NAESB OASIS Subcommittee Long Term Competition Mike Norris, Rebecca Berdahl May 13, 2014 5/13/141.

Slides:



Advertisements
Similar presentations
W. WeathersModeled after Redirect Examples Examples: Reservations that are dotted show Capacity Available to Resell or Transfer. MWs in Gray are.
Advertisements

11 OASIS Subcommittee - Notification Task Force UPDATE May
DRAFT Recommendation Preemption & Competition CHALLENGER COUNTEROFFER June 25, 2013 NAESB OS.
1 Defender Mitigation Proposed Name Change: Defender Reservation True-up Jan 15, 2012 NAESB OASIS Subcommittee Progress Report.
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Preemption and Competition Redirect Issues NAESB OS Meeting June 6, 2012 BPA Presenting.
Timing and Flowchart Assignment
W. Weathers1A Conference Call 8/18/05 Examples: In all cases a Parent Reservation to be Redirected must be Firm Point-to-Point. Unless noted otherwise,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Timing Considerations for Short-term Preemption and Competition Automation NAESB OS Presentation.
NAESB OASIS 1A Subcommittee Wendy Weathers, Chair ESS Meeting May 2005 Resale Recommendation.
Open Season MT to Idaho Calendar of Events Posted on NWE OASIS September 30, 2004 (Slide 8 updated 2/28/05)
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Tiers 1 & 3 Assignment Flat Profile Recommendation.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
DRAFT E-Tag Notification Presentation NAESB OS Mar 26-28, 2013 Seattle, WA.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Treatment of Firm Redirects Recent FERC Order. Entergy Order Docket Nos. ER OA ER Issued May 16, 2013
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
2011 Enhanced Early Retirement Program U.S. & Canada
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Short-Term Competitions and Preemption.  Overview  Standards being covered are:  Motion 2 - Fixed Capacity Over Term of Request. ▪ Tier 1 Service –
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS July 22-24, 2014 BPA Presenting.
Resale Business Practice Standards 3 Options remain.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Motions – Amend Due Dates for the NAESB OS 2013 Annual Plan (AP) November 21, 2012.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Resale Business Practice Standards 3 Options remain.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
OASIS SUBCOMMITTEE STATUS EC Meeting 4/29/14. Preemption and Competition Annual Plan Items Affected  2013 AP Item 2(a) Develop version 2 business practice.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS Presentation August 20, 2014 BPA Presenting.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Capacity Reassignments, Aggregation & Redirects of Reassignments NAESB OS – May 13th, 2014 BPA.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Consolidation (API 5.d R09015) Business Practice Standards Draft WEQ OS Marie Pompel – July 2015.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
NAESB WEQ EC Meeting 10/20/2015.   Workload  Long-Term Competition for Rollover Rights OASIS Subcommittee.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Conditional Resales NAESB Assignment Update April 16th, 2014 Bob Zerfing, Rebecca Berdahl.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Motion 47 Concerns Bob Zerfing, Rebecca Berdahl June 17 th, 2014.
UNCONDITIONAL AND LEAD TIMES PREEMPTION AND COMPETITION TIMING.
NT Assignment Update: 9/17/13. NT Assignment Update Resources: CompanyResources BPARebecca Berdahl, Milos Bosanac, Ann Shintani, Bob Zerfing ClarkBrenna.
Explanation of Revised Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
NAESB NITS, and Long-term Competition
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Preemption-ROFR Notification
NT Assignment Update: 9/17/13.
WEQ OASIS Subcommittee
BPA Formal Comments Overview to NAESB OS
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Voxeo Information and Process
Duke Energy Carolinas Quarterly Stakeholder Meeting
Duke Energy Carolinas Quarterly Stakeholder Meeting
Recommended Appendix B Redirect Standards Examples
Service Across Multiple Transmission Systems
Preemption & Competition Standards BPA – Southern Compromise Proposal October 24, 2017 PURPOSE: Review and discuss the inequity with the Short-Term Firm.
Duke Energy Carolinas Quarterly Stakeholder Meeting
Service Across Multiple Transmission Systems
BPA Formal Comments Recap of ‘Best Offer’ Proposal
Short-term Competition and Preemption (STCP)
Local clinical excellence awards
2019 Annual Plan Items 3b and 3f (formerly 2018 API 3c and 3h)
Social Practice of the language: Describe and share
ON EUROPEAN TRADEMARKS AND DESIGNS
OASIS Notification Recommendation.
Presentation transcript:

NAESB OASIS Subcommittee Long Term Competition Mike Norris, Rebecca Berdahl May 13, /13/141

Recap from April OS Meeting Two LT Competition Options Presented  ‘Strawman’  BPA’s current implementation Fundamental difference between the two options is what triggers the competition  ‘Strawman’ – a new request is submitted  BPA’s – a Renewal request is submitted 5/13/142

Recap from April OS Meeting (cont’d) Depending on which option is chosen, additional differences result such as: 1.Competition Time Horizon  ‘Strawman’ – competition time horizon could be years  BPA’s – competition time horizon never more than several weeks 2.Competition Inventory Management  ‘Strawman’ – new type of persistent inventory created that must be actively managed (e.g., ‘Unexercised Renewal Rights) over the long term  BPA’s approach – ‘Unexercised Renewal Rights’ inventory is attached to a specific Renewal TSR and is limited to the amount in that Renewal TSR 5/13/143

Overview – Questions to be Answered Illustration - State Diagram (‘Strawman’ Rule Set) – Three Confirmed Reservations – Two Contingent Reservations Describe areas of LT C complexities – TSR Assessment – Relationship Management and Types – Competition Rule Set – Inventory Management 5/13/144

“Strawman” State Diagram 5/13/145

“Strawman” State Diagram Assumptions All capacity buckets are sold out except for Unexercised Renewal Rights Bucket (reality the offer would be filled 0-100% from that bucket) Contingent offers were made and accepted resulting in CONFIRMED reservations 5/13/146

Relationships between Reservations with Renewal Right and Contingent Reservations There are many possible relationships that could be established between reservations with unexercised renewal rights and contingent reservations: 1.One to One: a specific contingent reservation is linked to a specific reservation 2.One to Many 3.Many to One 4.Many to Many For each of the relationships listed above there are a set list of questions/issues that must be worked through – TSR Assessment (Pending Requests) – Relationship Management (CONFIRMED Contingent Reservations) – Competition Mechanics – Inventory Management (Unexercised Renewal Rights Bucket) 5/13/147

One to One: TSR Assessment New bucket of inventory is now available to satisfy requests (Unexercised Renewal Rights) Current assessment process would remain the same there would simply be a new offer type available (Contingent Service Agreement) Probable outcomes – Many requests would be satisfied via the Contingent Service Agreement offer type – Queue would shrink 5/13/148

One to One: Relationship Management For each Contingent Reservation, the TP must track the Reservations with unexercised renewal rights it is contingent on. – Given that it could be years before a Contingent Reservation may have an opportunity to challenge, the tracking solution will need to be robust. 5/13/149

One to One: Competition Mechanics How many Challengers (e.g., Contingent Reservations) must a Defender be required to ‘defend’ against? – One – Many How many eligible challengers get to challenge the defender? – One – Many 5/13/1410

One to One: Inventory Management Where does the released capacity not used by Contingent Reservation go? – Back to market? – Back to Unexercised Renewal Rights Capacity Bucket? How to reconcile the Inventory Bucket (mW) with the Tariff language (Duration)? 5/13/1411

Competition Mechanics: Many to One Tariff language uses duration as the single criteria used in LT C to determine who gets the capacity. 1.If there are many Challengers (e.g., Contingent Reservations) what criteria should be used for competition a.Individually by queue time (Many Challengers to one Defender, TP runs several iterations) b.Batch the Challengers to determine a ‘winner’. (One Challenger to one Defender, TP runs one competition) 5/13/1412

Other Complexities Deferrals Redirects Resales Timing, Inventory Management, etc… associated with the above 5/13/1413

Proposal Strong preference for creating a new project to do Long Term Competition NAESB standards development work A case can be made for creating a new project: – Complexities Examples noted in previous slides LT C project implementation timeline is longer than what is available in the current C&P project – Additional complexities associated with the current ‘Strawman’ BPA’s Point/Counterpoint 5/13/1414

Proposal (cont’d) Proposed Motion Language Exclude the development of Long Term Competition standards and implementation from the current NAESB OS Competition and Preemption project. Create a new project, ‘Long Term Competition’, to complete this body of work. 5/13/1415