The 3rd UN World Conference on Disaster Risk Reduction ~ Message from Sendai, Tohoku ともに、前へ 仙台 Moving Forward As One SENDAI UN World Conference on Disaster.

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

Workshop on National Platforms 23 – 29 August 2008, Davos Switzerland Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation.
CONSULTATION DAY EVENT - 20 May 2013 Scientific and Technical Platforms / Networks: Achievements and future goals CICG, Geneva Proposing the IRIDeS as.
Handbook for Local Government Leaders LAUNCH 14 May 2012 Bonn.
Governance of Disaster Reduction Priorities and Organizational Arrangement for the Implementation of HFA Martin Owor Assistant Commissioner Head of Disaster.
Date: 14 th – 16 th, January, 2015 Venue: Ito Hall, the University of Tokyo, Tokyo, JAPAN.
Promoting Disaster Reduction through Multi-National Cooperation in Asia region ADRC’s Activities 12 Oct Asian Disaster Reduction Center (ADRC)
Part III Solid Waste Engineering
NADAFA Program Forum Quarterly Meeting, Abu Dhabi Sustainability Group
The Day After The Shakeout Place your Counties Logo Here MT DES Exercises.
Kiyoshi Harada, Japan Disability Forum (JDF) Japan Disability Forum.
LESSONS LEARNED FROM PAST NOTABLE DISASTERS JAPAN PART 1A: EARTHQUAKES Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
Background to the WCDRR
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
INTERNATIONAL DAY OF PERSONS WITH DISABILITIES 2014 Inclusion Saves Lives.
Second Sudan Consortium March 2007 Water Supply and Sanitation Service Delivery and Challenges in Southern Sudan Ministry of Cooperatives and Rural Development.
2011 Tohoku earthquake and tsunami (Japan) 11 th March 2011.
Reducing and recovering your waste: a winning strategy for SMEs and Industrial Areas Presentation of White Paper « Sustainable waste management best practice.
Einstitute.worldbank.org The Great East Japan earthquake and tsunami Lessons learnt and recommendations for developing countries January, | 10:00.
State Debris Management Plan California the “Disney Land of Disasters”
Earthquakes and Schools The Importance of Damage Prevention and Earthquake Education in Schools By Stephanie Perkins.
WRC 2 World Reconstruction Conference 2 Resilient Recovery- an imperative for sustainable development Conference Objective To advance consensus on resilient.
Coastal Community Resilience Elements Governance, Risk Knowledge, Land Use Management and Structural Design, and Coastal Resource Management Russell Jackson.
Texas Department of Public Safety Division of Emergency Management Debris Management Overview.
Miami Dade Resources Recovery Facility Operated By: Montenay Power Corporation.
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
Disaster Reconstruction in Japan: Lessons Learned from the Kobe Earthquake Asian Disaster Reduction Center Senior Researcher Senior Researcher Etsuko Tsunozaki.
Policy Actions on Environmental Education in Japan November 28, 2013 Ministry of the Environment Japan.
CHAPTER 2 LIVING WITH TECTONIC HAZARDS Risk or Opportunity?
Prediction and prevention of the effects of volcanic eruptions and earthquakes By forecasting, the design of buildings and defences, planning and.
Information circulation and sharing platform common API ○ The MIC publishes (including limited publishing to parties involved) disaster prevention and.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Re-use, recyling and future of demolished buildings.
