Slides for GIFS-TIGGE WG meeting Richard Swinbank.

Slides:



Advertisements
Similar presentations
GEO Work Plan Symposium – 6 May 2011 Plenary Session.
Advertisements

© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
World Meteorological Organization Working together in weather, climate and water EXPECTED RESULT 1 ENHANCED CAPABILITIES OF MEMBERS TO PRODUCE BETTER WEATHER.
WWRP 1 THORPEX Summary Paper David Parsons U of Oklahoma School of Meteorology
Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Eugene Poolman South African Weather Service Pretoria, South Africa
Introduction Slides for GIFS-TIGGE-11 meeting Richard Swinbank Masayuki Kyouda GIFS-TIGGE WG, Exeter, June 2013.
The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
“A LPB demonstration project” Celeste Saulo CIMA and Dept. of Atmos. and Ocean Sciences University of Buenos Aires Argentina Christopher Cunningham Center.
Slide 1 TECO on the WIS, Seoul, 6-8 November 2006 Slide 1 TECO on the WIS: Stakeholder Session THORPEX and TIGGE Walter Zwieflhofer ECMWF.
Proposal for a WWRP High Impact Weather Project Sarah Jones, Brian Golding Philippe Arbogast, Ana Barros, Aida Diongue, Beth Ebert, Grant Elliott, Pat.
Severe Weather Forecasting Demonstration Project (SWFDP) Peter Chen Chief, Data-Processing and Forecasting System Division Weather and Disaster Risk Reduction.
On-going WMO Demonstration Projects related to EXPO2010 Multi Hazard Early Warning System Multi Hazard Early Warning System Leading by SMB/CMALeading by.
GEO Work Plan Symposium 2014 WE-01 Jim Caughey THORPEX IPO.
B08 Project November 2009 Incheon, Republic of Korea The Beijing 08 Forecast Demonstration Project and Urban Prediction Needs in China LIANG Feng and WANG.
Current status of development of TIGGE products and support to SWFDP KYOUDA Masayuki 1, YAMAGUCHI Munehiko 2, and MATSUEDA Mio 3 1: Japan Meteorological.
1 Buizza et al: TIGGE (SRNWP WS, Bologna, 7-8 April 2005) TIGGE (The THORPEX Interactive Grand Global Ensemble) Roberto Buizza 1, Philippe Bougeault 1,
The role of RDPs and FDPs Alice M. Grimm Dept of Physics, Federal University of Paraná, Brazil
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
TIGGE LAM PLAN Eighth meeting of the GIFS-TIGGE Working Group Geneva, 22 to 24 February 2010 Tiziana Paccagnella.
1 GIFS-TIGGE WG MEETING AUG. 31 – SEPT , GENEVA, SWITZERLAND Richard Swinbank & Zoltan Toth (UK Metoffice & NOAA/OAR/ESRL/GSD) Acknowledgements:
WWRP The THORPEX Mid-Term Review David Burridge Of no particular abode.
Research Results from TIGGE and a Vision for a New Paradigm for Global Prediction David Parsons Chief, World Weather Research Division (WWRD)
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,
The THORPEX Interactive Global Ensemble (TIGGE) and development of a future Global Interactive Forecast System (GIFS) GIFS-TIGGE WG report for WWRP JSC4.
Report from GIFS-TIGGE working group Richard Swinbank, and Zoltan Toth, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues Presentation.
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
WWRP THORPEX Alan Dickinson Chair THORPEX ICSC and David Burridge THORPEX IPO.
© Crown copyright Met Office Data Assimilation Developments at the Met Office Recent operational changes, and plans Andrew Lorenc, DAOS, Montreal, August.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
Slide 1 GO-ESSP Paris. June 2007 Slide 1 (TIGGE and) the EU Funded BRIDGE project Baudouin Raoult Head of Data and Services Section ECMWF.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
1 Proposal for a Climate-Weather Hydromet Test Bed “Where America’s Climate and Weather Services Begin” Louis W. Uccellini Director, NCEP NAME Forecaster.
WWRP Commission of Atmospheric Sciences - new projects Polar Prediction project – “The Commission concurred with the Executive Council Panel of Experts.
WWRP An International Polar Prediction Project Chair: Gilbert Brunet Rapporteur: Barry Goodison 1.
Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate”
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
THORPEX THORPEX (THeObserving system Research and Predictability Experiment) was established in 2003 by the Fourteenth World Meteorological Congress. THORPEX.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Introduction slides for Joint GIFS-TIGGE/PDP Meeting Richard Swinbank, Masayuki Kyouda, Heini Wernli, Istvan Szunyogh Joint PDP & GIFS-TIGGE WG meeting.
TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek, Manuel Fuentes (ECMWF)
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
Eugene Poolman RSMC Pretoria
Research to operations (R2O)
Severe Weather Forecasting Demonstration Project (SWFDP) Bay of Bengal
Introduction Slides for GIFS-TIGGE-12 meeting
THORPEX report to the CAS Management Group Alan Dickinson ICSC Chair
Links with GEO.
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Report from GIFS-TIGGE working group
Ensemble tropical cyclone and windstorm forecast applications
Linking operational activities and research
SWFDP Key Issues for GIFS-TIGGE
GEOWOW update Richard Swinbank GIFS-TIGGE meeting March 2014
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
High Impact Weather Emerging challenge identified at CASXVI
MOGREPS developments and TIGGE
The IPO to organise a review Encouraged review
AGREPS – ACCESS Global and Regional EPS
Severe Weather Forecasting Demonstration Project (SWFDP)
Met Office contribution to GIFS-TIGGE / SWFDP collaboration
Presentation transcript:

Slides for GIFS-TIGGE WG meeting Richard Swinbank

Aims of the meeting Richard Swinbank & Zoltan Toth

Aims of the 8th GIFS-TIGGE WG meeting TIGGE Research: –Review recent research based on TIGGE data –Discuss research needs and set priorities –Widen the use of TIGGE data Take forward the GIFS Forecast Demonstration Project and interactions with related pilot projects, as mandated by ICSC-8 & CAS-XV: –Agree plans for development of GIFS-FDP products –Agree how to evaluate products and their societal impacts –Engage with the CBS Severe Weather Forecast Demonstration Project and other pilot projects expected to require TIGGE data (NW Pacific TC, HEPEX, HYMEX, La Plata,…) Discuss long-term vision & way forward: –TIGGE-LAM – status & next steps; links with regional activities –Discuss how to develop links with WCRP & CHFP –Refine plans to take forward the concept of GIFS

Meeting background The meeting is being held in conjunction with a meeting of the SWFDP steering group. There will be a joint half-day session, to address the key aim of engaging the GIFS-TIGGE WG with the SWFDP, in order to agree plans for implementation of regional forecast development projects for the evaluation of GIFS products. It is not proposed that the GIFS-TIGGE WG itself run regional forecast development projects, but instead interacts with regional projects under the auspices of SWFDP, along with other pilot projects (FDPs and RDPs), to evaluate the benefits of prototype GIFS products. The SWFDP SG chairman – Bernard Strauss, secretary – Peter Chen, and CBS/TIGGE liaison – Ken Mylne, and Steve Ready and Eugene Poolman have been invited to attend on the first day. Representatives of other WWRP/THORPEX working groups and relevant regional committees will also be involved in the meeting. The schedule of the meeting is designed to maximise the opportunity for the GIFS-TIGGE WG to interact with the SWFDP SG.

GIFS-FDP Introduction to Framework Plan Richard Swinbank & Zoltan Toth

GIFS-FDP - Introduction WWRP Forecast Demonstration Projects have been instrumental in introducing research advances into operational forecasting practices. GIFS-FDP is designed to transition THORPEX R&D into the operational community. New products will be designed tested & evaluated in conjunction with the CBS Severe Weather Forecast Demonstration Project (SWFDP) and other pilot projects. As a transition activity, GIFS-FDP will interact closely with both WWRP-THORPEX and operational forecasting activities. GIFS-FDP defines an overall framework. Regional subproject plans will be developed to address specific needs of each region in a “bottom-up” manner.

