1 FIMS Conference, 2008 Ed Weideman. 2 Location of NREL Sites in the Denver Metro Area.

Slides:



Advertisements
Similar presentations
STRATEGIES FOR ACQUIRING AN INTEREST IN REAL PROPERTY U.S. DEPARTMENT OF ENERGY LABORATORY OPERATIONS BOARD FUTURE LABORATORY INFRASTRUCTURE SUB-GROUP.
Advertisements

GLENARM POWER PLANT REPOWERING PROJECT WORKSHOP
Integrated Facility Management (IFM) For NSLS-II October 6, 2010 Chris Johnson Facility Complex Manager Facilities and Operations.
Office of Nuclear Energy 1May 20, 2013 Property Management Workshop Office of Nuclear Energy Program Perspective Delivering Nuclear Solutions for America's.
1 Depart of Energy RE/FIMS Workshop 2011 REAL ESTATE.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Purchased Utilities and OMP Roundtable UC Budget Conference October 22-23, 2007 Clif Bowen, Moderator.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Ultra High Efficiency Commercial Buildings Office of Energy Efficiency and Renewable Energy’s Research Support Facility Driving Energy Efficiency through.
Campus Energy Efficiency Fund PERC Fall Conference and Annual Meeting Climate Change Panel Joyce Ferris October 29, 2013.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Update from the CFI: Meeting of the Council of Chairs of Canadian Earth Science Departments Ottawa (ON), October
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by Midwest Research Institute.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
Leadership in Energy and Environmental Design (LEED) Binghamton University The State University of New York
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
UAF research leads to inventions Invention Disclosures by Year.
Lane Community College Presentation to the Board of Education, September 12, 2007.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
ANGELO STATE UNIVERSITY FINANCE AND ADMINISTRATION Sharon K. Meyer Vice President.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
1 Emergency Services Operations Center Williamson County Commissioner’s Court – October 2010.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Phoenix Convention Center Phoenix, Arizona Goal Setting and Performance Based Contracting Track 7: Building Performance Session 5: Constructing High Performance.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
University of Florida. Introduction About University of Florida Intent and Background on the Project UF Green and Growing.
Strategic Partnerships Lee Cheatham September 10, 2015.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
11/1/20151 ACC COMMUNITY LEARNING AND DEVELOPMENT CENTER.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
Center for Advanced Energy Studies Harold S. Blackman Interim Director, CAES July 18, 2007.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Wherever Your Path May Lead …. RTS Takes You There!
The NOAA Center for Weather and Climate Prediction Project Developing a Partnership to Provide a New High Technology Research Center A Briefing to Governor.
A+ for Energy ® Energy Educator Training Conferences Sponsored by BP, Presented in Partnership with The NEED Project and NREL The Great Lakes Energy Story.
University of Central Florida David Norvell PE, LEED AP December 15,
Bankhead Central Depot APSE Visit 26 th Feb 2014.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Cancer Institute Frederick National Laboratory is a Federally Funded Research.
Energy Sustainability, The Challenge for Future Generations John A. Turner National Renewable Energy Laboratory Denver West Pkwy, Golden CO
Biomass Cogeneration Facility Savannah River Site Aiken, SC
Wherever Your Path May Lead …. RTS Takes You There!
ENERGY EFFICIENCY & SUSTAINABILITY IN NEW SCHOOL CONSTRUCTION August 10, 2006 SFB STUDY SESSION.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
PLANNING FOR A NOAA SCIENCE CENTER June 28, 2000.
Strategic Planning and High Performance Design to Reduce Energy and Environmental Impacts at Brown University EPA Brownfields 2006 Kurt Teichert Resource.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
Federal Electronics Symposium – East Peter Hathaway June 17, 2009 NREL’s Gold Standard.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
Energy Systems Integration Facility May Renewable and Efficiency Technology Integration ESIF Supports National Goals National carbon goals require.
Cyber Security Studies Building 4/1/20161 Groundbreaking - Oct 21, 2016.
Facilities Master Plan
Building for the Future of Education: Propositions S and N
Achieving Energy Savings and Awareness with an Intelligent Campus Program August 29, 2017 Anna Hoenmans, P.E. Celeste Cizik, P.E.
Forsyth County 2016 Bond Referendum
The New York Power Authority
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Learn about the collaboration:
PULSE Building Renovation
Presentation transcript:

1 FIMS Conference, 2008 Ed Weideman

2 Location of NREL Sites in the Denver Metro Area

3 NREL Owned vs. Leased – Occupants (9/30/07) NREL Owned vs. Leased –GSF (9/30/07) Owned % Owned 460,326 63% Leased 274,608 37%

4 NREL Sites (as of 09/30/07) AcresTotal GSFOwnershipOccupants (as of 9/30/07) Distance from STM site South Table Mountain*327404,242Owned National Wind Technology Center 30556,084Owned9120 miles Denver West Office ParkN/A207,247Leased miles Joyce Street FacilityN/A56,000Leased08 miles ReFuel FacilityN/A4,576Leased615 miles Washington, D.C.N/A6,785Leased10--- Total632734, * Approximately 136 acres of site can be developed; the balance is in easements.

