1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.

Slides:



Advertisements
Similar presentations
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Advertisements

The State Trading Corporation was created by an Act of Parliament in 1982 State Trading Corporation NOT AN OFFICIAL UNCTAD RECORD.
Futures markets. Forward - an agreement calling for a future delivery of an asset at an agreed-upon price Futures - similar to forward but feature formalized.
Panel Discussion on Corporate Volunteerism Closing Plenary, June 25, 2003 Nick Keener, CCM Director, Meteorology 2009 Summer AMS Community Meeting Aug.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
2004/05 Winter Energy Market Assessment November 18, 2004 Federal Energy Regulatory Commission Office of Market Oversight and Investigations Disclaimer:
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Understanding Ontario’s Electricity System
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Energy Markets 201 Tribal Solar Working Group April 30, 2015.
Optimized Flood Control in the Columbia River Basin for a Global Warming Scenario 1Dept. of Civil and Env. Engineering, UW 2CSES Climate Impacts Group,
Seasonal Volume Forecasts Using Ensemble Streamflow Prediction for the 2006 Water Year Steve King, Hydrologist Northwest River Forecast Center.
Gent Summer School: Electricity Markets & Trading Gregory Michiels 27 August 2013.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Federal Columbia River Power System Operations Planning.
COLUMBIA RIVER SYSTEM OVERVIEW
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
FOR INSTITUTIONAL USE ONLY NOT FOR PUBLIC DISTRIBUTION An introduction to the capital markets J.P. Morgan Investment Academy.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Introduction to Bonneville Power Administration
21 Risk Management ©2006 Thomson/South-Western. 2 Introduction This chapter describes the various motives that companies have to manage firm-specific.
Regulatory Responses to Natural Gas Price Volatility Commissioner Donald L. Mason, Esq. Vice-Chairman of NARUC Gas Committee Vice Chairman or the IOGCC.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Energy Markets 101 Tribal Solar Working Group March 24, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
MAY 17, 2001 ENERGY MARKETS IN TURMOIL PRESENTED TO THE INSTITUTE FOR REGULATORY POLICY STUDIES
Power Stations Introduction. References  S. W. Blume: Electric Power System Basics  F. Janíček et al.: Renewable Energy Sources.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
Looking at Impacts of Climate Change on Seattle City Light Lynn Best, Director Environmental Affairs.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
1 The Sustainability Network of Washington County January 27, 2010 Jason Eisdorfer Bonneville Power Administration.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
2015 New Hampshire Energy Summit 5 October 2015 Robert Scott, Commissioner, New Hampshire Public Utilities Commission.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Climate Change and Seattle City Light Operations Wing Cheng and Ron Tressler Seattle City Light September 16, 2009.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Slide 1 FEDERAL ENVIRONMENTAL SYMPOSIUM (West) – 6/3/09 Implementing Energy Efficiency in Remote.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
Water Quality Modeling of the Lower Columbia and Snake River During the 2001 Drought U.S. Army Corps of Engineers, Northwestern Division.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Assoc. Prof. Dr. Tarkan Erdik
Albeni Falls Dam Operations
Uncertainty in forecasts
Long-Lead Streamflow Forecast for the Columbia River Basin for
GENESYS Current Functionality
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Presentation transcript:

1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES WITH A FOCUS ON WATER SUPPLY

2 Introduction to the Federal Columbia River Power System and the Bonneville Power Administration

3 Federal Columbia River Power System ► The key federal agencies:  The US Army Corps of Engineers  The Bureau of Reclamation  The Bonneville Power Administration ► The major physical assets:  31 federal hydro-electric power plants  Columbia Generating Station (Nuclear Power Plant)  The federal high voltage transmission system

4 Federal Columbia River Power System ► The US Army Corps of Engineers and the Bureau of Reclamation operate the federal dams for multiple public purposes:  Flood Control  Navigation  Fish protection operations (Endangered Species Act, Clean Water Act)  Recreation  Power production ► BPA’s Role  Markets the power produced from the federal dams within the constraints and requirements for other river purposes  Primary high-voltage transmission provider in the Columbia River Basin

5 Federal Columbia River Power System

6

7 FCRPS Annual Operations Cycle ► July – August: Draft the system to augment flows supporting the downstream migration of juvenile fish. ► September – October: Operate the system to prepare for Fall fisheries operations at Lake Roosevelt, Vernita Bar, and downstream of Bonneville. ► November – December: Provide hydraulic conditions for Chum, Fall Chinook, and Kokanee spawning. Meet Winter flood control requirements at Libby and Dworshak. ► January – April: Draft the system for flood control while supporting protection elevations for Chum and Fall Chinook. ► May – June: Refill the system on the Spring freshet.