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
4-7 June 2006NATO-CCMS Pilot Study, Athens Contaminated Land in Greece Recent Developments Nymphodora Papassiopi NATO-CCMS Pilot Study Tour de Table -
1 Hyogo Framework for Action 2005 – 2015 “Building the resilience of nations and communities to disasters” ASEAN REGIONAL FORUM The 8 th.
Building Capacity for Disaster Management & Enhancing Resilience Leadership for Results Program for Mid-Level Officers in the Nepalese Civil Service Dr.
Sendai Framework for Disaster Risk Reduction
HFA Progress Monitoring and 10 Year Review ISDR Asia Partnership (IAP) Meeting Bangkok, April 2014.
Urban Planning for Safer Cities Jibgar Joshi. Principles Urban Planning for Safer Cities should consider the risks and threats due to probable natural.
Ministry of Construction & Housing Course / Urban Development & Management.
Expert Meeting November 2007, WMO Geneva Consultation Process Involving Governments and Agencies prior to Adaption of HFA Keynote Presentation Marco.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
Developing Plans and Procedures
Making Historic Cities Resilient Jerry Velasquez Chief of Section, Advocacy and Outreach.
Mario C. Flores Director, Disaster Response Field Operations Habitat for Humanity International Shelter Meeting 10b Palais des Nations, Geneva 2-3 December.
Global Assessment Report and need for Regional Assessment Report Meeting of the ISDR Asia Partnership, September September 2011 Pattaya, Thailand.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
Yuki Matsuoka The United Nations International Strategy for Disaster Risk Reduction th CEOS Plenary 5 November 2015.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
1 Earthquake Response Cooperation Program for Energy Infrastructure in the APEC Region Chinese Taipei October 2000 APEC EWG 20.
Tōhoku Earthquake Japan 11 th March Population and Economy 126,475,664 (July 2011 est.) 10th Largest Population Source: (World Factbook) The economy.
A BRIGHT SPOT AFTER A YEAR OF BAD NEWS FOLLOWING JAPAN’S MARCH 11, 2011 CATASTROPHE February 2, 2012 Walter Hays, Global Alliance for Disaster Reduction,
MAGNITUDE 6.7 EARTHQUAKE STRIKES CENTRAL JAPAN Saturday, November 22, 2014 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
Local Government Services and Revenue Chapter 12 Section 2.
TOWARDS A NEW KOBE TWENTY YEARS AFTER THE JANUARY 17, 1995 EARTHQUAKE DISASTER Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
Assisting African countries to improve compilation of basic economic statistics: an outline of the UNSD strategy Vladimir Markhonko United Nations Statistics.
The material flow and indicators toward a sound material cycle society in Japan Keiko Omori Research Center for Advanced Policy Studies Institute of Economic.
Earthquakes in Rich Countries
Sustainable Development, Resilience & Risk Management
A Presentation to the 2017 GEO Work Programme Symposium,
Addressing Resource Efficiency and Climate Change
DISASTER MANAGEMENT.
Sendai Framework for Disaster Risk Reduction
School Safety in the Post-2015 Framework on Disaster Risk Reduction Toward Sendai and Beyond
Intermediary Cities Middle East and West Asia (MEWA) Regional Forum September 2017 Nevşehir/Turkey Nuha Eltinay - Arab Urban Development Institute.
The Islamic University of Gaza- Higher Studies Deanery
COMPREHENSIVE SCHOOL SAFETY MONITORING TOOL
A SNAPSHOT OF THE SITUATION ASSESSMENT IN JAPAN ON DAY 4
COMPREHENSIVE SCHOOL SAFETY MONITORING TOOL
Presentation transcript:

The 3rd UN World Conference on Disaster Risk Reduction ~ Message from Sendai, Tohoku ともに、前へ 仙台 Moving Forward As One SENDAI UN World Conference on Disaster Risk Reduction Local Preparation Office of the 3rd UN World Conference on Disaster Risk Reduction, Sendai City Kazuyuki Numata (Section Chief of Preparation)

1 The 3rd UN World Conference on Disaster Risk Reduction

3 ・ Organizer: United Nations ・ Objectives: To review the progress of the Hyogo Framework for Action (HFA), to further implement the HFA, and to develop the next strategy. All UN member states, international organizations, and NGOs will participate! 193 countries and regions, over 5000 participants (Main conference) ※ 2005 Conference in Kobe City Video Message Outline of the Conference

Sendai Hyogo Yokohama Great Hanshin- Awaji Earthquake 2011 Great East Japan Earthquake The international community has expectations for the experience and knowledge of Japan and Sendai regarding disasters and DRR. It is the area we can demonstrate our presence and leadership! 4 All 3 conferences held in Japan ・ Know-how on disaster risk reduction that we learned and improved from many disaster experiences ・ World’s only city with a population of 1million that has experienced M9.0 earthquake ・ Action of evacuation decided their fate. What is the lessons-learnt from the experience that can disseminate to the world? Expectations Towards Japan and Sendai

Main Conference Related Events Welcoming Events Inter-governmental meetings various meetings General Forum Symposium and Seminar for Citizens Exhibition SAT ★ Welcoming Reception SUN Welcoming Decorations Japanese Cultural Experience Program for Spouses ★ Excursion Information Center, Hospitality ★ Opening Ceremony Official visit ★ Closing Ceremony MON TUE WED THU UN Schedule

2 Importance of investing continuously in Disaster Risk Reduction

Miyagi-ken-oki Earthquake ( 1978 ) Completely destroyed 4,385 Partially destroyed 86,010 Deaths 16 Destroyed brick walls etc. 11,740 Injuries 10, Major amendment in Building Standard Law regarding earthquake resistance standard Damage Collapsed building ・ Anti-seismic enforcement of buildings built before amendment of building standard law ・ Lifeline with anti-seismic structure and its multiplexing ・ Removal of brick walls with high risk of collapsing ・ Improve DRR education and drills ・ Wider collaboration with other cities ・ Anti-seismic enforcement of buildings built before amendment of building standard law ・ Lifeline with anti-seismic structure and its multiplexing ・ Removal of brick walls with high risk of collapsing ・ Improve DRR education and drills ・ Wider collaboration with other cities Major disaster reduction policies in Sendai ( 1978 ~) Major disaster reduction policies in Sendai ( 1978 ~) Destroyed brick walls Drill in kindergarten June 12, :14pm Magnitude 7.4 Time Scale

Importance of anti-seismic structure In the Great Hanshin-Awaji Earthquake, 80% of the deaths were caused by building collapse. About 70% of the buildings constructed under the old standard ( before 1981) were heavily damaged! Source: Interim report by the survey committee of the building disaster by the Great Hanshin-Awaji Earthquake Building and Disaster, 1995 Cause of Casualties Police White Paper, Fiscal 1995 Under the amendment of the Building Standard Law in 2000, further reinforcement of the earthquake resistant standard of wood-frame buildings was made. For example, it became necessary to have a basic structure/foundation according to the resistance of land. Regulation on balance of arrangement for earthquake-proof walls was developed. It is highly important for buildings to be earthquake-proof Heavy Damage Moderate DamageNo/Slight Damage Before 1981 Old Standard From 1982 New Standard Heavy/Moderate Damage No/Slight Damage Being burned Others Being crushed

Commitments by Sendai City on earthquake proof retrofit ( Under Old Standard ) ・ City’s elementary, junior and senior high schools, special schools for the handicapped, etc. ( 1,119 in total ) were 100 % earthquake-proof before the Great East Japan Earthquake and Tsunami. ・ There were no injuries among students due to building collapse by the 2011 disaster. ・ As well as to protect children’s lives, earthquake resistant structure for schools is important to enable schools to function as evacuation center. ・ Earthquake resistance surveys for non-school buildings owned by the city were also conducted. ・ If the building did not meet the new earthquake resistant standard, the city decided either to carry out retrofit work, reconstruct, or shutdown the property. ・ There were no cases of termination of administrative functions due to building collapse of city-owned buildings by the 2011 disaster. City-owned Buildings Subsidies for earthquake resistance survey: Wood-framed houses and apartments, condominiums Subsidies for earthquake-proof retrofit: Wood-framed houses and apartments Private Buildings An elementary school that went under additional earthquake-proof work

