Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009.

Slides:



Advertisements
Similar presentations
Advanced Wastewater Treatment Plants.
Advertisements

1 Case Study Case Study Watkins Creek Franklin, TN.
Wastewater Treatment.
Decentralized Wastewater Management  Collection, Treatment, and in-ground reuse NEAR the point of generation.  Minimizes wastewater: Volumes Volumes.
Drip System Approvals: County Perspective October 19, Onsite Water Conference Anne Lowry, REHS Chatham County Environmental Health.
Waste Treatment – Septic Systems Lab #7. Objectives  Know how a conventional septic system works.  Be able to describe three alternative systems that.
Treatment of Slaughterhouse Wastewater
Community Land-Based Wastewater Disposal in Pennsylvania Prepared by: Mr. Brian Oram, PG Wilkes University
Anne Arundel County Department of Public Works
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
September 25,  Historical sewage treatment ◦ Washed away and diluted by rain and surface water ◦ Early human habitations were often built near.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Advanced Pretreatment: Proprietary Configurations, Operational Issues and O&M.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
Harris County Onsite Wastewater Reuse Program John Blount, P.E. Director of Planning & Operations.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
EPA’s DECENTRALIZED WASTEWATER MANAGEMENT GUIDELINES
HOUSE BILL 89 ONSITE WASTEWATER STAKEHOLDER MEETING 2 nd meeting September 8, 2011 Crystal Lovett, MO DNR Facilitator, and DNR-DHSS Panel.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
Introduction to Onsite Wastewater Treatment for Single Family Residences Texas AgriLife Extension Service.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Attached Growth Biological WW treatment Systems
Water Purification and Sewage Treatment
Basic “need-to-know” for Advantex AX-20 pretreatment systems.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Land Application Wastewater Systems Provides 2 o Treatment (Biological) Used in combination with pretreatment and primary treatment Often called Natural.
Waste Water Disposal Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 2aWaste Water Disposal and Storm Drainage Chapter 4, 7; Appendix A.
I-70 Greenfield Rest Area Constructed Wetland Wastewater Treatment System Research Project (SPR-2455, SPR-2456, SPR-2487) R. S. Govindaraju, J. E. Alleman,
NYC Watershed/Tifft Science & Technical Symposium September 19, 2013
Wastewater Management Why ?. Why are we concerned about wastewater? Public Health Protection Waterborne diseases Environmental Protection Our lands and.
Small Community Wastewater Alternatives Section V Advanced Treatment.
OutlineBackground Conventional on-site systems Advanced treatment systems.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Sewage Treatment.
Basic Treatment Train Diagrams Keep in mind…variations are ALWAYS possible.
Wastewater Treatment Processes
Human Waste Disposal More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water. More than 500 pathogenic.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Chapter 11 Wastewater Treatment. On-Site Disposal Systems Septic Tanks Pit Toilets.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Liquid Waste Management
Last Question of the Day- For first semester! 1. How do you get the waste out of wastewater o For Friday, please gather all Questions of the day to turn.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
It All Starts Here... A day in the life of your waste water...
3 Councillors Greater Taree 3 Councillors Great Lakes MidCoast Water General Manager Design And Construction Strategic Planning OperationsCorporate.
Understanding Wastewater Treatment Systems Vaughn Berkheiser – Coordinator, Onsite Wastewater Treatment Systems Training & Demonstration Facility Crop.
Our Water Systems
WATER MANAGEMENT.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Decentralized Wastewater Treatment in Jordan Challenge or Opportunity?
Attached Growth Biological WW treatment Systems
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment.
Wastewater Surcharge Reduction for Manufacturing Processes
Wastewater Treatment.
What is an on-lot sewage system?
An-Najah National University
Wastewater Treatment Dr.Gulve R.M..
Liquid Waste Management
Wastewater Management
Wastewater Treatment.
Big Sky Wastewater Facility Plan Update
Wastewater Treatment.
Wastewater Treatment.
Presentation transcript:

Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Land Disposal of Treated Wastewater Treatment & Disposal Options Overview Primary Treatment / Solids Separation Conventional Drain Field Disposal Sand Line Trench Disposal Secondary Treatment LPP Disposal Sand Mound Disposal Tertiary Treatment Drip Irrigation Disposal Spray Irrigation Disposal Re-Use (Purple Pipe) 2

Secondary Treatment Treatment Method Options 3 Attached Growth Orenco Recirculating Packed- Bed Media Filters Aqueonics Multi-Stage Trickling Filters Aquapoint Bioclere/Lotus Modified Trickling Filters Puraflo Peat Fiber Biofilters Recirculating Sand Filters Suspended Growth Extended-Air Activated Sludge Plants ATU’s (aerobic treatment units) SBR’s (sequencing batch reactors) MBBR’s (moving bed biological reactors)

Tertiary Treatment Treatment Method Options 4 Effluent Polishing Disc Filters MBR’s (membrane biological reactors) Constructed Wetlands Disinfection

Secondary Treatment Options Orenco AdVantex Recirculating Packed-Bed Media Filter 5

Secondary Treatment Options Aqueonics Multi-Stage Trickling Filter 6

Secondary Treatment Options Aquapoint Bioclere Modified Trickling Filter 7

Secondary Treatment Options Puraflo Peat Fiber Biofilter 8

Secondary Treatment Options Recirculating Sand Filter (RSF) 9

Secondary Treatment Options Extended-Air Activated Sludge Plant 10

Secondary Treatment Options Clearstream ATU 11

Secondary Treatment Options SBR 12

Secondary Treatment Options Puraflo PuraMax MBBR 13

How to Select the Right System Decision Process Overview 14 Feasibility of Options Define Wastewater Flow Rate and Characteristics Identify Potential On-Site & Off-Site Options Conduct Preliminary Site Reconnaissance Perform Feasibility & Cost Evaluation of Options Identify System Ownership and O&M Provider Site Suitability Conduct Pre-Design Conference with DHEC Conduct Detailed Site Investigation Identify & Quantify Suitable Disposal Area(s) Determine Long-Term Acceptance/Loading Rate (LTAR) Obtain DHEC Concurrence with Findings System Selection Determine Feasible Disposal Method(s) Determine Required Treatment Method(s) Perform Cost Evaluation & Select System Submit Preliminary Engineering Report for DHEC Approval

Individual Lot Conventional Drain Field System Summary Std. Septic Tank & Stone Drain Tile Field Drain field requires cleared land w/ < 10% slope. 3,000 sq ft active drain field + 50% repair area Approx. Unit Cost = $4,000 - $5,000 per lot. 15

Individual Lot Drip Irrigation System Schematic 16

Individual Lot Drip Irrigation System Summary Std. Septic Tank + Secondary & Tertiary Treatment. Subsurface drip field requires un-cleared land w/ < 33% slope. 2,000 sq ft drip field + no repair area. Approx. Unit Cost = $25,000 - $28,000 per lot. Requires 110-volt power supply + telephone line. Requires routine approx. $600/yr. 17

Individual Lot Drip Irrigation System Cost ( City of Austin, TX) 18 Estimated drip irrigation system costs, installed, including controls and alarm, (not including pretreatment unit(s)), $15,000 Energy costs (using KWH/day energy use),$0.47/month O&M, with a maintenance contract of $540/year (est. 18 $15/hour * 2.0, including taxes, overhead, and profit), $45/month Equipment repair/replacement costs, estimated at $50/year, $4.17/month 20-year NPW (not including design & permitting costs),$20,934.68

Individual Lot Repair Solution Camden County, NC AdVantex Pre-Treatment & Sand Mound Disposal over Sand Line Trench 19

Communal Drain Field System Overview 100-Lot Subdivision, Avg. 3-BR, in Upstate Primary Treatment 0.4 GPD/Sq Ft LTAR Requires 6.9 acres of Active Drain Field plus additional 3.4 acres for 50% Repair Area HOA Ownership (excluding Collection System) Permitting by DHEC-Bureau of Environmental Health (up to 50,000 GPD +/-) Approx. Unit Cost = $5,000 - $6,000 per lot 20

Communal Drain Field Cottageville Elem School 21

Communal Drip Irrigation System Overview 100-Lot Subdivision, Avg. 3-BR, in Upstate Primary & AdVantex Secondary Treatment 0.2 GPD/Sq Ft LTAR Requires 4.1 acres of Subsurface Drip Field & No Repair Area Requires Routine O&M Requires Utility Ownership Permitting by DHEC-Bureau of Water Approx. Unit Cost = $18,000 - $20,000 per lot 22

Ralph Chandler Middle School Surface-Drip Irrigation System Decision Process 23 Off-site Option (Public Sewer) = $2.0 million. Potential for On-site Conventional Septic System. NPDES River Discharge Not Desireable. Feasibility of Options School site full of program elements. Not enough suitable area for conventional septic. Off-site septic option not feasible. Shallow rock & steep slopes. Site Suitability Visited Operating Drip Systems in NC with DHEC. Selected surface drip irrigation of wooded, unbuildable area of site. PER Approved by DHEC. System Selection

School Surface-Drip Irrigation System Overview New Ralph Chandler Middle School at Fork Shoals - Orenco Recirculating Media Filter Treatment - 6-Acre GeoFlow Surface-Drip Irrigation Disposal – 0.2 GPD/Sq Ft LTAR - 250,000 Gal (2 weeks) Treated Effluent Storage - 15,900 GPD Design Flow - 4 Groundwater Monitoring Wells - $1.6 Million Construction Cost - Contract Operator – All Seasons Environmental Laboratories - Orenco Vendor Oversight Operations Contract - AQWA 24

School Surface-Drip Irrigation EQ Tank, Recirc Pumps, & Treated Effluent Storage 25

School Surface-Drip Irrigation AdVantex Treatment Pods 26

School Surface-Drip Irrigation Irrigation Pumps & Disc Filter 27

School Surface-Drip Irrigation Surface-Drip Irrigation Field 28

Wrap-Up …. What Makes a Decentralized System Successful? Suitability of Site & Sustainable Loading Rate. Proper Application of Treatment & Disposal Methods Selected. Good Design. Good Installation. Good O&M. Thanks for your attention …. 29