Denver International Airport South Terminal Project and Taxi Operation Update
South Terminal Redevelopment Project
Current Phase of Project
Excavation of South Grounds
Removal of Terminal Roadway Bridges
Taxi Driver Dwell Time Project Goals: Upgrade the AVI System Software Allow Cab Operators to Load / Manage Their Daily Dispatch Lists Monitor and Report About Drivers’ Dwell / Duty Time
Entrance to the Holding Lot
Installation of Proximity Card Readers
Taxi Dispatch Queue
Revenue Collection Gate
Dispatcher’s Window
Dwell Time and AVI Tag Read Functions
Project challenges Airport IT / Software vendor interface Timeline control Hardware and installation Communication with taxi operators / PUC Training for staff and operators