Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
1 Reliability Coordination (IRO Standards) 2011 System Operator Conferences #3 and #4 September & 20-22, 2011 Nashville/Franklin TN Rocky Williamson.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
August 14, 2003 Blackout Final Report
IRRIIS SimCIP Demo (version 0.8- May 2009) IRRIIS European Project – Antonio Di Pietro – ENEA.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Stewart Reid – SSEPD Graham Ault – University of Strathclyde John Reyner – Airwave solutions NINES Project Learning to date.
NERC Lessons Learned Summary
SGOC-UCI Smart Grid Focused Use Cases for Transmission and Distribution Operations Nokhum Markushevich Smart Grid Operations Consulting (UCI associated)
Reliability Standards Update
Supervisory Systems.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Smart Grid Technologies Damon Dougherty – Industry Manager.
Distributed Real-Time Systems for the Intelligent Power Grid Prof. Vincenzo Liberatore.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
PHAAUG – Peak Reliability
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Cognitive Task Analysis and its Application to Restoring System Security by Robin Podmore, IncSys Frank Greitzer, PNNL.
Synchrophasor: Implementation,Testing & Operational Experience
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
© 2006 Avaya Inc. All rights reserved. Avaya Services Michael Dundon Business Development Manager.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January 2004 Jeff Dagle, Pacific Northwest National Laboratory.
Peak RCCo Performance Metrics Draft –November 2013.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.
Status Report for Critical Infrastructure Protection Advisory Group
What’s Next in Transitioning to a Modern Grid Steve Bossart, Senior Energy Analyst IEEE EnergyTech 2013 May 23, 2013 Cleveland, Ohio.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Managing Reliability and the Markets with PI
Page 1 TAC Program and Projects Update March 6, 2003.
REAL TIME BALANCING OF SUPPLY AND DEMAND IN SMART GRID BY USING STORAGE, CONTROLLABLE LOADS AND SMART GENERATIONS Abdulfetah Shobole, Dr. Arif Karakaş.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Congestion FTR’s ISO Charges Congestion FTR’s ISO Charges Performance Monitoring is Essential for Harmonizing Reliability and Markets Distributed Generation.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Manufacturing Operations Center 10 - Differentiators - The Pharmavite Experience APAC Training, Feb-Mar, 2010.
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Sensing and Measurements Tom King Oak Ridge National Laboratory April 2016.
PS ERC EC Meeting Systems Stem New Research Initiatives.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Agenda TSOG 8th November
Brett Wangen Director of Engineering, Peak Reliability
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
ISO New England System R&D Needs
Module 4 Smart Grid Implementation Issues
Use of Lightning Data for Electricity Transmission Operations
Presentation transcript:

Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004

Reliability Software2 Blackout report findings Inadequate situational awareness by the local grid operators and Reliability Coordinators prevented effective action

Reliability Software3 Objectives What are the minimum real-time application & tool requirements for grid reliability ? What are the best available applications & tools for grid reliability ?

Reliability Software4 Functional Areas Network analysis Monitoring and visualization Real-time enablers Operations planning Transactions scheduling History & forecasting

Reliability Software5 Caveat The minimum requirements and performance indicies quoted are considered to be commercially achievable and are not intended to be regulatory requirements. Their purpose is to initiate industry discussion on what these minimum reliability capabilities ought to be.

Reliability Software6 Network Analysis Minimum Network topology processor (Detailed network & adequate external representation) State estimator (< 2 min., mismatch < 10 MVA) Real time contingency analysis (< 5 min. on 100 kV and above plus external critical facilities) Best practice Critical facility loading assessment (use of Line Outage Dist Factors) Dynamic security assessment (transient & voltage stability limits) RT thermal capability assessment (based on prevailing pre-load and ambient or dynamic field measurements) RT short-circuit assessment (based on prevailing network and generation)

Reliability Software7 Monitoring & Visualization Minimum Wide area visualization (critical facilities external to the footprint) Dynamic reactive reserve/Minimum voltage (required & actual) Remedial Action Schemes (status, trigger points & proximity) Automatic safety nets (under frequency load shedding, under voltage load shedding) Status of EMS facilities (servers, back-up systems, communications, functionality) Best Practice Dynamic Map Board driven by EMS Capability for remote access and navigation (network conditions and Contingency Analysis results) Electronic documentation (critical operating information linked to facilities on network topology)

Reliability Software8 Real-Time Enablers Minimum Intelligent alarm processing (filtering, prioritization, grouping) Block load shedding (<10 min. capability) ACE/AGC Remote back-up EMS, voice & data communications Best Practice Generation of options to return system to secure operating state

Reliability Software9 Operations Planning Minimum Outage scheduling (assess impact of outages using historical data & ac Load Flow) “Study Mode” capability (study “what-if” scenarios using a real-time snapshot of the system) Generation reserve sharing (allocation of reserves among units) Best Practice Rehearsal of next day’s operation (simulate all outages & test using contingency analysis in “study mode”)

Reliability Software10 Transactions Scheduling Minimum Interchange distribution calculator (IDC) System data exchange (SDX) updated (<15 min of outage) E-tag approval/scheduling OASIS Best Practice Automatic update of IDC Identification of full range of mitigation options for TLR

Reliability Software11 History & Forecasting Minimum Weather data (forecast high risk conditions) Load forecasts (short term & next day) Information storage & retrieval (IS&R) (reconstruction of events, proactive inspection & maintenance of critical assets) Best Practice IS&R linked to Asset Management System & Training Simulator (automatic generation of directives on equipment testing and maintenance. Scenarios for training)

Reliability Software12 Issues Network & measured data maintenance State estimator maintenance IT – Operations interactions & quality control Data sharing outside of footprint Human factors engineering Training Simulator