8 BPA’s Modeling Process Realizing Uncertainty in Generation and Energy Inventory

9 BPA’s Generation Modeling System ► HYDSIM – A hydraulic simulation model that provides the underlying flow and elevation targets for HOSS, the higher resolution generation shaping model ► HOSS – An hourly operations and scheduling simulator that takes the output from HYDSIM and provides hourly generation shaping for the hydro projects

10 BPA’s Generation Modeling System ► Inputs:  Hydraulic objectives  Project constraints  Streamflow scenarios  Hydro unit availabilities  Load obligations ► Outputs  Generation distributions

11 Hydraulic Objectives and Project Constraints ► Hydraulic objectives:  Flood control  Fisheries operations  Navigation requirements  Recreational interests  Special operations ► Project constraints  Physical plant characteristics

12 Ensemble Streamflow Prediction ► Ensemble of traces initiated with current basin conditions  Soil moisture  Snowpack ► Perturbed with historical meteorological sequences ► Generates a distribution of possible future streamflow scenarios

13 Ensemble Streamflow Prediction

14 Realizing Uncertainty in Electricity Generation ► Given the large amount of uncertainty in streamflows there is often a large range of possible hydro generation ► The following example shows the possible combined lower Snake River generation ranging from as low as 500 aMW to as much as 2,600 aMW in June

15 Generation Distributions

16 Uncertainty Diminishes Over Time

17 BPA’s Energy Inventory Modeling System ► Inputs:  Hydro generation distributions  Thermal generation distributions  Load obligation distributions ► Outputs  Energy inventory distributions

18 Energy Inventory Distributions

19 Realizing Uncertainty in Energy Inventory ► Given the large amount of uncertainty in all of the modeling inputs, especially streamflows, there is often a large range of possible energy inventory for any given future time period ► In the previous example:  -800 aMW < Month A Inventory < 4,000 aMW  -3,000 aMW < Month B Inventory < 2,800 aMW  -4,000 aMW < Month C Inventory < 1,300 aMW

20 Using the Marketplace Managing Uncertainty in Energy Inventory and Power Marketing Revenue

21 The West Power Market ► Electricity is a commodity ► Electricity markets, like other markets, are influenced primarily by supply and demand ► To understand electricity markets one must understand where generation comes from (supply), how much electricity is needed (demand), and how does the electricity get from the generator to the customer (transmission).

22 The West Power Market The Western Interconnection

23 The West Power Market The Western Interconnection

24 The West Power Market How is electricity generated? ► Thermal Power Plants  Coal  Natural Gas  Nuclear  Biomass ► Hydro Power ► Wind Power

25 The West Power Market How is electricity consumed? ► Residential customers (e.g. light bulbs and toaster ovens) ► Commercial sector (e.g. businesses) ► Industrial sector (e.g. manufacturing, metal smelting)

26 The West Power Market Who trades power in the West? ► Utilities ► Power marketers ► Investment banks ► Oil companies ► Hedge funds

27 The West Power Market What are the products? ► Physical power  Yearly strips  Quarterly pieces  Monthly pieces  Balance of month pieces  Daily and hourly products ► Future options to buy or sell power

28 The West Power Market How are the various products traded? ► The Intercontinental Exchange (ICE), an anonymous electronic trading platform that works something like eBay. Traders are able to submit and strike, bids and offers ► SIBR for the California ISO (similar to ICE) ► Brokers, a third party that arranges transactions for a commission ► Old fashioned phone calls between buyers and sellers

29 Probability Management and Hedging Risk Given large amount of uncertainty in future inventory, what risks must be realized and managed? ► Market liquidity: It is unknown how much depth will exist in the balance of month, daily, and hourly markets ► Price volatility: Considering the uncertainty in natural gas prices, thermal unit outages, hydro generation, available transmission, and regional demand for electricity, future power prices are difficult to predict

30 Probability Management and Hedging Risk

31 Probability Management and Hedging Risk

32 Probability Management and Hedging Risk There is a tremendous amount of uncertainty in the power business ► Streamflows, water supply, and hydro generation ► Weather and temperature departures ► Thermal generation and thermal unit outages ► Available transmission and system congestion ► Demand for energy ► Coal, natural gas, and electricity prices ► Market liquidity

33 Probability Management and Hedging Risk How is all of that uncertainty managed? ► Identify the risks ► Understand the tolerance for risk ► Use the marketplace to manage the tail ends of the inventory distributions by:  Forward marketing to reduce the exposure to price volatility and market liquidity issues  Trading options for the purchase and sale of electricity