Public Conference 16th December 2010

Slides:



Advertisements
Similar presentations
Mobile World Congress 2013 mHealth: Making a positive difference to end users PwC Strategy 28 February 2013.
Advertisements

Efficiency of recruitment process: trends based on PwC Saratoga HR Effectiveness Survey Anna Kozlova October 7,
Introduction to Public Private Partnerships
Innovative contracting models to deliver integrated care
Climate and Development Knowledge Network | 1 CDKN Technical Assistance selection criteria - overview CDKN Year 4 April 2013.
Calderdale Children & Young Peoples Service
Control System for the Credit Accounts and Guarantees (SCCCyG) regarding VAT Certification Conference given by the Tax Authority (SAT) on October 6th,
18 November 2014 Michael Butler
 Can the business depend on IT for business continuity? BCS North London Branch November Andy Mason MBCS CITP MBCI Head of Business Continuity.
Washington State Transit Insurance Pool Preliminary Discussion Funding Strategies and Metrics
Europe meets the America’s How to structure your investment in Aruba May 6, 2013 Hans Ruiter Rachel Vieira Maduro.
Recent Trends and Insurance Considerations March 2015
100% renewable electricity A 2050 vision and roadmap for Europe and North Africa Pathways to 2050, Dublin Ireland November 5, 2010 Gus Schellekens - PwC.
Higher Apprenticeship and Graduate Recruitment Complementary Approaches to Expanding the Talent Pool – A Professional Services Example Sara Caplan Partner,
 Islamic Finance: Integration into the Financial Mainstream Adapting Western Tax Systems to Accommodate Islamic Finance Mohammed Amin 28 May 2008.
 Source Seminar Intelligent Cost-Cutting February 2009 Eilish Henry.
Housing Delivery Vehicle Option Appraisal Joe Reeves Director Cornwall Council February 2011.
Time to pay back the benefits of bonus depreciation... Or maybe not any time soon with some tax planning… September 21,
Meeting the requirements of IAS 16 - Componentisation
PwC Strategy UK Health and Care Provision UKTI Investor Roundtable Strictly Private and Confidential 10 June 2015.
Retail and Consumer Roadmap to Retailing in the Digital Era Strictly Private and Confidential 17 June 2015.
European Real Estate Society Industry Seminar Tax efficient financing structures for real estate investments 19 October
Held in partnership with Creating Connections. Held in partnership with Creating Connections This document has been prepared for general guidance on matters.
“Jobs, What jobs?” Plenary CESI conference 24 April 2013 Dr Esmond Birnie, chief economist
Challenges for tax compliance 6 August
Atlanta meeting Getting it done for maternal and new born health PwC: A partner in development 20 January
2012 ICF Global Coaching Study The Business of Coaching: Fee and Revenue Drivers ICF Global Conference October2012
Held in partnership with Creating Connections. Held in partnership with Creating Connections This document has been prepared for general guidance on matters.
Alternative Service Delivery Models October
Value chain expansion to power sales growth Assessing new business in energy sector – how it works 7 September 2011 Ondřej Jež Vojtěch Opleštil Sanitized.
Economic Prospects for Eurasia – the Perspective of CEOs David Gray Chairman PwC Russia May, 2015.
Project Blue diciembre PwC Project Blue framework Project Blue 2 diciembre 2012 ADAPT PLAN Global instability Regulatory enviorenmentFiscal.
The Potential of Digital Simulations AICPA EdMax September
Anti-Money Laundering legislation and the effect on leasing companies Should leasing companies be exempt?
The State of the Economy September 18,
WSTIP Assessing Economic Funding Needs Strictly Private and Confidential Draft Result Update June 28, 2012 DISCUSSION PURPOSES ONLY.
Washington State Transit Insurance Pool Target Fund Balance Review Strictly Private and Confidential Final Report Presentation September 27, 2012.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
IFRS Seminar - Taiwan Looking into the future* 11 August 2010 *connectedthinking.
Mine 2011 The game has changed Jason Burkitt Mine Africa 26 September
An introduction to smart investment solutions: the case of PPP Twinning project Public Agency for Rail Transport of Republic Slovenia Daniel Loschacoff.
Engaged Investor Trustee Forum 21 May 2009 David Collinson Partner Pension Corporation.
Held in partnership with Creating Connections. Held in partnership with Creating Connections This document has been prepared for general guidance on matters.
Creating opportunities in tough times Budget
University of Rome Tor Vergata Dep. of Business, Government and Philosophy Studies Managing a consulting Team (and Project)… "Theory 2 Practice" Marco.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
GST implementation GST risk areas and the impact to process and procedures
Washington State Transit Insurance Pool June 30, 2012 Actuarial Review Strictly Private and Confidential Board Presentation September 27, 2012.
ICPAK – Annual Tax Conference Efficiency in tax collection: comparative analysis CPA Rajesh Shah Senior Tax Partner – PwC Kenya September
1. Attention is the behavioural and cognitive process of selectively concentrating on some information, while ignoring other perceivable information.
Implementation of BEPS – the Malaysian Scenario
PPP Solutions in Health Infrastructure – The Way Ahead 2 nd MENA Healthcare Infrastructure Investment & Finance Summit
PricewaterhouseCoopers LLP  South Tyneside Council Use of Resources - Value for Money 30 th July 2007.
Q Regional Scenario Analysis PwCAutomotiveInstitute RegionX Scenarios 2008 – 2015 (Millions) In our volatile marketplace, blind reliance upon a single-point.
PPA Sustainability Summit 2015 Demystifying the Paris Climate Summit 8 th October
ESD 101 Unemployment Insurance Pool Changing the Funding Mechanism from Banking to Pooling - Follow up Discussion Kevin Wick, FCAS, MAAA.
01 Autofacts 2011 Q1 Autofacts ® SWOT analysis Alliance Group ? 200? Q?
Recruiting International Students: The PwC Experience Charles Macleod PricewaterhouseCoopers LLP.
The power of analytics for better and faster decisions
Trends in Capital Adequacy
Turbulent times Budget Business School.
24 נובמבר 18 סוגיות מס עדכניות ואופיניות לקבוצת חברות בתחום הנדל"ן שאול בן אמוץ, שותף, ראש תחום נדל"ן,PwC Israel יוני, 2016.
UK Out of Home Revenue.
The Meaning of Paris - for business & for BP
Creating certainty Budget 2013 Business School.
UK Out of Home Revenue.
Gender and Equal Pay in the Private Sector
Последний шанс? Михаил Филинов.
Setting-up shop in the US – tax aspects
IETA conference in Lisbon, 17th of April
Presentation transcript:

Public Conference 16th December 2010 www.pwc.com High Speed Rail Norway Commercial, Contractual and Organizational issues Public Conference 16th December 2010

Work stream: Commercial and Contractual Strategies and Organizational aspects Outline of tasks Approach Interconnectivity between the work streams Preliminary considerations Commercial Contractual Organizational Purpose of the presentation: Inform the public domain about what the work stream covers (provide comfort about the end result and progress) Take the edge of potential prejudice about particular types of organization and funding Manage the clients’ expectations Argue important elements of Phase III High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Outline of tasks Commercial Strategy How the procuring Authority might limit and manage the cost of building and operating HSR in Norway ? How to get best value for money from the procurement? Contractual Strategy The key issues to be addressed in delivering successfully HSR in Norway including the allocation of responsibilities and risk Organizational issues How to structure the organization in order to implement the commercial and contractual strategies and achieve a successful delivery of HSR In the Interdependency section we aim to explain how the commercial and contractual strategies and the way you structure the organization is interconnected. The bullets listed under each of the issues are meant to give an indication of what are important aspects for each of them. What we consider important is to explain that how you allocate risks and how you structure incentives are important considerations for which contract strategy you wish to use, either if one contract is awarded for example signals, where as for tunnelling you award different contracts for different tunnels and how you price and package all this. This should again reflect how you build your organization. Definitions Commercial: this is principally about how the Norwegian Authorities might limit and manage the costs of building and operating HSR in Norway. There are two key aspects to this (i) to what extent can the successful operation of services contribute to the cost of building the railway; and (ii) how to get contractors to offer and honour solutions that represent good value for money. Contractual: this is about the contractual issues that need to be addressed in delivering HSR in Norway. Such issues will range from what activities are contracted together through the allocation of risk between the public sector and contractors to how contracts are priced. Organisation: this is about defining the advantages and disadvantages of different structures that might be used to develop and procure HSR in Norway. High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Approach Key drivers of approach Consider all realistic alternatives at a generic level Describe the pros and cons of options, no recommendations in this phase of work Key activities Review of previously prepared material Leverage experience Develop lessons from case studies Preliminary market sounding Understanding key risks Recognise dependencies on other workstreams Phase 2 limitations We are to describe the advantages/disadvantages of all possible alternatives, and not recommend any. This means that we are not going down to every little detail in the alternatives at this stage. Generic descriptions of the different sub elements for each subject with applicability and key considerations High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Interconnectivity between the workstreams Market The Commercial, contractual and organizational solutions chosen should deliver the key requirements defined by the other workstreams. The tailored solutions will impact the business case for each project Technical Rail planning Economic Environmental The commercial work stream feeds back to Economic, since our work stream considers how costs of building and operating HSR could be limited and managed by NRA. There are two key aspects to this (i) to what extent can the successful operation of services contribute to the cost of building the railway; and (ii) how to get contractors to offer and honour solutions that represent good value for money. Commercial, contractual and organizational High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Commercial Strategy – preliminary considerations Life Cycle Cost considerations How to avoid a cheap build that requires extensive maintenance? How to encourage contractors to look at cost implications for the whole system of their solution? (TransPennine Express) Risk identification and allocation What are the key risks? (Planning, land purchase, tunnelling conditions) How much risk could be allocated to contractor? (Size of project, risk premia, risk of no bid) How to deal with interface issues? (Rail-wheel, tunnelling with civils) Achieving cost certainty (West Coast Mainline, Gardermobanen) Potential for funding through operating profit (Taiwan experience of increasing State support) Conventional wisdom is that if one does not evaluate whole life costs this incentivises bidders to bid the cheapest infrastructure cost possible regardless of the maintenance consequences. If this happens it can result in the costs of building