Results of BOC’s Fog (Fats,Oils,Grease) Reduction Program at a WWTP-62 MGD (234,696 m 3 /Day)

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to American #2 Wastewater Treatment Plant.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
CE 370 Sedimentation.
CLARIFIERS Prepared By Michigan Department of Environmental Quality
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Waste Water Treatment (Sewage Treatment)
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
Upgrade Project.  Old Rexnord bar screen removed and replaced with new Headworks bar screen.  Screenings compactor installed  Chlorine Disinfection.
CE 370 Filtration.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping Treatment.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
| Vigyan Ashram | INDUSA PTI |. In this presentation you will learn: – Greywater composition – Greywater treatment | Vigyan Ashram | INDUSA PTI |
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
Wastewater Treatment and Permit Compliance  Document Permit issue and expiration date  Document permit requirements  If discharge to city, review.
Surface Water Treatment Plant
Flow Equalization Tanks Presented by Keith Surface.
On-Site Leachate Management RM of Tache Pilot Study.
DESIGN OF WASTEWATER TREATMENT PLANT
WWT in Cromwell, Connecticut, USA The Mattabassett district wastewater treatment facility. By Stephen Schneider December 11, 2007.
Muskegon Wastewater Treatment Facility
Wastewater Treatment Plant
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Domestic Waste Water Treatment
Module 4: Fundamentals of Wastewater Treatment Wastewater Treatment Plant Operator Training.
Biology: November 5th, 2008 Objectives: Things to do: Due Dates:
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
Sewage Treatment.
SETA Water treatment plant maintenance
The Schererville Wastewater Treatment Plant is located in Northwest Indiana and serves the wastewater needs of a population base of approximately 45,000.
Where it goes when I go ! A look into London’s waste water challenges.
Relative Performance of Grit Removal Devices Matthew Bodwell Hydro International November 16, 2015.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
It All Starts Here... A day in the life of your waste water...
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Welcome To Our Plant Tour. Wheaton Sanitary District uses biological treatment to accelerate the natural bio-degradation of sewage in a small area (the.
Welcome To ENV-103 Presentation Wastewater Treatment System On.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
CTC 450 Review WW Collection Systems Types of pipes Installation.
Nikenbah WWTP Wide Bay Water Corporation’s experience to date in the operation of a 4.8ML/day Flat Plate Membrane Plant.
Welcome to the Key Largo Wastewater Treatment Plant.
Welcome to American-Bath Wastewater Treatment Plant.
Schererville WasteWater Treatment Plant
Application: 100PE to 10,000PE.
Sewage Treatment.
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Maintenance of the On-Lot Sewage System
Wastewater Treatment Dr.Gulve R.M..
Sewage Treatment.
And Local Agents.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Schererville WasteWater Treatment Plant
Wastewater Facilities Upgrade Project
6.1 Configuration of sedimentation tank
Clarifier Calculations Prepared By Debremarkos Department of HWRE Water treatment unit.
WEMCO® Hydrogritter® II Complete Grit Removal Package
Presentation transcript:

Results of BOC’s Fog (Fats,Oils,Grease) Reduction Program at a WWTP-62 MGD (234,696 m 3 /Day)

BOC GOAL To prove EcoCatalyst ® would solubilize incoming influent fog’s, along with the daily grease trucks (14 to 18 per day). Most significantly, reduce fog’s that have accumulated on the bar screens, wet wells, grit building plenum, distribution box, primaries (flight and chains),etc. BOC FOG reduction demonstration program ran 11/04 thru 11/17/05.

The Influent Loadings Conditions Average influent CBOD 5 is 230 mg/L. Influent flow averaged was 62 MGD (234,696 m 3 /Day). Peak flows of MGD (291, ,404 m 3 ) occur between 12 to 5 pm daily. Truckloads of outside Fog’s are received from 7:30AM to 4:30 PM Monday thru Friday. Aver number trucks received per day was 13.85, with a peak number of 18. The aver. GPD (m 3 ) of Fog’s was 35,381 GPD (134 m 3 ), with a peak of 40,800 gpd (154 m 3 )‏

The average: mg/L of FOG’S is 511.The peak loading is mg/L is 590. The incoming truck Fog loading does not reflect measurement of incoming influent mg/L of Fog’s which is normally 50 to 80 mg/L

EcoCatalyst ® Injection Method EcoCatalyst ® was injected directly into the influent well from 11/4 thru 11/14. EcoCatalyst ® was injected by a single speed chemical feed pump. The feed rate was ~.2 ppm or 12 gpd (45.4 Lpd). ~ 20 gallons were used to pre-treat the wet wells and grit building plenum.

