Outage Coordination Process and New Equipment 1. Introduction This presentation is intended to increase knowledge of outage coordination and NOMCR submittal.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Advertisements

Substitute Online Staff Training Advanced. Substitute Online – Advanced Top Navigation Options.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
FLEET User Manual July 1, Part One – User Names & Passwords I.User Names & Passwords A. Creating an Account B. Forgot Password C. Updating .
PROACTIS: Supplier User Guide
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
1 New Generation Commissioning Emal Latifzai Operations Support Engineer New Generation Information Forum ERCOT Public November 4, 2014.
In an internet browser type: If you have never used this software before, click on create an account. If you have used ilrn, click on Sign.
Presented By: Katie, Jake, Janet, Marcellous, and Junaid.
ERCOT OCITF 3/23/ ISO Comparison – NEISO Alex Lee (ERCOT) Lee Blaede (NEISO) ERCOT OCITF 3/23/2015.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
QSE/RE Transmission Facilities Outage Coordination Workshop.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
Data Extracts & Reporting Recent Issues ERCOT Information Technology Data Extracts Working Group 11/27/07.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
1 Market Trials Outage Scheduling Weekly Update July 09, 2010.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
NPRR 219 & Outage Scheduler Enhancement Workshop April 28, 2014.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
ISO Comparison – CAISO Alex Lee (ERCOT)
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Texas SET Version 3.0 Production Implementation Plan.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Visalia Unified School District SRTS User Training November 21, 2005 By SRTS Support
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Network Model Management System (NMMS)
BUS HIVE TRIP REQUEST USER GUIDE TRAINING FOR TRIP REQUESTORS & APPROVERS California State University, Chico Vehicle Reservations Office.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Stability Limit Management Chad Thompson Manager, Operations Support Planning Working Group Meeting ERCOT Public January 20, 2016.
1 TX SET Mass Transition Project RMS Update March 15, 2006.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Applying to Take the PMP ® Examination. 2 PMP ® Requirements Project Management Professional If you hold a bachelors degree: –Minimum of three years professional.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
Texas Nodal Electrical Buses and Outage Scheduling.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Outage Scheduler Matt Carter & Victor Vaughn Garland Power & Light
Welcome! To the ETS – Create Client Account & Maintenance
System Operator Certification Program
Spring CAPP Information Presentation
Transmission Outage Coordination
Marking a Piece of Equipment for Transfer/Scrap/Withdrawal
Exam Accommodations Guide for using the Exam Access module within myAccess to request accommodated exams with the Disability Center.
ETS – Air Data submission Training
2019 Convention Planner Training Using NCA Convention Central: Part IV
Exam Accommodation Requests & Exam Policies and Procedures
New Student Orientation
Time-Based Management of Large Scale Network Models
Presentation transcript:

Outage Coordination Process and New Equipment 1

Introduction This presentation is intended to increase knowledge of outage coordination and NOMCR submittal processes 2

Objectives At the completion of this course of instruction you will: Identify the ERCOT Outage Coordination timelines Identify the timeline requirement for a maintenance level outage Identify the maximum size of a group outage Identify the correct process order for new equipment in the ERCOT system 3

Definitions NOMCR – Network Operations Model Change Request ResTran – RESource Owned TRANsmission Equipment 4

Outage Coordination Planned Transmission Timeline Request for Approval* ERCOT must Approve or Reject* More than 90 days75 days 46–90 days30 days 9–45 days4 days 4–8 daysNo later than 1800 hours 3 days 3 daysNo later than 1800 hours 2 days *Prior to Planned Start Date/Time 5

Outage Coordination Planned Resource Timeline QSE Request for Approval ERCOT Approval or Rejection Three days1800 hours, two days prior to start of proposed Outage Four to eight days1800 hours, three days prior to start of proposed Outage Nine to 45 daysFive Business days after submission. Outages are automatically accepted if not rejected at the end of the fifth Business Day following receipt of request. Greater than 45 daysERCOT must accept, but may discuss reliability and scheduling to minimize cost. 6

