1 APGENCO Profile & Performance. 2 A NDHRA PRADESH POWER GENERATION CORPORATION LIMITED (APGENCO) WAS ESTABLISHED BY GOVERNMENT OF ANDHRA PRADESH UNDER.

Slides:



Advertisements
Similar presentations
India Electricity – 2006 Session – II Renovation & Modernisation Presented by: M.R. Ganesan / GM / SSBG Bharat Heavy Electricals Ltd.
Advertisements

1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
Dr. Kamal Kant Dwivedi Counselor (S&T) Embassy of India Washington DC,
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.
SOLAR POWER A SUSTAINABLE ENERGY SOURCE DMRC’s INTITATIVES Delhi Metro Rail Corporation.
Madhav Solar (Vadodara Rooftop) Private Limited Be a partner of Madhav Group to develop Vadodara into Solar city.
Workshop on Energy Statistics, China September 2012 Electricity and Heat Statistics 1.
DETAILS OF CALCULATIONS:
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
1 Adviser : Dr. Yuan-Kang Wu Student : Ti-Chun Yeh Date : A review of wind energy technologies.
POWER GENERATION TECHNOLOGIES
Combined_Cycle_Power_Plant Prepared by: Nimesh Gajjar.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
1 WELCOME TO APGENCO’S PRESENTATION ON CERC’S DISCUSSION PAPER JUNE-03 ON TERMS & CONDITIONS OF TARIFF (Commencing ) by V.V.RAO, IDAS DIRECTOR/
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Presentation Title A holistic view of energy efficiency improvement in power generation. New technology, renovation & modernization and process improvement.
ISF:RESEARCH AND CONSULTANCY THINK. CHANGE. DO INSTITUTE FOR SUSTAINABLE FUTURES South African Energy Sector Jobs to Report for Greenpeace Africa.
AVAILABILITY BASED TARIFF. HIGHLIGHTS OF CERC ORDER DATED ON ABT 1. ORDER APPLICABLE TO J&K ALSO. 4. ABT WAS TO BE IMPLEMENTED IN ALL THE REGIONS.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Indian Power Sector- Clean Coal Technologies V.S. VERMA MEMBER, CERC 1.
Hydro2012 : October 2012, Bilbao, Spain 1/20 Challenges and Opportunities in Using International Standards in Hydropower Development: The Case.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
Sustainable Energy options for Northern Ireland European Studies Project.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Profile of Energy in Canada Presentation to the UN Oslo City Group on Energy Statistics February 2009 Ottawa, Canada.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
THERMAL POWERTECH CORPORATION INDIA LTD (TPCIL). 2 JV Structure With more than 48 years of Construction Experience Gayatri Group has established itself.
Catanduanes, Philippines Lower Dugui Mini Hydro Power Plant.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
The Energy Sector in India. Growth of installed capacity for electricity in India.
Efficiency in industry through electro-technologies Paul Baudry, EDF / R&D The future of Energy in Enlarged Europe, Warsaw 7-8th october 2004.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Biggest hydroelectric power plants in world
Wind Energy an Introduction Fastest Growing Energy in the World wind power has the potential to produce 72 Terawatts,5 times more energy than the world.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC.
Perform Achieve And Trade (PAT) Mechanism
Cost Impacts of Cycling Coal-Fired Power Plants
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Terms & Definitions.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
1 12. WORLD ELECTRICITY IN THE YEAR 2050 Asko Vuorinen.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
SCOPE OF THERMAL POWER PLANTS IN INDIA SUBMITTED BY GUIDED BY SURENDRA KUMAR AHIRWAR R.L. SHREE MALI.
STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP
Welcome to presentation Electricity in Bangladesh
Introduction And Thermal Power Plant
Utility Bills Reduction by Energy Consumption Management
Experience of R & M from Regulatory Perspective
Electricity Generation: Coal v/s N-Gas - Basic Economics
Meeting of Generation Wing Officers
REGIONAL GRIDS IN INDIA – QUICK FACTS
Electricity Generation: coal v/s n-gas - Basic Economics
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Summer Plan: 2013 (1st March – 31st May)
Managing Director (Bajaj Power Ventures Ltd)
Award for Excellence in Energy Conservation
Presentation transcript:

1 APGENCO Profile & Performance

2 A NDHRA PRADESH POWER GENERATION CORPORATION LIMITED (APGENCO) WAS ESTABLISHED BY GOVERNMENT OF ANDHRA PRADESH UNDER THE ANDHRA PRADESH ELECTRICITY REFORM ACT 1998 ON ’99 WITH THE PRINCIPAL OBJECT OF ENGAGING IN THE BUSINESS OF GENERATION OF ELECTRICITY

3 EXISTING STRUCTURE OF POWER SECTOR IN ANDHRA PRADESH APERCAPERC

4 Installed Capacity – Thermal Kothagudem TPSs 700 MW MW Vijayawada TPS 1260 MW Rayalaseema TPS 420 MW Ramagundam TPS 62.5 MW Nellore TPS 30 MW Total: MW

