SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-

Slides:



Advertisements
Similar presentations
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Advertisements

FUTURE NTDC PROJECTS UPTO
Monthly Progress Report on NTDC Development Projects for May, 2013
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Monthly Progress Report on NTDCL Development Projects for September, 2013.
Regional Planning Group Project
NTDC Projects for which Financing is Required
Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER MONTHLY PROGRESS REPORT on NTDC DEVELOPMENT PROJECTS for January, 2013.
Brief on HVDC 2015 Brief on HVDC 2015
Informations about Brazilian Auctions Reserve Energy Auction – LER 2013 Date of Occurrence : August 23th, 2013 Date for Supply: September /2015.
LOAD FORECAST SECTION 1. 2 FORECAST METHODOLOGIES & TOOLS i.Power Market Survey (PMS) Medium Term (5-10 years) ii.Regression Long Term (25-30 years) LOAD.
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
LINKS SURVIVAL POWER AUX POWER VOLTAGE LIMITS LINE CHARGE MVAR LINE
Presentation to WECC TSS May 8, 2015
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
FUTURE NTDC PROJECTS UPTO
0 PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY August 11, 2009 BY ENGR. MAQSOOD SHAFIQUE QURESHI ENGR. HAJI MUHAMMAD FAROOQ AHMAD.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER.
Quarterly Report on NTDC Development Projects
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
Power Pooling in Europe for the GMS/ASEAN Interconnection Programme Stockholm, 24 November.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
Preliminary Studies of the Electric Power Distribution for CLIC
EASTERN PLAINS TRANSMISSION PROJECT Tri-State Generation & Transmission and Western Area Power Administration.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Iraqi kordistan Region Iraqi kordistan Region Click Click Back Iraq Map.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER.
1 Department of Electrical & Communication Engineering CHAPTER 1 Per Unit Calculations 1.Power System Representation Power Component SymbolPower ComponentSymbol.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
ERCOT Independent Review
POWER SECTOR, ENERGY RELATED RESEARCH POTENTIAL in LITHUANIA by dr. Anzelmas Ba čauskas Lietuvos energija AB, Lithuania CENTRAL-EASTERN EUROPEAN ENERGY.
Electrical Engineering
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
Jeff Billo Manager, Transmission Planning
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.
Kazakhstan Electricity Grid Operating Company Astana, 2013 Kazakhstan National Power Grid: current state and prospects for development KEGOC.
ELECTRICITY PRODUCTION WORLD WIDE
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Entergy Integration Study Update
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Design of Electric Power Systems and Utilities
Paris distribution system
Nathan Kassees, P.E. Sr. Engineer Oncor Electric Delivery
Yale Runback Local Area Protection Scheme
Exercise Session 2 Power systems.
Presentation transcript:

SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO- NING 1- Dispersal of Power from 1100 MW Kohala Hydro Power Project to Gujranwala Three 500 kV line bays at Kohala One 500 kV line bay at Gujranwala 500 kV 225 km long Kohala – Gujranwala S/C T/L Two 500 kV T/Lines 15 km each for in/out of 500 kV Neelum Jhelum – Gujranwala at Kohala Dispersal of Power from Karot HPP (Phase-II) kV Kohala – Karot – Gujranwala (240 km) In/out of 500 kV Neelum Jhelum – Karot circuit at Kohala (4+4) LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS 1

SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO- NING 3- Power Dispersal of 740 MW Munda HPP - In/Out of 220 kV Peshawar – Shahi Bagh at Munda (35 km) Dispersal of Power from 4500 MW Diamer Basha HPP to Lahore with interconnection at Dasu and Gujar Khan 765 kV HVAC substations at Gujar Khan & Lahore with 765/500 kV 3x500 MVA T/Fs 500 MVAR SVC at Gujar Khan Three 765 kV HVAC T/Ls from Basha to Gujar Khan (407 km long each) Two 765 kV HVAC T/Ls from Gujar Khan to Lahore (260 km long each) LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS 2

SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIREDD YEAR OF COMMISSIO- NING 5- Dispersal of Power from MW Bunji Hydro Power Project to Lahore with interconnection at Gujar Khan 765 kV HVAC substatin extn at: Basha, Dasu, Thakot, Gujar khan Lahore 765 kV new substation at Bunji. 2 x 765 kV HVAC 110 km long Bunji - Basha S/C T/Lines 1x765 kV HVAC 759 km long Bunji – Dasu-Thakot-Gujar Khan-Lahore S/C T/Lines Total LIST OF POWER DISPERSAL PROJECTS FOR LARGE HYDRO POWER PLANTS Studies are being carried out to ascertain the interconnection schemes for the projects at Sr. No: 1 to 5 3