Timelines for Reliability Resource Planned Outages (RMR and Black Start) Note: ERCOT may, at its discretion, relax the 30 day Notice requirement. Request for Approval ERCOT Approval or Rejection Not less than 30 days 15 days before start of proposed Outage More than 45 days30 days before the start of proposed Outage 7 Outage Coordination Planned Resource Timeline 7

Outage Coordination Maintenance Timeline Definition: Initiated manually to remove equipment from service to perform work on components than could be postponed briefly but is required to prevent potential forced outage and cannot be postponed until the next planned outage. Level 1:Applies to equipment which must be removed from service within 24 hours. (M1) Level 2:Identifies equipment which must be removed from service within 7 days. (M2) Level 3:Applies to equipment which must be removed from service within 30 days. (M3) 8

ResTran Forms are available on resquest forms to Different forms for Forced Outages 9

ResTran - Planned or Maintenance 10

ResTran - Planned or Maintenance 11

ResTran - Forced Outages 12

d ResTran - Forced Outages 13

ResTran - Outage Form 14

ResTran - Outage Form 15

ALWAYS review the outages after they were submitted by ERCOT on your behalf to make sure that the outage does exactly what you want it to do when you want it to. To update an outage the most up-to- date form with the new updated information added. ResTran Outage Form 16

Outage Coordination Approvals Approved Outages can be withdrawn any time before it is completed. Planned transmission outages are always studied. Approved -> Done by coordinators Accepted -> Automatic 17

Outage Coordination Availability Short Term: M-F 6AM-6PM, Sa-Su 6AM – 2PM –Rotating Shifts* Long Term: M-F 6AM-5PM Use OC Blast Accounts – –Phone: (512) 248 – 6841 No Voic * 18

New Equipment Create plan for switching from old to new equipment May require pseudo equipment i.e. Breakers to switch between equipment… Submit a NOMCR for all new and pseudo equipment 19

New Equipment Pseudo Equipment Pseudo Breaker Breaker New Breaker Old Breaker 20

NOMCRs A 21

22 NOMCRs

23

NOMCRs 24

NOMCRs A 25

New Equipment Outages After the NOMCR has been processed and the equipment has been added to the OS Database Planned End Date is the Energization Date NOMCR >> OS >> Model 26

**BONUS** Extending an outage New Planned End Date Unlimited extensions FR->FE || (PL,M1,M2,M3)->UE Adding Requestor Notes 1000 Characters Only once per group outage The maximum Group Outage size is 30 pieces of equipment 27

**BONUS MIS** 28 Outage Approved/Accepted Outage Rejected Removed from MIS 2 Hrs. After Actual End Entered Outage Withdrawn Planned End > 1 Yr. Old *All reports are automatically updated every hour on the hour *When an outage is added to one report it is removed from the previous report Or Outage Canceled Outage Canceled Outage Submitted Rejected Transmission Outages Withdrawal of Approved and Accepted Transmission Outages Approved and Accepted Transmission Outages Proposed Transmission Outages

Questions ? ? ? ? 29

Questions 1. The last day to enter a Planned Transmission Outage is ________ before the Planned Start Date. A) 1 Day B) 3 Days C) 8 Days D) 45 Days 30

Questions 2. Planned Resource Outages must be accepted when entered ______ before the Planned Start Date. A) >3 Days B) >9 Days C) >30 Days D) >45 Days 31

Questions 3. A level 2 maintenance outage (M2) means that the outaged equipment must be removed _______ to prevent a forced outage. A) <7 Days B) <30 Days C) <7 Hours D) <1 Hour 32

Questions 4. The maximum size of a group outage is _______. A) 10 pieces of equipment B) Unlimited C) 30 pieces of equipment D) 2 megabytes of equipment 33

Questions 5. What is the correct process order for new equipment in the ERCOT system? A) NOMCR >> OS >> Model B) NOMCR >> Model >> OS C) OS >> Model >> NOMCR D) Model >> NOMCR >> OS 34