GIFS-TIGGE roadmap The THORPEX implementation plan envisages the establishment of a Global Interactive Forecast System (GIFS) to realise the benefits of THORPEX in operational forecasting. We envisage 3 main stages: –TIGGE (2005 onwards) – scientific research based on archive of ensemble forecasts. –GIFS Development ( ) – development and evaluation of products & services based on ensemble forecast data –GIFS Implementation (after 2012) – implementation of real-time products and services. “End to end” GIFS. GIFS-FDP is focused on stage 2 – the next steps Longer-term developments depend on benefits demonstrated in GIFS-FDP

GIFS Forecast Demonstration Project (GIFS-FDP) Objectives: –To develop and test prototypes for forecasting various high impact events. –To evaluate the prototype products in an operational environment for a limited time period (1-2 years+) –To transition successful products into ongoing operations Collaboration with the CBS SWFDP, and other regional initiatives. –Focus on regional subprojects: Southern Africa, SW Pacific; possible future projects in S. America, S Asia/ Indian subcontinent. –Use regional cascade infrastructure set up for SWFDP –GIFS-FDP products will supplement products distributed by SWFDP, once regional SWFDP subproject is well-established –Training on the use of these products

Enhancements to SWFDP Compared with the products available currently in the existing SWFDP programme, GIFS-FDP will add: –Scientifically driven development of new types of products to highlight forecasts of severe weather; –Products based on multi-model ensembles; –Statistically bias corrected and downscaled information; –Longer range outlooks including week-2 forecasts for planning and mitigation efforts related to possible future high-impact weather events. While SWFDP includes subjective assessments by forecasters, GIFS-FDP will also entail objective verification by regional & national centres.

GIFS-FDP – key features GIFS products will be based on forecast data from TIGGE partners, with a focus on: –Tropical Cyclones –Heavy Precipitation GIFS-FDP will entail extensions to current TIGGE data policy for real time data access and operational use. GIFS-FDP will include: –Capacity-building and training –Evaluation and verification Two technical focus groups will address: –Access to ensemble forecast data –Collaborative development of ensemble-based products for high-impact weather events

GIFS-FDP interactions GIFS-FDP SWFDP Southern Africa SW Pacific Future subprojects NW Pacific TC Project Other pilot projects Other THORPEX and WWRP WGs GIFS-TIGGE Working group THORPEX Regional committees Research community Operational forecast community

12 Products for high-impact weather In response to IWTC, the GIFS-TIGGE working group initiated the exchange of real- time tropical cyclone track predictions using “Cyclone XML” format, starting with T- PARC (Summer 2008) Further developments could include: –Extension to wind speed, intensity, etc. –Development of products to visualise data GIFS-TIGGE WG identified precipitation as the next high priority focus for GIFS development More challenging logistics than tropical cyclone problem –Data volume – real-time exchange much more challenging –Need for data sets for calibration & verification

Taking forward GIFS-FDP The GIFS-FDP plan is just a framework At this meeting, we need to start developing plans for: –Product development (TCs and rainfall) –Evaluation & verification –Engaging with operational forecasters & end users … in the context of SWFDP subprojects, NW Pacific TC project, and other regional activities (topics 4 & 5). Identify knowledge gaps, and foster research to fill them (topic 6). We also need to agree (topic 12, at end of meeting): –how GIFS-FDP should be managed; –operation of technical focus groups; –formalising interactions between partners.

Extra-tropical cyclone identification & tracking Richard Swinbank

Extra-tropical trackers KMA – (Murray & Simmonds, 1991, BoM) Identify cyclones using mean sea level pressure. Tracking uses combination of extrapolation (motion and p tendency) & climatological cyclone movement. NCEP/GFDL – (Marchok, 2002) Identify extratropical cyclones using pmsl (TCs use more parameters). Tracking uses combination of wind vectors & linear extrapolation. Met Office – (Hewson & Titley, 2009) Uses θ w at 1km to identify fronts, then vorticity to identify & characterise developing cyclones along the fronts. Barotropic lows identified just from vorticity. Tracking using combination of steering level wind, extrapolation & lifecycle information.

MOGREPS upgrades Richard Swinbank

© Crown copyright Met Office 2010 Resolution Upgrades Global 90km L38 to 60km L70 T+72 and MOGREPS-15 Regional 24 km L38 to 18km L38 T+54 Plus SKEB2 (already in MOGREPS-15 / TIGGE) and vertical localisation of inflation factor CAPE & CIN to be added to TIGGE data set Due to go operational 9 March Regional to 18km L70 June 2010 NAE Research into ensemble with 1.5km convection- allowing UK model