Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.

Slides:



Advertisements
Similar presentations
T1. DESIGN OF STEEL BEAMS Steel framed building
Advertisements

Overview Waffle Slab.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
High Rise Structural Systems
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Reading Structural Drawings
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Game Day Building Post Tensioned Redesign AE Senior Thesis Spring 2009 Matthew Haapala BAE/MAE Structural Option Faculty Consultant: Dr. Hanagan.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Structural Curriculum for Construction Management and Architecture Students 1 Prepared by: Ajay Shanker, Ph.D., P.E. Associate Professor Rinker School.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
PCI 6 th Edition Lateral Component Design. Presentation Outline Architectural Components –Earthquake Loading Shear Wall Systems –Distribution of lateral.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
An-Najah National University
CONDOMINIUM TOWER & PARKING
Outline: Introduction: a ) General description of project b) Materials
Prof. Kurtz, Age 7. Prof. Kurtz, Age 7 Prof. Kurtz, Age 7.
Integrative Design of a Secondary School
Lecture 39 - Design of Two-Way Floor Slab System
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
North Shore at Canton The Pennsylvania State University
An Najah National University Submitted to : Dr.Munther Diab .
Presentation transcript:

Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option

Introduction The Biomedical Research Building (BMR) is located in Hershey, Pennsylvania sq. ft, in 7 stories above grade Built between Cost $49 million Used a Bid-Build project delivery method Used for Education and Laboratory space Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Architecture Façade of the BMR consists of long horizontal concrete and limestone slabs, and black glazing Façade designed to relate to buildings already existing on campus Cylinder and Planar wall on corners add to the otherwise flat building Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Structure The BMR is a monolithic concrete structure, using a one-way flat plate system with the average column size about 22” by 22” Building sits on a deep foundation system of caissons 3 to 7 feet in diameter Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Structure Analysis shows that columns have an extra 35% capacity for applied loads Design of the lateral system maintained symmetry, resulting in only a 6” eccentricity. Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Based on extra capacity of columns, goal was to be adding 3 extra stories to top of building, top story floor to floor height to be 24.6’ instead of the average 12.3’ This extra space would serve for a studio or recreational setting for students. Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Assumed gravity loads were to be: 150 PSF dead 40 PSF snow 15 PSF superimposed 80 PSF live Self weight of the columns and bracing beams factored in as well Typical Column Section Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Axial Loads calculated for a typical column over a 21’ by 35’ bay area. As loads increase, they approach total capacity This does not allow much room for applied moments from lateral or asymmetrical loading Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Loads were calculated again for the 1 st, 2 nd and 3 rd floors, using live load reduction of 53% Exceptions were used for live loads over 100 PSF, per IBC, at 20% Allows more room for moments Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Loads were calculated again for the 1 st, 2 nd and 3 rd floors, using live load reduction of 53% Exceptions were used for live loads over 100 PSF, per IBC, at 20% Allows more room for moments Minimum allowance: 32% for 31% Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics Example Calculation

Process Bracing beams were necessitated through exceptionally long columns, about 22’ in height Beams were chosen to be 24” by 24” to match column sizes Would allow for an architectural feature on the top floor. Bracing Beam Section Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Assumed a 15 PSF superimposed load for mechanical and electrical equipment 600 PLF dead load. 66 and 96 ft*kip moments necessitate 4 #7 rebar Torsion and shear reinforcement was found to be negligible according to ACI Bracing Beam Section Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process A RAM Model was developed to analyze the effect of controlling wind and earthquake forces. Addition was designed maintaining symmetry and negligible eccentricity as rest of building, minimizing unusual torsional effect and forces RAM Model Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Distributing story shear forces across all columns on a story by a factor of 1.5%, lead to a shear force of 9 kips Moment of 111 ft*kips per column Story and Total drifts are well within acceptable H/400 limits Overturning is controlled by gravity loads Story Drifts Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Distributing story shear forces across all columns on a story by a factor of 1.5%, lead to a shear force of 9 kips Moment of 111 ft*kips per column Story and Total drifts are well within acceptable H/400 limits Overturning is controlled by gravity loads Story Drifts Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Story Drifts Distributing story shear forces across all columns on a story by a factor of 1.5%, lead to a shear force of 9 kips Moment of 111 ft*kips per column Story and Total drifts are well within acceptable H/400 limits Overturning is controlled by gravity loads Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Process Story Drifts Distributing story shear forces across all columns on a story by a factor of 1.5%, lead to a shear force of 9 kips Moment of 111 ft*kips per column Story and Total drifts are well within acceptable H/400 limits Overturning is controlled by gravity loads Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

HVAC (Breadth 1) Insulation Calculated CFM requirements for the addition were found to be CFM 4050 people at 20 CFM and sq ft at.06 CFM BTU Loads for CFM and people and insulation were found to be 5 million BTU/HR for both heating and cooling Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Lighting (Breadth 2) Typical Luminaire For a recommended 500 lux for a work space, the total room of 90’ by 210’ with its 12 bays requires 200 luminaries, allowing 18 per bay Two systems were developed, one at 12.3’ high, and one at ceiling for the top story, but ceiling height would cast shadows Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Acoustics (Breadth 3) Calculations Acoustical tile was initially placed on ceiling, beams, columns, and carpeting was used. Created a “dead space” which would have been disconcerting to occupants Toned back acoustical insulation to just beams and columns, as well as carpeting Table of Contents Introduction Architecture Structure Process HVAC Lighting Acoustics

Questions?