Presentation is loading. Please wait.

Presentation is loading. Please wait.

THERMAL POWERTECH CORPORATION INDIA LTD (TPCIL). 2 JV Structure With more than 48 years of Construction Experience Gayatri Group has established itself.

Similar presentations


Presentation on theme: "THERMAL POWERTECH CORPORATION INDIA LTD (TPCIL). 2 JV Structure With more than 48 years of Construction Experience Gayatri Group has established itself."— Presentation transcript:

1 THERMAL POWERTECH CORPORATION INDIA LTD (TPCIL)

2 2 JV Structure With more than 48 years of Construction Experience Gayatri Group has established itself as an Infrastructure major and a pioneer organization in construction sector. Sembcorp is a leading energy, water and marine company with worldwide presence and expertise in Singapore, China, Vietnam, the United Kingdom, the UAE and Oman. 51%49% Backed by two established companies, TPCIL is setting up 2X660 MW (Phase 1) supercritical coal based power plant in Nellore, Andhra Pradesh. The project is expected to be commissioned in 2014.

3

4

5

6

7

8 8 O&M set up & Job Description

9 9 O&M Group Operation Mechanical maintenance C&I maintenance Electrical maintenance Job Description: Round the clock Operation of the plant Ensure Safety Efficient operation Day to day monitoring and analysis of plant performance Job Description: Round the clock Operation of the plant Ensure Safety Efficient operation Day to day monitoring and analysis of plant performance Job Description Job Description: Safe, Effective and efficient maintenance of the plant. Managing schedules of preventive and break down maintenance. Job Description: Safe, Effective and efficient maintenance of the plant. Managing schedules of preventive and break down maintenance.

10 10 Thank You


Download ppt "THERMAL POWERTECH CORPORATION INDIA LTD (TPCIL). 2 JV Structure With more than 48 years of Construction Experience Gayatri Group has established itself."

Similar presentations


Ads by Google