Closing breaches in earthen flood defences Technical feasibility of emergency closure concept.

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

DS-01 Disaster Risk Reduction and Early Warning Definition
RISK MANAGEMENT AND ASSESSMENTS OF NATURAL HAZARDS Ron Conner Corps of Engineers.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
May 2002 LTV & VNK Managing the Safety of Flood Defences in the Netherlands Fola Ogunyoye Presented on Friday 17th May 2002 at the IMPACT Project Workshop,
USSD Committee on Monitoring of Dams and Their Foundations
Schiffer- Berufskolleg RHEIN © Wie/Pau Simulators – a tool for practical training and specialization courses 1 Dipl.-Ing. Klaus Paulus & Dipl.-Ing.
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
WIDESPREAD FLOODING IN NEW JERSEY AS LOCAL RIVERS OVERFLOW AFTER SPRING STORMS PASSAIGE, SADDLE, RAMAPO, POMPTON RIVER SYSTEMS OVERFLOW BANKS MARCH 7-13;
“Floods - Past and Present Issues” Address given to The Royal Scottish Society of Arts 11th February 2002 Edinburgh by Professor George Fleming FREng FRSE.
WFM 6202: Remote Sensing and GIS in Water Management Course Project on Developing and updating empirical methods for predicting morphological changes of.
Quantitative Methods for Flood Risk Management P.H.A.J.M. van Gelder $ $ Faculty of Civil Engineering and Geosciences, Delft University of Technology THE.
Session 131 Hazard Mapping and Modeling Supporting Emergency Response Operations using GIS and Modeling.
Toronto, May 6-8, 2008Flood Defence1 Risk assessment in trans-boundary cooperation between the Netherlands and Germany Jan Stijnen.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Data-assimilation in flood forecasting for the river Rhine between Andernach and Düsseldorf COR-JAN VERMEULEN.
1 Futureproof design of flood defences A wide approach… ISFD 2008 – Toronto W.L.A. ter Horst – INFRAM / Delft University of Technology Dr. P. Bernardini.
ECLAC Disaster Assessment ECLAC Disaster Assessment Training Manual Section V (ii) Coastal Engineering: Reconstruction – Management and Mitigation.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
Ministry of Land, Infrastructure, Transport and Tourism Risk based Flood Management for adapting to Climate Change March 17, 2009 Toshio OKAZUMI Director.
POTENTIAL DISASTERS AS A RESULT OF CLIMATE CHANGE - AND HOW TO PREVENT THEM Jan Coppes FIDIC, 4-8 September, Beijing.
Flood risk assessment Arjen Markus Deltares (previous name: WL | delft hydraulics)
BREACH FORMATION A Review of State-of-the-Art Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 16/17 May 2002.
FLOODS A. Ramdial. INTRODUCTION Floods are a natural river process in response to changes in drainage basin inputs (precipitation / melt-water runoff)
NO TIME TO WASTE STATES IN THE MISSISSIPPI RIVER’S PATH TO ITS DELTA REGION HAVE ABOUT 2 WEEKS TO AVERT FLOOD AND HEALTH CARE DISASTERS Walter Hays, Global.
REDUCING DISASTER RISK THROUGH EFFECTIVE USE OF EARTH OBSERVATIONS Helen M. Wood Chair, U.S. Subcommittee on Disaster Reduction August.
King Fahd University of Petroleum & Minerals
Flood Risk Management in Hat Yai, Thailand
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Opening of the Panama Canal in 2016 Its Anticipated Impact on Global Soy and Grain Transportation Ken Eriksen Senior Vice September.
RS/GIS Techniques for Rehabilitation /Reconstruction.
Flood risk assessment Arjen Markus Deltares (previous name: WL | delft hydraulics)
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
IMPACT-ADD proposal 1 st IMPACT Workshop HR Wallingford, UK th May 2002 Investigation of Extreme Flood Processes and Uncertainty - Additional Partners.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
FLOODPLAIN MANAGEMENT AND THE U.S. ARMY CORPS OF ENGINEERS Paul Bourget Directorate of Research and Development Headquarters, U.S. Army Corps of Engineers.
DAM BREAK RISK IN COLOMBIA A Geospatial Assessment of Population Vulnerability from Flood Inundation Eugene Derner, GEOG 594a Spring 2014.
A stream is a body of water that carries rock particles and dissolved ions and flows down slope along a clearly defined path, called a channel. Thus, streams.
Introduction to Hazards Risk Management
Mangrove rehabilitation Weg naar Zee with sediment trapping technique
EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.
AQUACULTURE FACILITIES [objectives]
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
IMPACT 13 May Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme Flood Processes and Uncertainty.
TGYDGL09 Project DEPLOYABLE RAPID DIAGNOSTIC LABORATORY MOBIOCHEM Ltd.
International Levee Handbook Overview of the handbook Chapter 6 – Emergency Management and Operations.
Flood damage models – Scope and limitations
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
Design of Automated Local Flood Warning Systems By: M. J. Abedini and P. Karimaghaei.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
MODELING FOR THE CASE STUDY OF THE MEUSE IN LIMBURG.
What has turned what was once a disaster into a catastrophe?
DISASTER MANAGEMENT.
Arjen Markus Deltares (previous name: WL | delft hydraulics)
HELCOM objectives in shipping field
COMMISSION FOR HYDROLOGY (CHy)
Flooding Walkdown Guidance
B.V.Patel Institute of Technology-Diploma studies
Overview of Climate Resilience in Transportation Planning October, 2017 Savannah, GA Jill Stark, FHWA, Office of Planning.
GANDHINAGAR INSTITUTE OF TECHNOLOGY
Lesson Seven: Flood Works Monitoring
PAPER 3: Geographical Applications
Can floodplain lowering help to mitigate river bed erosion?
Presentation transcript:

Closing breaches in earthen flood defences Technical feasibility of emergency closure concept

Closing breaches in earthen flood defences Technical feasibility of emergency closure concept 4th International Symposium on Flood Defence 2008 K.A.J. van Gerven, G.J Akkerman and S.N. Jonkman Royal Haskoning Architects and Consulting Engineers, Netherlands A.D. Pool Delft University of Technology, Netherlands

Why is research on disaster mitigation needed?  Increasing flood risk (climate change and increasing population pressure).  The risk of dike breaches cannot be eliminated completely.  Knowledge about the effect of embankment construction and materials on breach growth is not sufficient.

INTRODUCTION Contents of the presentation n Scope of the research n Time frame between initial damage and emergency closure n Applicability of water based measures in the Rhine river branches n Review of feasible principles of initial repair and emergency closure n Conclusions and recommendations Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels

SCOPE OF THE RESEARCH Demonstration of the technical feasibility of water based equipment for early repair and emergency closure of a breach Early deployment of water-based assistance at precursor events that may lead to a breach Deployment of a stone dumping vessel as an effective means for emergency closure in large rivers Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels chaotic land based closure operations vain sand bag dumping operations

Issues with land based techniques

TIME FRAME River dike failure: Different working conditions compared to coastal defences Proper identification of precursor events that may lead to initial breaching Development of real-time monitoring (Flood Control 2015) remote sensing techniques for dike surveillance sensor networks for dike status monitoring Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels

TIME FRAME Breaching: breaching process is quite well-understood after initial breaching. understanding and modelling of extreme floods has advanced. the time-development of the initial events leading to breaching is less well-documented because of: - late discovery of precursor events - stochastic nature of initial breaching process. - large variation of erodibility of the dike materials - Influence of burrowing animals and other ‘disturbances’ (e.g. fences, roads) - large differences in weathering of the dike materials Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels

TIME FRAME Breach width growth; high foreland with low resistance against erosion (Visser, 1998) Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels

TIME FRAME Breaching predictions of initial and ongoing stages: Initial stages: 2 hours (assumption) Ongoing stages (observations and computations) - Clay dikes: 20 m in 2 hours - Sand dikes: 40 m in 2 hours In 4 hours time, a wide gap may have developed Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels

ACCESSIBILITY OF DIKE SECTION Case study: the largest Dutch Rhine river branch, the Waal River Conditions: - design water levels (1/1250 years) - moderate flood water levels (1/100 years) Flood plain accessibility: - predicted water level data from the Dutch Rhine flow model (WAQUA) - flood plain terrain data (from the Public Works Department) - draught of some typical inland crane vessels and split barges Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels

ACCESSIBILITY OF DIKE SECTION Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels Local water depth Waal river and flood plains near Tiel for design water level (A) and moderate flood water level (B). The arrows indicate possible navigation tracks to all dike sections in the area.

APPLICABILITY OF VESSELS Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels Inland vessels - equipped with a crane and spud poles for anchoring - typical loading capacity of these vessels is tons - a maximum unloading capacity of 300 tons per hour - fully unloading in 2 hours

APPLICABILITY OF VESSELS Purpose inland vessels: n early repair work n reduction of the water influx, might a breach being inevitable - small dams may be erected along the bow and the stern - such dams require some 300 m³ (520 tons) of stone or big bags each - this will take 3.5 hours to carry out, but with more cranes it can be done faster Assistance by other vessels, such as a crane pontoon for extra unloading capacity, small motor barges for assistance and stone barges that supply additional closure materials

APPLICABILITY OF VESSELS Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels Deployment of stone dumping barges as a last resort Prerequisite for this operation: - the scour hole has not yet progressed upstream - keel clearance is within some decimeters, so the vessel gets stuck on the dumped stone dam upon dumping process

APPLICABILITY OF VESSELS Realization: - Route mapping for fast navigation - Spilling the right amount of stone to adjust to the desired draught - Upon dumping, the ship gets stuck at its pile of dumped stones - Assistance of pontoons for final closure

NEW TECHNIQUE?

CONCLUSIONS & RECOMMENDATIONS Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels Major conclusions - Water-based repair measures are a feasible option as an alternative to land bases techniques (and may even be preferred) - Good accessibility of water based equipment under extreme and moderate flood levels using modern techniques - Inland vessels equipped with a crane and spud poles are suitable for early repair works and reduction of discharge, when breaching continues - Building up sealing dams between the vessel and the dike might be designated as successful - A backup option is the positioning of a split-barge at the upstream side of the (potential) breach; this may give a final resort for closure if a breach is inevitable

CONCLUSIONS & RECOMMENDATIONS Conclusions Accessibility dike section Time frame Scope of the research Introduction Applicability of vessels Recommendations Further assessment of the operational and cost aspects involved for the case study conditions Flood managers to react on the operational and cost aspects for this type of back-up measures Assessment of the feasibility for more dedicated equipment abroad where flooding has a much higher frequency than in the Netherlands

Questions?