Nassau County Bay Park, NY WWTP- BOC FOG- Reduction program demonstration- 11/04/05 Thru 11/17/05 Secondary Settling Treated Water Discharge Influent (60-80 MGD)‏ Screening Grit Chamber Building Primary Settling Aeration Blower Aeration Blower Sludge Storage Anaerobic Digester To sludge belt press and land application Bio-Organic Catalyst Injection Return \ Sludge Wasted Sludge Power Generation Aeration Tanks BOC Injection Point Wet Well Distribution Box FOG Tanks

Fog Receiving Area Fog Receiving Tank 1

The Bar Screening Equipment There was 1 inch build up of encrusted FOG on the stainless steel support shafts, sprockets and chains This build–up requires constant cleaning and must be maintained to prevent jumping of chains over sprockets. 2

Bar Screening Equipment-the “Before” on11/4/05 Note-The build-up of FOG on support shafts and equipment

After only 4 days of BOC treatment-11/08/05 Note: The cleanup of support shafts

Condition Of Wet Well The 15’x 15’ wet well was encrusted with built up fog’s. There was layer of fog’s coating the walls 14” to 18” thick and 24 to 30 inches deep. On the surface there was layer of fog ~ 4 to 6 inches thick with a free surface water flow in an area ~,24” wide by 24 inches long. The various stand pipes were severely encrusted with fog’s. 3

Wet Well 11/4-There was layer of fog’s coating the walls, 14” to 18” thick and 24 to 30 inches deep. NOTE: The encrusted fog’s around the stand pipe.

Progress In Wet Well Four Days Later on 11/08)‏ NOTE: The encrusted fog’s. around the stand pipe are gone.

Wet Well Walls 11/4-There was layer of fog’s coating the walls 14” to 18” thick and 24 to 30 inches deep.

Wet Well Surface On 11/4-Note the layer of fog’s ~ 4 to 6 inches thick coating the well surfaces.

Progress in Wet Well after four days- on 11/08 Note: The cleanup of well surfaces and the diminution of fog’s on the side walls.

Progress In Wet Well 7 Days Later, on 11/11 Note: The cleanup of well surfaces and the diminution of fog’s on the side walls.

The Conditions In Grit Building The grit/gravity thickener plenum is ~ 90’ long x 8’ wide x 6’ deep. The grit/gravity thickener plenum is ~ 90’ long x 8’ wide x 6’ deep. The plenum was severely impacted with fog build up. The plenum was severely impacted with fog build up. The fog build up began ~ 10’( 4-6” thick) to the left of the center tank bridge work, extending to the far right tank ~ 45’ to the wall(16 to 24” thick). The fog build up began ~ 10’( 4-6” thick) to the left of the center tank bridge work, extending to the far right tank ~ 45’ to the wall(16 to 24” thick). 4

Gravity Thickener Plenum-The Beginning On 11/4- Far Right Tank Fog’s have severely impacted the plenum and are 16 to 24” thick.

Comparison of Progress in GRAVITY THICKENER PLENUM -7 DAYS LATER ( 11/11)‏ 11/4- Note the encrusted fog’s. 11/11 The majority of fog’s are solubilized,but built up ledge still exists

PROGRESS IN GRAVITY THICKENER PLENUM 11/14-The majority of fog’s are solubilized and the built up ledge surrounding the access ladder is becoming smaller. The ledge was spot treated with EcoCatalyst ®. 11/17- Top view of access ladder after spot treatment

11/17- Note Incoming Fog’s and their re- accumulation after EcoCatalyst ® treatment ended on 11/14

On11/28-Note the re-accumulation of FOG’s in Gravity Thickener Plenum- far right tank Product injection ended 11/14, note the fog build up in two weeks!

Progress in Gravity Thickener Plenum- center tank 11/4-View ~ 10’ Left of center tank. Note fog build up 11/11- 7 days later

Flow Distribution Box To Primaries 11/4-the box was severely encrusted with fog’s with very little free flowing water. 11/11-the box opened up much like the front of the primary influent gate or grit building plenum. 5

Primary Influent Gates The primary influent gates were encrusted with fog’s. There was layer approximately 10” to 12” thick in front and rear of the gates. In the front, there was some free water flow in an area, 3” wide by 4 ” inches long. The rear of the gates were severely encrusted with very little free flowing water.

