Maximizing Your Productivity. Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt.

Slides:



Advertisements
Similar presentations
THE ECONOMIC FEASIBILITY OF ETHANOL PRODUCTION FROM SUGAR IN THE UNITED STATES USDA report released July 2006.
Advertisements

O X Click on Number next to person for a question.
O X Click on Number next to person for a question.
Transportation, Assignment, and Transshipment Problems
Treatment of Slaughterhouse Wastewater
Construction Materials (CE 1206)
Recycled Asphalt Program & Environmental Stewardship Program (Post Consumer Content) Robert C. Rea Nebraska Department of Roads WASHTO – Omaha, Nebraska.
Pike Industries, Inc. Lakes Region Transportation Workshop 11/15/13.
Greening the Blacktop Going Green with Sustainable Asphalt RAP, Recycling, Energy and the Carbon Footprint.
Concrete & Asphalt. Concrete –Batching – process of proportioning cement, water, aggregates and additives prior to mixing concrete –Concrete specs usually.
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
DOUBLE BARREL GREEN SYSTEM AN EQUIPMENT MEANS TO PRODUCE WARM MIX By Malcolm Swanson, P.E. Vice President – Engineering Astec, Inc.
PETROLEUM (CRUDE OIL) Substance believed to have been formed hundreds of millions of years ago when dead plants and animals were buried beneath sediments.
Linear Programming Network Flow Problems Transportation Assignment Transshipment Production and Inventory.
#1#1 Write the equation of the line that passes through the points: #3#3 Write the equation of the line that passes through (8,2) and has the same x-intercept.
MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.
3,000Ft 4,000Ft 5,000Ft O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2 O2O2.
ROAD PAVEMENT FORUM MAY 2007 ASPHALT RECYCLING. Recycling Energy consumption of recycled asphalt layers can be as little as 25% of that needed for new.
1 Emissions and Energy in the Asphalt Paving Industry Chris Robinette January 18, 2010 National Asphalt Pavement Association.
Petroleum makes the world go ‘round
How much for one egg…… Why Farmers Need Farm Financial Management… Craig Chase, Field Specialist Farm & Ag Business Management.
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
Fossil fuels are formed by prehistoric animals and animals. These animals or plants get covered with mud or soil, when years pass the mud or soil turn.
Fuel Oil Problem Costs have increased from $.95 in 2003 to over $4/gal in The increase from 2007 to 2008 represents a 67% increase. The largest one.
By: Gage.H.Coppock. And Jade.Timentwa. 3/25/14 5 Th period.
Ms. Gripshover Landscaping Unit 12. Identify the difference between an estimate and a bid. Describe landscape specifications. Prepare a cost estimate.
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
Overview of Energy- Environment Modeling MS&E 290: Public Policy Analysis February 22, 2005.
Relevant Costs and Benefits
Hydropower and thermal1 ECON 4925 Autumn 2007 Electricity Economics Lecture 5 Lecturer: Finn R. Førsund.
 A SOURCE OF ENERGY is where humans get energy from Example: solar energy, wind energy, oil, etc.
Click Here First.  What happens to the coal that is burned in a power plant to generate electricity or the gasoline that is burned in your car? Can those.
How Rising Energy Prices Can Affect Your Portfolio Common Sense on Complex Issues.
Energy and Mineral Resources
Energy Efficient Green House By:. Geothermal Plant Our house run’s on Geothermal energy and is located in Hawaii.
Then/Now You have already solved real-world problems using the percent proportions. (Lesson 7–3) Solve real-world problems involving markup and discount.
Actual Costs to fix roads at Fort Peck Reservation 2008 National Tribal Transportation Conference November 12, 2008 Oklahoma City, OK.
Lesson 9 MI/Vocab negative numbers- numbers less than zero positive numbers- numbers greater than zero Opposites- numbers that are the same distance from.
What is Fire? Fire consists of 3 things –heat, fuel, oxygen Fuel is anything that will combine with heat and oxygen to burn. Heat is anything that will.
Costs , Concepts, uses and Classifications
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Over Lesson 12–3 A.A B.B C.C D.D 5-Minute Check 2 Find the volume of the cylinder.
Kersten Stelmach, Maggie Bailey, Hailey Frankland.
BY, VERONICA SIMPSON Solar energy. I will use solar energy. The energy I'm going to use for the school is solar power. Solar energy is used to generate.
Things go in and things go out..  Your building will need both roll-up doors for truck access and swinging doors for human access.  For the roll-up.
Petroleum Chapter 10 Notes. Petroleum Fossil fuel –Formed hundreds of millions of years ago from dead plants & animals which were subjected to great heat.
Over Lesson 3–2 A.A B.B C.C D.D 5-Minute Check 1 Write 29 as a fraction. Write 0.6 as a fraction in simplest form.
Splash Screen. Lesson Menu Five-Minute Check (over Lesson 1–4) Then/Now New Vocabulary Example 1:Use a Replacement Set Example 2:Standardized Test Example.
Over Lesson 5–1 A.A B.B C.C D.D 5-Minute Check 1 A.P = 14 m; A = 10 m 2 B.P = 10 m; A = 14 m 2 C.P = 14 m; A = 14 m 2 D.P = 10 m; A = 10 m 2 Find the perimeter.
Diesel powered semi trucks would be one’s choice to use for shipping our product of soda and cars.
 1 Supervisor  4 EQUIPMENT Operators  2 Maintenance Workers  Total Annual Labor Cost: $324,845  Includes Overhead.
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
Energy and Mineral Resources
Thinking about Electricity Learning Objectives To know that we can make electricity in different ways. To begin to understand how the way we get electricity.
The coal cycle. The numbers in this illustration indicate the amount of carbon in each location in gigatons.
Elderberry Enterprise Analysis By Rose Wilson. John Hayden Model 250 row feet, 40 bushes (6x12 spacing) Establishment Expense Units $/unit Total Cuttings40$3.50$140.
Redefining the pace and quality of construction ACC Concrete – Value-Added Products & Solutions.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
Countries That Use Renewable Energy By Gia Di Cristofaro 4CS Latvia Austria Brazil America.
Foods 2. Put in place, get everything out and ready to cook.
Alabama Asphalt Pavement Association
Objective: Students will be able to use percents to calculate parts needed Students will be able to use systems of equations to solve mixture problems.
Oil and Pipelines.
ACP Inspector Certification Homework (oops, not homework) Solutions
السيولة والربحية أدوات الرقابة المالية الوظيفة المالية
Limits of Functions.
Fossils Done by: Mohammad Barakat. What is a fossil? Fossils are the remains of plants and animals that lived a very long time ago. They are mostly found.
Find the value of g. Find the value of h. 105° h g 75°
Energy and Mineral Resources
Presentation transcript:

Maximizing Your Productivity

Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt

Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

Cost of Paving – 60,000 ft. 2, 6” thick = $ / ton 2,000 tons x $ = $ 60, Based – 200,000 tons / year; $ 1.50 / gal. of fuel Fuel Savings 0.59 gal. / ton 200,000 tons x 0.59 gal. / ton x $ 1.50 / gal. = $ 177, per year ROI ~ 4.4 months =

– Light oils are either put in asphalt or left in asphalt during refining – These light oils boil at above 285 o F – By mixing at below 285 o F, the boiling point is never reached…eliminating smoke (vapor) and corresponding smell No Smoke – No Smell…Why?

Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

BID: $5,000,000. OO Aggregate$ x $ Plant Cost$ Trucking Laydown $ Overhead & Profit $ Price / ton Tons = $5,000, = 70,422 tons $ Agg. tons = 66,549 tons

Milling……………$ / ton Trucking………… / ton Processing…… / ton $ / ton Tons = $5,000, = 97, % 0.5( ) + 0.5(9. 00 ) When paying 50% of the value of RAP less Milling, Trucking and Processing Cost Plus 48,543 tons at $9. 00 / ton cost of RAP left over to use in other mix Tons of stone used 45,873 If RAP is used at 50% on other jobs and an additional 45,873 tons of stone will be used…Total stone used 91,946 tons

PROCESSED RAP SCREENED TO ORIGINAL INGREDIENTS RAP Black Rock 1/2 x 0 AA% Black Rock 1/2 - 3/8 DD% Black Rock 3/8 - 4 CC% Black Rock BB%

Black Rock 4-0 Black Rock 1/2 - 3/8 Black Rock 3/8 - 4 White Rock 4-0 White Rock 3/8 - 4 White Rock 1/2 - 3/8 BB% DD% CC% B% C% X%

White Rock 4-0 White Rock 3/8 - 4 White Rock 1/2 - 3/8 Black Rock 3/8 - 4 Black Rock 1/2 - 3/8 Black Rock 4-0 B% C% BB% X%

Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt