1. 2 3 4 5 CLIENT SHIPBUILDER CHARTER HIRE + O&M 6.

Slides:



Advertisements
Similar presentations
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Advertisements

Sustainable Construction
TYPES OF MECHANICAL SYSTEMS
Adam Larsson, Project Manager, DNV 26 May 2011 Oshima ECO-ship 2020 The open hatch bulk carrier of the future.
“Changing Industry Demands Redesign the OSV’s” 1 This paper was first presented at the “ 4 th International Conference on Technology and Operation of Offshore.
Bachelor Degree in Maritime Operations (BMO)
PANH Helicopters. Challenges of Russian-Made Helicopters Operation in Adverse Climatic Conditions.
CLEAN and CLEAN DESIGN Environmental Class Eivind Haugen, Det Norske Veritas Norske Sivilingeniørers Forening Økonomisk og Miljøvennlig drift av skip.
Managing the Environmental Challenge 1 Gateway to Asia Conference November 2014.
Engineer Presentation
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Green Ship Design Design for Environmentally Friend Ship in Shipbuilding ・ Less Hazardous Materials ・ Less CO 2 Demand for Ship Operation ・ Less Engine.
WAVESPEC Limited A Braemar Seascope Plc. Group Company October 2005 Factors involved in selecting a propulsion system for your LNG shipping project Presentation.
Chapter I. Introduction. Naval Architecture: the science and engineering of designing ships and other kinds of waterborne crafts. Kinds of ships Sub systems.
Presented By Robin Tayal Impact of Spot Trading on Project Finance.
Important considerations & contributions of flourishing shipbuilding industries in Bangladesh Khairul Hassan Doctoral student Maritime Engineering, Kyushu.
Unit 4: Primary Resources Energy from the Oceans.
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
Solutions for Flaring & Venting CNG Marine Transportation
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Fuel/Lube Oil Systems - AND – Propulsion Train & Shaft Line Components
LNG Technology.
Anchor Handling Tug Supply Vessel
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Environmental Landscape A burden or opportunity? Tony Field South East Europe Marine Business Manager.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Developments in Green Ships Design/Technologies
W w w. b a l t i c m a s t e r. o r g WORK PACKAGE 2- FINAL RESULTS WP2 Seminar / Baltic Master II Partner Search The 19th of Dec., 2007 Prepared by Jakub.
Environment and Reduction of Emissions The Application in Ships
Transport support in foreign economic activity
Shipping Agenda Part 1. Introduction, Nomenclature, Major shipping companies Part 2. Charter - Voyage, time and others Part 3. Deck maintenance Part. Engine.
Lecture 1 Water Distribution Systems
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
Shanghai International Maritime Forum 2007 Oil Transportation and Pollution Prevention Tim Wilkins 国际油轮船东协会 Regional Manager Asia-Pacific Environmental.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
Different Types of IC Engine Rated by their maximum horsepower Three Types –Reciprocating –Rotary –Sustained Combustion.
PRODUCTION OPERATIONS AND MAINTENANCE
Lesson Five Bulkheads and Pillars.
Whitelaw & Pearson The Costs of Increasing a Basic Shrimp Vessel from 65 to 85 FEET A Case Study.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of the environment  Prudent use of natural.
Chapter 11: Strategic Leadership Chapter 15 The transport system.
Solution To Wasted Gas: Flaring And Associated Gas In Nigeria
Dr. Haakon-Elizabeth Lindstad and Professor Gunnar. S. Eskeland
Progress Report of the Russian Federation Project 2013 “Development of Safety Systems in Implementation of Economic and Infrastructural Projects in the.
PORT OPERATIONS AND THE ENVIRONMENT. Port construction and operation are compulsory development activities with potentially massive economic, social and.
21-22 October Bangkok, Thailand
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
(Formally Kormara Midi)
LIME INSTRUMENTS March 2013 NOMADS April 9 th, 2013 Rob Stewart Lime Instruments President.
IMPROVED SEABED ANCHORING TECHNOLOGY Innovation Opportunity Identified at PROTTEC Retreat 26/28 October 2010 Jonathan Williams, Marine South East.
Gas Turbine Power Plant
MARPOL.
Chapter 6 Question-and-Answer.
Ship to Turbine (STT) TM
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
THE OIL SEA HARVESTER SYSTEM :
Across the entire value chain
Environmental Compliance
ABB in Marine Industry A short introduction
Firefighting equipment
AIR Quality Control Concepts
Presentation transcript:

1

2

3

4

5

CLIENT SHIPBUILDER CHARTER HIRE + O&M 6

7

Blades project vertically below the ship’s hull and rotate on a rotor casing about a vertical axis, performing an oscillatory motion around their own axis that is superimposed on this uniform motion. The oscillating movement of blade determines the magnitude of thrust through varying the amplitude (pitch) while the fast correlation determines the thrust direction between 0 and 360 degrees. Hence an identical thrust can be generated in any direction. 8

Kinematics of VSP Cycloidal path of a Blade 9

Stepless Control Equal thrust & propulsion efficiency in all directions Main engines can be operated with constant or variable speed Service life of propeller is as long as vessel life. Rapid and precise thrust variation Additional roll stabilization of the vessel. 10

11

Shallow Water or Conventional Depth < 400 Meters Deep Water > 400 Meters and < 1500 Meters Ultra deep Water > 1500 Meters 12

13

Complex and harsh environment which requires long term investment and commitment. Technical and logistical challenges Continuous & innovative technologies required to withstand the hostile and harsh conditions Unique production challenges which requires more sophisticated breakthrough technologies in order to achieve economically sustainable production. Significant increase in drilling capacity required for deep water production to have an impact on energy supply 14

Vessels should be equipped with better dynamic positioning system e.g. DP3 Safe anchor handling system requiring minimum number of crew members in the aft deck. Requirement of higher bollard pull OSV’s Using Remote operated vehicle 15

16

Supply Needs Sub-Sea Installation Anchor handling Survey Construction Work Towing Well Stimulation Stand By Rescue Diving Works 17

18

19

North of Arctic area has an estimated 90 billions barrels of undiscovered oil. Arctic accounts for  13% of undiscovered oil (13.5 billions tones)  30% of undiscovered natural gas  20% of undiscovered natural gas liquids 20

21

22

Harsh Climate including strong winds and cold temperature Sensitive environment & slow recover from damages Unknown actual impacts. Potential damage to fish, birds and marine mammals through industrial activities such as noise from seismic survey, shipping, drilling, increased pollution and oil spill risk. 23

Services required for OSV’s operation in Arctic are as follows:  Fire Fighting  Oil-Combating / Oil Spill  Escort Ice breaking Prevention  Ice Management  Stand by / EER (Emergency, Evacuate, Rescue)  Towing  Anchor handling  Construction Assistance / Cargo Supply 24

Future fire fighter vessels shall be designed with active protection, giving it the capability to withstand higher heat radiation loads from external fires. Continuous fighting of large fires from a safe distance Efficient water pumping capacity and more comprehensive firefighting equipment. Availability and accessibility of sufficient quantity of fuel oil for continuous fire fighting operation with water monitors for a period of not less than 96 hours. Foam-forming liquid for continuous foam production for longer durations Crew operating the fire fighting systems should be well equipped and trained. Efficient Maneuverability of the vessel having side thrusters and propulsion machinery of sufficient and adequate power requirements. 25

With proper ice management, the drilling season can be extended in some areas from a 2-3 months window to all year round, resulting in the cost per well being substantially decreased. Ice management is about ice monitoring, meteorology. Aircraft or helicopter surveillance is used to identify critical sea ice. The sea ice is equipped with GPS transponders reporting speed and course. The demand for vessels performing ice management services varies from 1-4 vessels for a single drilling unit depending on ice severity (thickness and movement) and the drilling unit’s capacity to withstand the forces from the ice. 26

In case of an emergency evacuation, there is a need for supply vessels to be able to accommodate personnel from the affected facilities. The demand for standby vessels depends on distance to shore and size of the site etc. and range from 2-5 vessels per site. According to Canadian law, a standby vessel is required to be within 20 minutes from the offshore installation. 27

One of the biggest threats to the environment is oil spill in ice infested waters. In addition, there is limited knowledge regarding the impact of an oil spill in the Arctic region. There are different techniques on how to contain and recover oil spills and in some cases the low temperature may have a positive effect, since the oil thickens in low temperatures as well as the ice can act as a natural barrier to prevent the oil from spreading. Together with standby and EER services, oil spill recovery is one of the most important services in order to guarantee social and environmental safety. Though important, oil spill recovery is a subordinate service and is applied in case of an oil spill emergency but will most probably be a feature which all Arctic supply vessels will have. 28

The cargo demand differs slightly depending on the facility, where mud is needed to control the pressure in the well when drilling and methanol is needed for production. To be able to supply both types of material would therefore be an advantage, which can be satisfied if a tank onboard a supply vessel is able to carry both materials. If a supply base is not established, a better solution, is to have bigger (up to five times) supply ships, which are able to carry the necessary supplies for the entire period, delivering directly from international ports. 29

Regarding construction assistance services, it is difficult to specify the requirements since they are highly dependent on the type of facility being constructed. Different requirements constitute in the vessel being equipped with cranes, Remote Operated Vehicles (ROV’s) and a helicopter deck if the drilling unit does not have one. Another aspect regarding construction assistance is that it is not needed when exploring a site, but rather when a significant discovery is found and the field is to be developed. A large vessel with icebreaking capabilities constitutes a good platform for extending it to a construction assistance vessel and vice versa. 30

Scantling of foundations and supports of towing pins shall be based on 2 times the specified maximum static working load. Designing of following equipment's like anchor handling winch, shark jaw, towing pins & stern rollers with appropriate alloys compositions or composite materials of greater strength. 31

Used basically for supply of liquid mud, fuel oil and base oil etc. for offshore structures like well head platforms (manned / unmanned) FPSO’s, drilling ships etc. Cargo pumps shall be provided with remote shutdown devices capable of being activated from a dedicated cargo control location which is manned at the time of cargo transfer. Segregation between the cargo piping system where the cross contamination of the supply items causes safety hazards by using spectacle flanges etc. Vessels intended for transportation of liquid with flashpoint below 60 DegC shall be designed with appropriate safety measures. In the case of supply of cement and dry mud systems, the engine room should be as far as practicable or should be separated by steel deck and bulk heads. 32

33

34

35

Energy Efficient Design Index (EEDI) Building more energy efficient vessels, which requires less fuel consumption. Energy efficient operational Index (EEOI) Emission Control Ship Energy management Plan (SEMP) Optimization of Cargo handling, power requirements & Crew management etc. LNG Propelled OSV’s Using of Wind Energy in OSV 36

Fuel oil tanks protected on the sides to avoid contact in case of accident. Fuel used by engines is MGO, having very low sulphur content, hence minimal pollution. The refrigerant used by AC plants must have at least ODP. Vessel with incinerator plant for burning garbage at sea. Vessel with sewage treatment plant for treating prior to discharge overboard. Tank washing system for the mud/brine tanks. Tank washing/residue sent to slop tank and not directly discharged overboard. The vessel having green passport upon delivery. 37

38

Propulsion efficiency devices. Waste Heat Recovery System Cold Ironing. Energy Savings Systems like for main sea cooling water pump : a computerized system which controls the speed of the pump by controlling the three way valve as per the sea water temperature. 39

Introducing new cargo pumping arrangement by submersible pump for mud/brine/ORO operated by hydraulic power pack. This provides for flexible and safe power transmission for cargo pumping system for an OSV carrying cargoes with a large variety of viscosities and specific gravity. 40

Some of the salient features of using LNG in place of conventional MGO are  Up to 90% NOx reduction and 20% CO2 reduction  Operational flexibility  Lower Fuel Cost  Lower Maintenance Cost 41

42

Diversified Product Mix India’s First World Class Ship Building & Repairs Company dedicated to Offshore & Defence 43

Integrated shipbuilding & Offshore fabrication facility at Gujarat, India. Strategically located close to offshore oil fields on western cost of India. 44

Satellite Overview 45

46

47

48

49

50

51

52

53