Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Toolbar – Groups of actors Owner Name Operator Name Architect Name Total contractor Name School.

Slides:



Advertisements
Similar presentations
Industrialization of Electrical Contracting Supply Chain and Logistics Management Santa Clara University School of Engineering Department of Civil Engineering.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Virginia Housing Coalition 2013 Housing Credit Conference Deal Structuring, Fundamentals, and Financing and Legal Issues.
Development managing the risk a presentation by ROGER FORD MRICS London, 29 th June 2004.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Chapter 9 FACILITY MANAGEMENT.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
RHONALPENERGIE -ENVIRONNEMENT Regional energy and environment agency www. raee.org.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
FAQ site Created by: Meir Cohen Asaf Lupo Supervisor: Viktor Kulikov Software Systems Lab Department of Electrical Engineering Technion - Israel Institute.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Construction Industry. Salisbury Cathedral Taj Mahal.
Financing Urban Public Infrastructure
Peer Reviews. 2  Strengths and/or Best Practices across multiple Sites ◦ Internal customers involved in Acq. Planning (3) ◦ Leveraging buying power.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
ClearSupport: WP3 Financing Schemes for Building Renovation Clearinghouse Support Chania 24 September 2009 Andreas Dördelmann, Investitionsbank Schleswig-Holstein.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
2nd Modern Housing SWG Meeting Presentation of activities LARCO ICOS Laboratory, Italy RESEARCH LABORATORY AND TECHNOLOGY TRANSFER IN COSTRUCTION Venice,
American Model. Public-Private Partnerships Public Development Private Development Public-Private Partnerships PrivatizationSubsidization.
Constructionsite Roles in Construction Ron Gatepain.
Islamic finance Infrastructure Tariqullah Khan. Financial infrastructure comprises of the resources, support, protection, facilities and utilities that.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
Entertainment orporation’s Film Studio Development Presented By: Aahlada Chennupati Elissa Flandro Manish Kumar Vasiliki Micha October 22, 2008 Entertainment.
Newsletter – Issue Ν ο 5 (June 2008) SUSCON is a LIFE – Environment project (LIFE 05 ENV/GR/000235) aiming at the adoption and application of “sustainable.
Renew School – WP 3 Cooperation models, Geier, Toolbar – Actions Architect The color of the field indicates the activity group of the respective.
Chapter 2 Organizing For Development. Organization of the Firm -Two extremes - Many services under one roof (architects, construction managers, engineers,
The Projects Side Steve Berezansky OSFC Chief of Projects.
LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING.
Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites description 2nd PP meeting Portugal, 8-10 July 2013 Simona Tekavec Arronches,
Types of PPP. What is PPP? The term PPP is a literal translation of the English term “public-private relationship”. PPP is a form of cooperation between.
Finance and Tax and Administration Legislative Review Friday May 7, :00 AM – 11:30 AM.
Initiating a sustained diffusion of wind power: the surprising role of public-private partnerships and business culture in Spain Dr. Valentina Dinica CSTM,
BUY SELL TRYING ON THE SOLUTION
Presenting author name Logos, Your organization, Funding Body!
1 E F F I C I E N C Y D E C I D E S State Properties and public Buildings. Energy costs: about 3.5 billion €/year Source: Umweltbundesamt, 2000 and own.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
Social Development Tool for Institutional Analysis- Organizational mapping Organizations = Structure & Function Organizations are groups of individuals.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
The Design / Build Advantage
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
Federal Treasury Deputy Head A. Demidov Prospects for Development of the Federal Treasury Control Powers.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
The importance of process in high performance building design.
CAPITAL FACILITIES PROGRAM UPDATE BOARD OF EDUCATION FEBRUARY 8, 2016 FACILITIES SERVE EDUCATION.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Build a Professional Team Site Selection / Market Analysis Preliminary Feasibility Option to Purchase Land Feasibility Study Financing and Ownership Entity.
GUARANTEED ENERGY SAVINGS CONTRACTS
Online Application Instructional Guide February 28, 2014
Prospects for Development of the Federal Treasury Control Powers
Property Assessed Clean Energy
Fun Facts: James M. Bennett High School
Enercare Zero Net Energy Building Controls
Budget and finance Ryan Kahlden June 12, 2017.
(Refer to Chapter 2 of the textbook)
From Plan to Implementation: what is our challenge?
Project Development and Managing your Build Agenda
Pre-contract Planning and Practice
Analysis models and design models
What type of tissue is indicated by the blue arrow?
Coppin State University
SELECTIVE FORESEE THE FUTURE WITH.
Housing Rehabilitation Program
Introduction – Identification of Basic Bindings in the Company
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Construction Management Services April 16, 2018
FAR part 1.
Presentation transcript:

Renew School – WP 3 Cooperation models, Geier, Toolbar – Groups of actors Owner Name Operator Name Architect Name Total contractor Name School management Funding Institution Name Owners and owner representatives The color of the ellipse indicates the group an actor belongs to: Designers, planners, engineers and consultants Realization of construction Building operators, facility managers, suppliers and providers Name Authority Users and user representatives Authorities (permission and control) and insurance companies Investors, financing and funding institutions

Renew School – WP 3 Cooperation models, Geier, Toolbar – Roles and actors Project manager Name Owner Name Operator Name Architect Name Planner HVAC Name Planner Electricity Name Planner Xxxxx Name Site manager Name Planner Xxxx Name Consultant Xxxx Name Architect Proj.coordinator Name Planner HVAC Investor Name Facility manager Name Total contractor Name Planner HVAC Name Contractor HVAC Name Contractor Prefab Name Contractor Automation Name Contractor Electricity Name Contractor Automation Name Main contractor Name Contractor Construction Name Planner HVAC Name Contractor Xxxxx Name Contractor Xxxxx Name Contractor Xxxxx Name Contractor Xxxxx Name Contractor Xxxxx Name Contractor Xxxxx Contractor Timber constr. Contractor Xxxxx Sub-Contr Windows Sub-Contr Shading Sub-Contr Roof Sub-Contr Xxxxx Sub-Plan Build. Ph. Sub-Plan Statics Sub-Plan Fire-prot Sub-Plan Xxxxx Name Planner HVAC Other users Xxxxx Name Pupils School management Parents association Name Planner HVAC Name Caretaker Funding Institution Name Funding Body Name Investor (PPP) Name Insurance company Authority (Build perm) Authority (Fire prot) Utility provider (electricity) Name District heating provider Name Club (Music) Name Club (Sports) Name Caretaker Name Teachers Funding Entity Name Investor

Renew School – WP 3 Cooperation models, Geier, Toolbar – Linkages Contractual relation Communication channel Intensive communication Moderate communication Little communication Information flow Intensive inputs from one side Moderate inputs from one side Low influence from one side To be used if communication channel is dominated by one-way information flow Contractor Electricity Name Contractor Automation Name Affiliated actors Actors are in different departments of the same company Project manager Name Owner Name Contract + intensive communication (Sub-)contract + moderate communication Only contract with no or little communication To be used if there is communication (bi-directional) without contractual relation Influenced by legal requirements Determined by legislation, standards or other requirements To be used if (building) legislation, or requirements for funding (subsidies or tax reduction, etc.), from fire protection, influence actors

Renew School – WP 3 Cooperation models, Geier, Example Owner Name Planner Electricity Name Planner Timber constr Name Site manager Name Planner HVAC Name Architect Proj.coordinator Name Planner HVAC Contractor HVAC Name Contractor Automation Name Contractor Electricity Name Contractor Construction Name Contractor Timber constr. Sub-Contr Windows Sub-Contr Shading Sub-Contr Roof Sub-Plan Build. Ph. Sub-Plan Autom Pupils Planner HVAC Name Parents association Teachers Funding Institution Name Authority (Build perm) Name Authority (Fire prot) District heating provider Name Club (Music) Name Caretaker Name Position of the group «User and user representatives» Position of the group «Building operators, facility managers, suppliers and providers» Position of the group «Authorities (permission and control) and insurance companies» Position of the group «Designers, planners, engineers and consultants» Position of the group «Realization of construction» Position of the group «Investors, financing and funding institutions» Please consider the position of the groups – different projects can are then comparable! For your example: Coloured areas and description in blue is only for your information – please delete it for the final version!

Renew School – WP 3 Cooperation models, Geier, Name of your case study/ project Please take bubbles from the toolbar «Roles and actors» and adapt the role to your specific project and provide the name of the actor (company or institution) Please connect bubbles with the lines and connections from the toolbar «Linkages». Please indicate relevant information flows or influences with the arrows from the toolbar «Linkages»