and maintaining such infrastructure being higher than infrastructure with a higher build cost but lower maintenance cost. Consequently it is desirable to create a situation where bidders are incentivised to optimise overall costs. A second issue is that if a bidder is not going to be required to maintain the infrastructure he builds he may underestimate the maintenance costs in order to put in a winning bid. Risk allocation It is important in any procurement in order to deliver good value for money to allocate risk to the party best able to manage that risk. In the case of high speed rail infrastructure the party best able to manage the risk may not be able to bear the cost of managing the risk. As a result issues such as capping will need to be addressed High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Contractual Strategy – preliminary considerations Packaging - criteria and considerations Reducing interface risk whilst being able to procure the “best” for each activity (Signalling systems may constrain choice of rolling stock) Interfaces With the existing network (Specification, access to build and maintain, timetables) Outside the HSR programme organization (Roads Authority, City Authorities, Power) Nature of contracts Traditional approach has been one of input specification (Minimises interface risk) More recent trend is towards output (what the asset/service should deliver) or outcomes (the impact of those outputs) Charging What revenues will the infrastructure generate? How determined/ controlled? (Setting of fares and access charges) Pricing This is really about whether we want prices for each element of construction of complete solutions eg: do you get prices for P-way, signalling, track and structures between A and B or do you just get a price for an operating railway between A and B. This may or may not be linked to whether you are adopting a package approach. High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Organisational – preliminary considerations (1) Roles to be fulfilled for project delivery: Who should be the Procuring Authority ? (Independent Authority has overseen successful introduction of HSR in Spain) How much of the work should the Procuring Authority do? (CrossRail engaging delivery organisations) How much interface risk should the Procuring Authority allow and manage? (Japanese approach – all work together to resolve) Government Set policy Procuring Authority Define specification Government Delivery Co Manage delivery Contractor/ Consortium Build/operate infrastructure Train Operator Operate services Rolling stock contractor Build/Maintain stock High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Organisation – preliminary considerations (2) Example organization structure Government Procuring Authority DeliveryCo (Govt owned) Regulator Passengers Customer revenue Build contract (including milestone payments) Maintenance and operations contract Operating contract Transfer of assets and liabilities at construction completion Debt Finance Equity InfraBuildCo InfraCo HSR Operator Track access charges Possibly PPP-type contract (including milestone payments Construction subcontract Construction subcontract Maintenance subcontract Signalling and Operation subcontract VehicleCo Rolling stock (manufacturer and maintenance Example from GrennGauge 21- Funding report Generic example of a project to illustrate the considerations regarding the different work streams and cash flows Procuring entity – large or small depending on structure of the procurement, government agency or dedicated project organisation depending on need for coordination, flexibility etc. Project Delivery Co – central/local, limited company/govermental entity, big/small, private/public, Infrastructure development Infrastructure maintenance Rolling stock provider Rolling stock maintainer HSR operator How will this vary with the different Scenarios: Scenario D – separate, fewer interfaces, larger potential for efficiency in whole system, whole life planning – larger packages Scenario C – smaller and more diversified elements of construction , more need for flexibility and coordination. Contractual and payment arrangement Financing cashflow Shareholding Debt Finance Equity High Speed Rail Norway Commercial, Contractual and organizational issues 16 December 2010

Thank you This publication has been prepared for general guidance on matters of interest only, and does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice. No republication or warranty (express or implied) is given as to the accuracy or completeness of the information contained in this publication, and, to the extent permitted by law, PricewaterhouseCoopers LLP, its members, employees and agents do not accept or assume any liability, responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act, in reliance on the information contained in this publication or for any decision based on it. © 2010 PricewaterhouseCoopers LLP. All rights reserved. 'PricewaterhouseCoopers' refers to PricewaterhouseCoopers LLP (a limited liability partnership in the United Kingdom) or, as the context requires, the PricewaterhouseCoopers global network or other member firms of the network, each of which is a separate and independent legal entity.