1 Kazakhstan Electricity Grid Operating Company www.kegoc.kz Astana, 2013 Kazakhstan National Power Grid: current state and prospects for development KEGOC

2 System Operator for the Unified Power System (UPS) in Kazakhstan Electricity transmission via Kazakhstan National Power Grid (NPG) Technical dispatching of electricity generation and consumption Electricity generation and consumption balancing Natural monopoly Assets 35-1150 kV overhead transmission lines, 24 577 km 76 substations, 35160 MVA  Manpower 4.7 thousand employees KEGOC – General Information

3 Schematic map of Kazakhstan Unified Power System for 2013

4 Implementation Period Project cost, KZT billion Moinak Electricity Transmission Project2010-20129.89.8 Alma Electricity Transmission Project2009-201430 Kazakhstan Electricity Transmission Rehabilitation Project, Phase II 2010-201652 Ossakarovka Transmission Rehabilitation Project2010-20144.24.2 Kazakhstan NPG Development Projects in progress

5 Estimated completion period Estimated cost, KZT billion Reinforcement of electricity transmission link between Pavlodar power region and Unified Power System of Kazakhstan 2010-20165.5*5.5* 500 kV North-East-South Electricity Transmission Project 2011-2018105.5 Phase I: 500 kV Transmission line Ekibastuz – (Shulbinsk HPP)Semei – Ust-Kamenogorsk 2011-2017 45.5* Phase II: 500 kV Transmission Line (Shulbinsk HPP) Semei – Aktogai - Taldykorgan - Alma 2012-2018 60 Balkhash Electricity Transmission Project2010-202031.3 Stage I: 1320 MW Balkhash TPP 2010-2017 3.73.7 Stage II: 2640 MW Balkhash TPP 2016- 2020 ** 27.6 Construction of Kazakhstan – Kyrgyzstan 500 kV cross-border transmission line 2012-201822.5 NPG Rehabilitation Project2012-202084.8 Investment Projects up to 2020 * - Project cost as per Feasibility Study * * - Implementation period depends on the commissioning date of the second stage of Balkhash TPP

6 Estimated implementation period Estimated cost, KZT billion Construction of 500 kV Aktau –Beineu - Kulsary – Atyrau Transmission Line 2021-202571.2 Construction of 500 kV Atyrau – Ulke Transmission Line 2021-202529.5 Construction of the second 220 kV Uralsk-Atyrau and Kulsary-Tengiz Transmission Lines 2021-202521.3 Construction of 500 kV Astana SS and connection to the Kazakhstan NPG with 500 kV lines 2021-202523.7 Construction of 500 kV Nura – Zhezkazgan Transmission Line 2021-202527 Torgai Electricity Transmission Project2021-2025* *12.8 * * - implementation period depends on commissioning date of the Torgai thermal power plant Investment Projects up to 2025

7 Schematic map of Kazakhstan Unified Power System in 2025

8 Thank you for your attention