Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,

Slides:



Advertisements
Similar presentations
Federal Reserve Bank of Boston Case Study
Advertisements

UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Energy Efficient Steam Systems
Shram Shakti Bhavan / Transport Bhavan Energy Services Performance Contracting Project Summary of annual savings from various EEMs Guaranteed savings -
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Installation of New CHP system at the Old Aberdeen Campus.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
An Energy Producing Resource Recovery Plant Concept © Copyright 2011, All Rights Reserved, Filtration Dynamics, Inc. Energy from Wastewater.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
I can see the light! Energy Efficient Lighting. Energy webinar series.
400 Watts Metal Halide (455 Watts with ballasts) Pendant mount 22’ from the floor Six 4’, T8 lamps per fixture: 224 Watts (with ballasts) Mounted on the.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
ENERGY CONSUMPTION: MANZANITA HALL ENERGY UPGRADES BEN COHNDANNY GARNETT AUSTIN FROGGEPAUL SAIGEON MATT DUNCAN.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Santa Rita Jail Going off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
City of Norman Energy Management EPA Region VI Pretreatment Workshop August 4, 2010.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Energy Audits for Water and Wastewater Utilities US EPA Region 1 New England MA DEP-DOER-EOEEA.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
GREATER LAWRENCE SANITARY DISTRICT ENERGY EFFICIENCY PROGRAM.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
People. Ideas. Innovation. Reduction of Natural Gas Usage for City of Corvallis Waste Water Facility Kendra Seniow, Melissa Ghiglieri, Kelly Wilson Sponsor:
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Jen Muir JKMuir, LLC Leo H. LeBoeuf CL&P
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Managing Energy Consumption ENERGY SAVING IS ONLY GOOD IF IT SAVES YOU MONEY. ENERGY SAVING IS BETTER IF IT MAKES YOU MONEY.
Oakland Schools 2010/2011 Energy Report October 28, 2011.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Name of Building(s) or Project Speaker(s) Organization(s)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
International Newspaper Group 2008 Gannett’s Green Campaign.
Marriott Corporate Headquarters
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Energy Efficiency Opportunities at Wastewater Treatment Facilities UW – Madison Class November 3, 2010 Focus on Energy Joseph Cantwell, P.E.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
CEE 426 September :05 PM UW Madison Room _____ Engineering Hall Energy in Wastewater Treatment Plants Thomas E. Jenkins, P.E. 1.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
CITY OF LEOMINSTER. Customer Charge The cost of providing customer related service such as metering, meter reading and billing. These fixed costs are.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Tools to Control Energy Use through O&M Practices Wastewater/Water Sustainable Energy Cohort, October 11, 2012 Presentation by Walt Mintkeski, P.E.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
SHELTON SCHOOLS OPERATIONS. Energy and Conservation Grant Measures Look at the three main areas of impact Replace HVAC units and Controls at SHS Better.
The Energy Efficiency and Solar Nexus:
Robert Greenwald, P.Eng, MBA February 26, 2004
Fort Stanwix National Monument Energy Audit Contract
Energy Savings Projects
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
Energy Saving Concepts and Opportunities in Foundry (A case Study)
NET-ZERO-ENERGY (NZE) WASTEWATER TREATMENT PLANTS (WWTPs)
Wastewater Facilities Upgrade Project
Alabama Industrial Assessment Center
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Capital Improvement Plan April 9, 2018 Status Update
The Project Overview and Status Report
Presentation transcript:

Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D., P.E., L. Thomas, M. Jessee, S. Westover, P.E. in Municipal WWTPs

Typical Energy Usage in U.S. Wastewater Treatment Plants Electricity at Average Plant: – 1500 kWh/Million Gallons (MG) treated for secondary treatment – Advanced Treatment Plant: 2000 to 3000 kWh/MG Other Energy Use – External supply of Carbon; methanol; Micro-C – Natural gas

Reasonable Expectations

Typical Power Use Distribution

Case History: Energy Optimization Study at 46 MGD Tertiary Treatment Plant Energy Optimization Team: Operation, safety, maintenance, administration Process optimization Utility bill and energy use analysis Develop alternatives and assess feasibility Life-cycle costing Priority ranking by team votes Funding decisions

YCUA WWTP Recently expanded for 46 MGD average design flow Tertiary treatment (biological P removal, filters, UV disinfection) Belt presses and fluid bed incinerator All flow is pumped to the site

Base Line Energy Costs $2.7 M at WWTP/year $0.4 M at pump stations/year Average 9 cents/KWH Team Goal : Save 5% or more

Average Power Use Before the Project 3708 KW

Average Power Use After Implementation 2655 KW

Aeration Blowers A centrifugal blower system supplies air to aeration, filter backwash, and clear well At current loadings, the power requirement could be reduced from 1,070 to 940 hp for one blower modification – COST: $76,000 – SAVINGS: $68,000 per year Payback in 14 months

Demand Anticipation Demand Charge = Single highest 30-minute integrated reading of the demand meter during on-peak hours In place for 12 months $13.75 per kilowatt Target decrease 300KW ($49,500/year) Defined protocol for operator response

Demand History

HV Controls in Solids and PSST Building Original HV equipment controls have been disconnected; system is presently being run manually Upgrade controls to Direct Digital Controls (DDC) with METASIS system – COST: $240,000 – SAVINGS: $140,000 per year Payback in < two years

Intermittent Ventilation for Process Areas Dewatering area, cake trucking area, and blower building not always occupied; continuous ventilation unnecessary Install local controls, METASYS programming, and H2S/O2 alarm systems to only turn on HVAC when areas are occupied – COST: $40,000 – SAVINGS: $43,000 per year Payback < one year

Incinerator Room Heat Recovery Space above fluid bed always HOT Boiler combustion air un-tempered in winter Adjacent dewatering area requires 12 air changes per hour Project provides additional heated ventilation to dewatering, and pre-heated combustion air for boilers

Building Lighting Philosophy Original design incorporated highly efficient lights on 100% of the time in galleries and process areas Changes incorporate slightly less efficient lights but provide immediate illumination

Lighting System Retrofit Fixtures are original, 1970s T12 fluorescent and metal halide High-Intensity Discharge (HID) lights Replace all T12 with T8 lamps– Non-HID fluorescent tubes with electronic ballasts – COST: $265,000 – SAVINGS: $110,000 per year Payback in < three years

Intermittent Ventilation of Drywells at Four Pump Stations Crews enter once per week for two hours Engineering standards call for: – Six air changes per hour, or – Thirty air changes for ten minutes Upgrade controls with SCADA – COST: $40,000 – SAVINGS: $21,000 per year Payback in two years

Adopted Plan Optimization Study Cost: $59,000 SRF Project Plan for $1.0M approved with 40% forgiveness of the loan principal, July 2009 Design and construction underway, Annual Cost Savings: $450,000, or 11% savings

Summary of Selected Projects DescriptionAnnual Savings Est. Capital Cost PaybackCurrent UsageExpected Usage% Reduction Aeration Blower $68,000$76,00014 months800 kW700 kW12.1 Demand Anticipation $50,000$160,0003 years, 3 months N/A Intermittent Process Area Ventilation $43,000$40,00011 months47 kW14 kW70 HV Control Upgrades $140,000240,0001 year, 9 months 750 kW370 kW51 Incinerator Room Heat Recovery $19,000$65, years--5 Lighting System $110,000$265,0002 years, 6 months 189 kW91 kW52 Intermittent Drywell Ventilation $21,000$40,0002 years107 kW15 kW86 TOTAL $451,000$886, kW1191 kW37

Questions?