5 Installed Capacity - Hydro Nagarjunasagar MW Srisailam-LBPH 900 MW Lower Sileru 460 MW Others and Mini HES 65 MW Wind - 2 MW Machkund 84 MW (120 MW) T.B.Dam 57.6 MW (72 MW) Singur 15 MW Total: MW Upper Sileru 240 MW Srisailam-RBPH 770 MW Donkarayi 25 MW

6 VTPS 1260 MW MW (Proposed) GTPS 272 MW (O&M Contract) KTPS 700 MW KTPS-V 500 MW RTS-B 62.5 MW RTPP 420 MW MW (Proposed) NTS 30 MW MACHKUND 84 MW UPPER SILERU 240 MW LOWER SILERU 460 MW DONKARAYI 25 MW POCHAMPAD 27 MW NIZAMSAGAR 10 MW SINGUR 15 MW NSRCPH 90 MW NSLCPH 60 MW N’SAGAR MW SLBPH 900 MW TB DAM 57.6 MW PABR 20 MW SRBPH 770 MW R.KRISHNA R.TUNGABADRA R.PENNA R.MANJEERA R.SILERU R.KINNERASANI GENERATING STATIONS OF APGENCO R.GODAVARI JURALA 234 MW (Proposed) PEDDAPALLI MINI HYDRO 5 MW + 4 MW (Under Construction) TAILPOND DAM 50 MW (Proposed) Thermal MW Hydro MW APGENCO MW DUMMUGUDEM 360 MW (Proposed)

7APGENCO 3 rd Largest Generation Utility in the Country Installed Capacity (MW) NTPC 21,249 MSEB 9,743 APGENCO 6,557

8 O&M costs of VTPS In Rs. Lakhs * 1 st April to 30 th September

9 O&M costs of KTS-D in Rs.Lakhs * 1 st April to 30 th September

10 O&M costs of RTPP in Rs.Lakhs * 1 st April to 30 th September

11 Abstract of O & M costs in Rs Lakhs/MW

12 O&M costs of Sileru complex (725 MW) in Rs. Lakhs * 1 st April to 30 th September

13 * 1 st April to 30 th September O&M costs of N.Sagar complex (960 MW) in Rs. Lakhs

14 O&M costs of Srisailam RB (770 MW) in Rs. Lakhs * 1 st April to 30 th September

15 Availability of hydro stations (%)

16 Station wise Thermal Generation (MU) * 1 st April to 31 st October

17 Station wise Performance (PLF) * 1 st April to 31 st October

18 Awards Won by Generating Stations

19 Steps for improving the availability  Ensuring availability of Critical spares and Consumables  Reduction of forced outages in number and time  Compressing the period of planned outages  Better preventive maintenance works  Personal involvement at highest level  Ensuring availability of skilled staff and specialists to supervise the breakdown/planned works round the clock  Capital Overhauls planned on condition monitoring basis instead of manufacturers recommendations  Ensuring availability of stand-by-equipment to avoid partial load operation of the unit

20 Forced outages in Numbers * Upto Sep’03

21 Planned outages duration in Percentage * Upto Sep’03

22 Forced outages duration in Percentage * Upto Sep’03

23 Availability in Percentage * Upto Sep’03

24 Plant load factor in Percentage * Upto Sep’03

25 Loading factor in Percentage * Upto Sep’03

26 Specific oil Consumption in ml/Kwh * Upto Sep’03

27 Heat Rate in Kcal/ Kwh * Upto Sep’03

28 Auxiliary consumption in Percentage * Upto Sep’03

29 GCV of coal received in Kcal/ Kg * Upto Sep’03

30 Design parameters

31 APGENCO - Thermal Units - Annual Overhaul

32 Effects of ABT & Merit Order dispatch on parameters  Though we have achieved very good parameters in respect of Heat Rate, Secondary oil consumption, availability factor, PLF and forced outage rate, it may not be possible for APGENCO to achieve such performance in future years under ABT/ Merit Order regime and considering ageing of the plants.  During this year for the last seven months, back down of Generation is 300 MU which works out to 2.31% of total generation. Now under ABT/ Merit Order dispatch, we have to reduce the load to the extent of 40% of rated capacity of the unit which will adversely affect the following parameters. 1. Increase in Heat Rate due to partial load operation. 2. Increase in secondary oil consumption as single mill operation has to be resorted, requiring oil support for stabilization of the flame. 3. Increase in Auxiliary consumption due to operation of Auxiliaries at partial load. 4. Forced outage rate will increase due to frequent variation of the load affecting the pressure parts

33 Thank you

34 Supplementary information

35 Installed Capacity during last 6 years in AP * 1 st April to 15 th September

36 Capacity Additions (MW) in AP * 1 st April to 15 th September

37 APGENCO PROPOSED ADDITIONS

38 Heat Rate variation w.r.t. designed value (%) * Upto Sep’03

39 Vintage of the units in Years

40