DRR measures were implemented to some extent, based on the lessons learned from the Miyagi- ken-oki Earthquake (1978). Investment in developing disaster-proof urban infrastructure can be highly effective and valuable. 10 Polyethylene gas pipes had no damages Water supply recovered in 18 days Gas Waterworks Enforcement of urban infrastructure beforehand was the key to success. ・ Service to 310,000 households was stopped. Recovered completely 37 days after the disaster ・ No damages to polyethylene gas pipes, highly resistant to earthquakes ・ Water supply: service to 23,000 households was stopped. Recovered in 18 days ・ Sewerage: No damages to earthquake resistant facilities (Huge damage by the tsunami) Brick walls ・ Subsidies for removal and switching to hedges ・ No casualties due to destroyed brick walls. There are still many remaining, a future issue. Enforcement of Urban Infrastructure

233 Importance of preparation for response procedures under emergencies including needs assessment

Dec Removal was completed. Sep Incineration was completed. Mar Disposal was completed. ( including restoration of rubble storage site ) Aim : to recycle over 50 % of total rubble Total disposal volume 1, 37 million tons 12 Volume of rubble in Sendai city approx. 1, 35 million tons ( 4 year’s worth of disposal ) Three storage sites in the eastern coastal area ( total 100 ha) and temporary disposal facilities were made. Rubbles were separated into over 10 types such as concrete, home appliances, wood, etc. Sendai Method ( disposal inside the city ) burnable non-burnable roughly recyclable separated rubble storage site Affected site ( temporary incinerator )( damaged vehicles ) ( home electric appliances ) ( metal ) As of Mar recycling rate ; 72 % Disposal of Disaster Waste

Disposal of Disaster Waste (2) Mar. 11 Human waste disposal facilities were fully destroyed due to tsunami All waste incineration plants made emergency stops and were damaged due to vibration from the earthquake Mar. 12 Collection of human waste from temporary toilets at evacuation centers began Mar. 13 Garbage collection at evacuation centers began Mar. 14 Plants resumed operation Mar. 15 Temporary waste storage sites where citizens bring in disaster waste by themselves opened (5 in the city) Collection of household garbage and human waste resumed Mar. 24 Collection of wet household goods etc. in areas affected by the tsunami began Mar. 28 Temporary recovery of human waste disposal site Mar. 30 Rubble storage site made available to pubic Removal of disaster waste in areas affected by the tsunami began ・ Asbestos ・・・ Monitoring at all areas within the city. Scattering asbestos waste from pulling down damaged houses removed and sealed on the spot, taken directly to final disposal site, then buried. ・ Soil Contamination ・・・ Asphalt paving and anti-leak sheet lining at rubble storage sites ・ Dioxins ・・・ Same level of exhaust control facilities as existing waste disposal plants Environmental-friendly Measures Complete Stop in Waste Disposal

Disaster Waste Handling System Feb Sendai City developed a disaster waste management plan To prepare for the next Miyagi-ken-oki earthquake, estimation method for the amount of disaster waste and the dimensions of temporary storage sites, as well as sorting categories and handling system of disaster waste was developed March 11, 2011 The Great East Japan Earthquake Based on damage assessment, discussion on the disaster waste handling system began Mar. 31, 2011 According to the management plan, the volume of waste was estimated based on the survey of damage Apr. 1, 2011 Disaster waste handling policy was decided For prompt handling, it’s necessary to capture the extent of the damage and take necessary actions precisely and quickly Therefore, it is efficient to prepare the procedure of needs assessment after a disaster beforehand

Cooperation with local companies Sendai City Sendai Construction Industry Association Miyagi Demolition Contractors Association Miyagi Industrial Waste Association Supervision ・ Discussion ・ Report Construction control Supervision ・ Report Member companies Contract Agreement for disaster response prior to March 11 Business with local companies ⇒ local rehabilitations lead to local economic recovery Cooperation in normal periods ⇒ quick response in the event of a disaster