5 South Table Mountain Site (looking from the east)

6 South Table Mountain Site (looking from the west)

7 NREL Laboratory Utilization (as of 09/30/07) Total Labs Available= 297

8 NREL Workstation Utilization (as of 09/30/07)

9 Denver West Office Park Bldg 15, 16,17 NREL STM Site Denver West Office Park Bldg 15, 16,17 NREL STM Site Denver West Office Park Bldg 15, 16,17 NREL STM Site Denver West Lease Facilities and South Table Mountain Site

10 National Wind Technology Center

11 Solar Research Facility (SERF) and Science and Technology Facility (S&TF)

12 Science & Technology Facility Funding TEC$22,690,000 TPC$29,190,000 by CD-2/3 authorization Year 1$800,000 Year 2$769,958 Year 3$3,924,707 Year 4$6,626,568 Year 5$10,409,850 $22,531,083 Note: -$158,917 unfunded

13 Science & Technology Facility Milestone datesScheduled Actual 1 CD-1 6/14/2002 6/10/ Preliminary Design 12/28/ /27/ Final Design 7/30/2003 9/30/ Substantial Completion 12/1/2006 6/21/ Construction Complete 12/1/ /16/2006 Parameters Sq. Ft. Office & Office Support10,425 Lab22,933 Lab Support11,442 Building Support26,547 71,347 No. Staff 55 (72 as configured) LEED Funded = Silver; Designed = Gold, Constructed = Platinum Pwr Consumption 42% less energy than ASHARE std office bldg~$96,000/yr savings Summary:Under budget, ahead of schedule, Platinum LEED

14 South Table Mountain Campus

15 STM Build-out Site Plan with Utilities

16 FY07 Construction Line Item Research Support Facility –$73 MillionFY06-$10,000,000 / FY07-$63,000,000 –220,000 SF –800 Occupants (NREL/GO) –LEED Platinum –25,000 BTU/Sq Ft/Year –Move out of Leased Buildings –Design-Build Project –Stipends for Two Unsuccessful Bidders –Incentives for Safety, Design, Workmanship, Timelines of Completion, Responsiveness, Cooperation, Partnering, Social Economic Commitment. –Construction Start October 2008 –Construction Complete June 2010

17 FY07 Construction Line Item Integrated Bio-Refinery Facility –$20 Million TEC –$6 Essential Equipment –16,400 SF –30 Occupants –Design Build Project –Expand Feedstock Input Capability to Existing Ethanol Plant –Construction Start November 2008 –Construction Complete November 2009

18 Energy Savings Performance Contract (ESPC) Renewable Fuels Heating Plant (RFHP) –Ameresco –2,000SF Pad –$3,200,000 –24yr payback –Wood chips, One trailer per day (Heating season) –Construction Start September 2007 –Construction Complete August 2008 –1 st Performance Year Heating Season

19 RFHP May 1, 2008

20 FY08 Construction Line Item Energy Systems Integration Facility (ESIF) Funding –TEC$93,000,000 –TPC$98,300,000 –Year 1$54,500,000 –Year 2$4,000,000 –Year 3$34,500,000 –Equipment$34,000,000 –Supercomputer$12,000, ,000 SF 150 Occupants Construction Start September 2009 Construction Complete September 2011

21 Challenge: Address integration issues unique to renewable and efficiency technologies. Critical at this stage of their development to accelerate large-scale deployment Function: Unique DOE capability for conducting integrated research, testing, and analysis to enable economic, reliable integration of renewable electricity generation, fuel production, storage, and building efficiency technologies with the U.S. fuels and electricity delivery infrastructures. 130,000 sq ft. multi-story space building with high-bay and low-bay laboratories User facility for collaborative research and testing High-speed computational science capability. Office and support space researchers and partners. Energy Systems Integration Facility (ESIF)

22 “Take me to your LEEDer”