Evergreen sheet flush with the bottom of the old floor depth. Cut and fit the replacement floor with great care! New Center sill channel made from Evergreen 5/16” channel remove wedges from the ends of the web to get the tapered look, but don’t cut away the flanges. New floor and details added APWS water tank S/E Valve box (2)Battery boxesUC Brake Set Vapor traps (2) Battery charging receptacles (2)

Diner details Aisle side, kitchen end Diaphragm Air, steam & signal lines Cut levers Body mounted KD’s Marker light brackets Grab irons Kitchen door Stirrup steps Window sills Gutters, scale 1” x 2” strip preformed & glued on edge Ice hatch Square Kitchen vents (2) Round hooded & wind vanned Kitchen vents (2) SE A/C hatches (2) Enlarged End Sills

Flat Kit Side Scrabble The diner. Build & detail the roof kitchen end, kitchen side. ‘Mushroom” vent 1/16”rod + tube Roof rivet strips 0.005” Gutters, scale 1” x 2” strip preformed & glued on edge A/C ducts: NERS parts Grab irons (various locations) “wind vane” vent: 1/8” tube, formed aluminum cap, 0.010” vane Box vent: 0.010” base flange, 0.030” body, angle & sheet top “Ice hatch” 0.020” sides, 0.010” lid, 0.005” hinge leaf & rod hinge, brass wire handle, Lid stop brace: brass shim The roof is a model within a model, especially so for diners with A/C. Pantry area ice hatch: 0.010” base flange, 0.030” body, 0.010” lid, 0.005” hinge leaf & rod hinge, brass wire handle, Vent frames (6) Service platform: Shim brass support legs, 2” x 3” strip for decking

Roof Top S/E A/C hatch detailing Long grab iron with ladder notches (various locations) Gutters, scale 1” x 2” strip preformed & glued on edge The café lounge shown, same components on the diner, but split locations ‘Mushroom” vent 1/16”I.D. rod + tube Hatch base: 0.030” sheet, creased & bent for “peak” Hatch cover: 0.010” sheet, creased & bent for “peak”, W/ rivet detail Hatch cover hold down dogs: 0.010” X 0.015” flat brass bar Roof vent, round tube trimmed & capped

Truck Modifications Moveable support bars Pulley Generator Belt tensioner Belt Generator support bar (truck mounted part)