9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.

Slides:



Advertisements
Similar presentations
Engineering Services Planning Limited
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
HVACR116 – Trade Skills Mechanical Drawings.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
CLIC Civil Engineering Update
Americas KlyCluster Cost Analysis Overview
Part II: Integrated Design of Infrastructures
Detector hall in mountain regions
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Tom Lackowski Fermilab
COOLING & VENTILATION INFRASTRUCTURE
Electrical Gas Plumbing Heating & Cooling
Private Fire Hydrant. Fire hydrant systems (also known as fire pumps, hydrant boosters, fire water pumps) are high pressure water pumps designed to increase.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
M&E SYSTEM.
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski

9/17/07 ILC Detectors 2 Agenda Meeting Goals Establish Interfaces –BDS; Detectors; CFS GDE; CFS Detectors; CRYO; Others –What is included in the GDE/RDR Potable Water, Sanitary, Sumps, House Power; HVAC Reasonable Baseline Criteria Breakout Sessions –Electrical - Tom Lackowski –Water Systems – Steve Krstulovich –HVAC- Steve Krstulovich –Emil Huedem and Lee Hammond via Webex

9/17/07 ILC Detectors 3 Goals for this Meeting Identify the point(s) of contact with whom we will develop reasonable requirements, in order for CF&S to produce a design and credible cost estimate. Identify what information we know and identify what information we do not know along with a plan, a responsible person, and timeline to determine the missing information. Discuss potential designs and their cost implications. Establish the magnitude, or at least a range, of the power and cooling loads.

9/17/07 ILC Detectors 4 Additional Goals We intend to leave this meeting with the values for electrical and cooling loads. Or at a minimum, a name, of who will provide the information. Known Educated Guess Or Scaled WAG

9/17/07 ILC Detectors 5 Interfaces

9/17/07 ILC Detectors 6 Proposed Lines of Interface Between Detector and CF&S The detector cost accounts includes all systems that move with the detector; cooling, electrical, fire detection/protection. The detector cost accounts includes all connections to equipment not installed by CF&S. –Distribution beyond panel boards for electrical –Distribution beyond pipe headers for water cooling systems

9/17/07 ILC Detectors 7 Convention Facilities / GDE Established the Site Roads, Walks, Fences High Voltage Electrical Substation with switchgear Communication Ducts Potable Water, Sanitary Sewer, Fire Hydrants Buildings Typical Industrial Building –House Power- Lighting; Outlets, but no equipment power –HVAC – Heating and Cooing for environment loads and people loads, but no equipment loads –Fire Detection and Fire Protection –Toilet Rooms –Cranes

9/17/07 ILC Detectors 8 Convention Facilities / GDE Shafts –Two 16 m shafts –Elevators and/or Stairs –HVAC Ductwork –Cableways –Sumps Detector Hall –Hall 120 x 25 x 37 M of excavation –Cranes –Allotment for Steel Platforms (From CERN) –Steel track Plates 20 x 80 x.05M –Minimal Lighting –Minimal HVAC

9/17/07 ILC Detectors 9 Conventional Facilities / Detectors –Finish Out Walls, doors, flooring Control Rooms? Clean Rooms? Shield Door?? Security and control structures –Detector Electrical User Power to Switchboards and Panel boards Complete Lighting Utility outlets, including welding outlets Grounding Systems –Standard Building Grounds –Isolated Grounds

9/17/07 ILC Detectors 10 Conventional Facilities / Detectors Process Water –LCW –Chilled Water HVAC –Normal Ventilation –Purge Ventilation if Required –Air Cooling –Computer/Control Room Cooling –Humidity Control –Controls

9/17/07 ILC Detectors 11 Pushing Back from the Get Go The baseline criteria should reflect an upper bound of what could be required. Value Management should start Now. There should be No Contingency in the requirements or criteria. Please help by questioning the requirements to achieve the best value, while maintaining the desired function.

9/17/07 ILC Detectors 12 Thank you for your Attention Discussion