The “Before View” - Front view of Primary Influent Gate- 11/04/05 The Fog build up is 10 to 12 inches thick and had some free water flow in an area approx.,3”wide by 4” long.

Progress After 4 Days-The Front Of Primary Influent Gate-11/08/05

Progress After 6 Days -The Front Of PRIMARY INFLUENT GATE- 11/11/05

The “After” Of The Progress At Front Of Primary Influent Gate-11/14/05 The Fog build up is almost completely gone!

The Start-The Primary Influent Gate-Rear View on 11/04/05 The rear of the gates were severely encrusted with very little free flowing water.

Progress After Four Days At The Rear Of Primary Influent Gate- 11/08/05 The rear view of the gate, It is beginning to loosen up and to have free flowing water.

Progress At The Rear Of Primary Influent Gate- 11/11/05 The build up at the rear of the gate is beginning to loosen up and BOC is solubilizing the Fog’s

PROGRESS AT THE REAR OF PRIMARY INFLUENT GATE- 11/14/05 The rear of the gate has loosen up and note the free flowing water

Fog Build Up On Primary Flight Drive Chains And Sprockets There was a build up of fog’s on the primary drive chains and sprockets. This build up is generally indicative of fog’s covering primary, flights,walls,surfaces and rotary dunking discharge valves. This build up can lead to the electrical limit switch to stop the flight chain drive motors creating a maintenance condition. Or can cause the chains jump the sprockets which can lead to broken primary chains or flights.

The “Before” Of Primary Flight Drive Chains And Sprockets-11/4/05 Note: This build up of fog’s on chains and sprockets was typical condition of all the primary’s

After 7 Days,NoteThe Cleanliness Of Primary Flight Drive Chains And Sprocket-11/11/05

BOC Product Injection Ended On 11/14/05, 3 Days Later There Was Fresh Fog Build –Up On The Chain And Sprockets On 11/17/05

The “Before” Condition Of Primary Tanks, Flights, Effluent Discharge, And Effluent Weirs The primary tank surfaces were covered with large particles of fog’s. The primary flights were encrusted with fog/bio- film build up. The rotary dunking valves were encrusted with fog build up of 2-3 inches thick. The effluent discharge weirs were covered with a fog/bio-film build up.

11/04/05 -The “Beginning”- The Primary Tank Surfaces Were Covered With Large Particles Of Fog’s.

The Primary Flights Were Encrusted With Fog/Bio-film Build Up. 11/04/05 The “Before”, Note: The Fog/Bio film build up 11/14/05 -The “After” The removal of the Fog/Bio film build up- 11/14/05

Primary Rotary Dunking Valve Effluent Discharge The “Before picture” of the rotary dunking valve which were encrusted with fog build up of 2-3 inches.- 11/04/05 The “After picture” of the rotary dunking valve. Note: The beginning of the cleanup of valve and the clear water behind it. Also, the scum/fog layer has been reduced to ½ inch. - 11/11/05

Primary Rotary Dunking Valve Effluent Discharge On 11/04/05,the scum/fog line was typically 1-2 inches thick and extended 5-7 feet toward the point where the flight would submerge. 6 days (11/11/05) later, this was typical reduction in thickness of the scum/fog line. The scum/fog layer had been reduced to ¼ to ½ inch and the length in front of rotary was reduced to 2 to 3 feet.

Primary Effluent Weirs On 11/4/05,the beginning, Note the FOG/Bio-Film build up. Note:7 days later, the beginning of the cleanup of FOG/Bio-Film build up on the weirs

Bio Film /Fog Deposits On Walls And Dunking Valves Of Final Contact Tanks- 11/14/05 PLANT EMPLOYEES REPORTED THE ½ TO ¾” BUILD UP WAS GONE !

OBSERVATIONS The incoming fog truck loading is very high, ( 2.5 to 5 times more) as compared other plants in the tri-state area.(NY,CT and NJ)‏ Based on our experience, we expect that the difficult area ( the wet wells, primary’s, grit building, distribution boxes) could be solubilized in 3-5 weeks, without employee labor for mechanical clean up ( Vac trucks, fire hoses, etc.

After this clean out period, the EcoCatalyst ® injection daily injection rate would be optimized (lowered) to a maintenance dosage ( 4-8 GPD). The most cost effective injection of EcoCatalyst ® would be to use a two speed pump flow paced to the incoming loads of fog’s, i.e. A faster injection rate from 7 am to 5 pm.And a minimal rate for the balance of the 24 hours.