JBTDS Planned Competitive Prototyping (CP) Test Events 31 March 2011 1.

Slides:



Advertisements
Similar presentations
S/K Challenge Demonstration Information and Planning Makeup Meeting US Army Dugway Proving Ground Presented 03 Jun 2014 Unclassified.
Advertisements

CARGO COMPARTMENT SMOKE DETECTOR STANDARD AS8036 UPDATE
Test & Evaluation Master Plan (TEMP) Overview
May 2004Iridium Users Workshop, Seattle National Data Buoy Center’s Experiences with Real-Time Data Retrieval from Remote Stations using Iridium; and Data.
Overview of Terrorism Research at the CDC Dixie E. Snider, M.D., MPH. Associate Director for Science Presented at 2003 Medical Research Summit March 6,
Moody F061 ISE Conceptual System Design “Sets the Stage” State the problem Identify the need Conduct advanced system planning & feasibility analysis.
SyncGen Multiple Unit Selectivity for Stator Ground Faults Using a Sensitive Directional Element Design Proposal Presentation.
Dry Filter Unit (DFU) Overview
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Aircraft Cargo Compartment Fire Detection David Blake FAA William J. Hughes Technical Center Atlantic City Airport, NJ Phone:
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
Iris Range : «Unconventional» conventional detectors.
TCCA Aircraft Certification
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
ITAINNOVA TA: Scientific & Administrative issues Electromagnetic Compatibility Facility for electronics noise and grounding diagnostics (WP12 – Task 12.2)
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
Testing: Chapter 13 "You make it, I’ll break it".
1 Root Cause Analysis of BIT False Alarms Presented to National Defense Industrial Association 6th Annual Systems Engineering Conference Mr. Kerry Westervelt.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Page 1© Crown copyright 2004 The Challenges for an operational wind profiler. Remote and unattended Tim Oakley TECO-05 Bucharest, 4 th -7 th May 2005.
Florida Operations Level Hazardous Materials Training Unit 5.5 MISSION SPECIFIC: Air Monitoring and Sampling.
1 ● Plant Automation Security Review of Cyber Security Attack at Maroochy Water Services ● Bradley Yager ● National Business Development Manager – Telemetry.
From Research Prototype to Production
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
The Robert A. Reisman Precision Armaments Laboratory
Decontamination of filed equipment used in environmental site characterization and ground-water monitoring projects University of Arkansas 11/13/2006 By.
Doc.: IEEE /168r0 Submission March 2001 Stephen Berger, TEM Consulting Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Partner for progress Christian Moldaenke, Corina de Hoogh, Arco Wagenvoort, David R. Alexander and Detlev Lohse Water Monitoring Systems: the Daphnia and.
STRATEGIES FOR THE DETECTION OF UNKNOWN BIOLOGICAL AGENTS Dr. Peter J. Stopa US Army Edgewood Chemical Biological Center Aberdeen Proving Ground, MD.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
RESET & Technology Insertion BG Roger A. Nadeau DCG, Systems of Systems Integration RDECOM 9 September 2004.
 Field Deployable Hydrolysis System Edgewood Chemical and Biological Center.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Bio/Chem agent detection and decontamination Kin P. Cheung Electrical & Computer Engineering.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Alternating Current Potential Drop Probe Alternating current potential drop (ACPD) testing is a relative newcomer to the area of nondestructive evaluation.
TGYDGL09 Project DEPLOYABLE RAPID DIAGNOSTIC LABORATORY MOBIOCHEM Ltd.
Chapter 3 Conceptual System Design
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Visit us at E mail: Tele:
Dr.F. Arteche EMC DEPFET Project: A general overview.
Assessing Logistics System Supply Chain Management 1.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Dr. W. Huisman Cairo, november 19th ISO 15189:2007 clauses 5.1 Personnel 5.2 Accommodation and environmental conditions 5.3 Laboratory equipment.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
Introduction of Laser Evaluating Technology to Street Leak Surveys Ashraf Salha APA Group Gas Speak Colloquium September 2015.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
Overview Presentation MKT-DSRV-P- 001E. Product Overview Network based video transmission product with on-board digital recording Allows analogue fixed/PTZ.
Request for Information (RFI) for the provision of a Turnkey Project for an Enhanced Unattended Transmission Substation CORP3430 Date: 4th March 2016.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Entrance to EMI.
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Parts Management Plan Builder 26 July 07
Preliminary results on optimization of gas flow rate for RPCs
Instrument Maintenance
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Air Carrier Continuing Analysis and Surveillance System (CASS)
Integration and Test Organization Chart
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
L&V Manpower Development Prepared by: HR department Mar, 2013
Presentation transcript:

JBTDS Planned Competitive Prototyping (CP) Test Events 31 March

2 Work Flow

Test Schedule 3

Receipt Inspection 4 Test Site: John Hopkins University / Applied Physics Lab (JHU/APL)  Physical characteristics Size (LWH) of each sub-system alone, in shipping container, in soft case/carry configuration. Weight of each sub-system alone, in shipping container with supplies, in soft/carry case with supplies. Intake Air Flow Rates (detection and collection). Measurements include necessary support equipment and consumables.  Rough Order Limit of Detection (LOD) 3 detectors per vendor. Challenged with a “Stepped-up” aerosol of Bacillus athrophaeus (BG). Co-disseminated with a Low Level “natural background” for detector algorithms.  Collector Performance 3 collectors per vendor. Collection Efficiency (CE) and Collection Concentration Factor (CF). 4 particle size ranges (1, 3, 5, and 9 micron).  Limited Identifier Performance 3 identifiers per vendor. 3 standard solutions of BG serial diluted based on vendor Limit of Identification claims.  Duration: November 2011 (4-5 Weeks)

Live Agent Chamber Performance 5 Test Site: Dugway Proving Ground (DPG), Life Sciences Test Facility  Systems Per Vendor: 1 Detector, 1 Collector, and 1 Identifier.  Test Summary: 1 agent from each biological class (spore, vegetative cell, toxin, and virus). Simulated Natural Background disseminated with all aerosol challenges. DyCAG System.  Agent Only Limit of Detection.  Agent and Interferent (TBD) Limit of Detection.  Interferent Only (False Alarm / False Identification Testing).  Aerosolized Limit of Identification. [Samples collected during previous tests will be serial diluted to determine the Limit of Identification of aerosolized samples with and without Interferent. Answer the question: Is the identifier more sensitive than the detector?]  Duration: December – April 2012 (4 ½ Months) ClassBSL-3 (live)Starting Concentration Range (ACPLA) SporeBacillus anthracis Ames50 Vegetative CellFrancisella tularensis (Schu 4)50 VirusVenezuelan equine encephalitis (VEE)100 ToxinC. Botulinum toxin50

Live Agent Assay 6 Test Site: Edgewood Chem. Biological Center (ECBC), McNamara Life Sciences Bldg.  Systems Per Vendor: 1 Identifier.  Test Summary: 1 agent from each biological class (spore, vegetative cell, toxin, and virus). Solutions prepared in media specific to each identifier.  Agent Only Limit of Identification.  Agent and Interferent Limit of Identification.  Identification Selectivity (near-neighbors).  DoD Biological Sampling Kit (BSK) buffer solution compatibility  Proposed Agents: Same as Aerosol Chamber Tests  Proposed Near-neighbors: 2 from each class.  Interferents: TBD  Duration: December – April 2012 (4 ½ Months)

Networking Demonstration 7 Test Site: ECBC (JBTDS Personnel)  Systems Per Vendor: 4 Detectors, 4 Collectors, and 3 Identifiers.  Subtest 1 Alert Management Systems will be set-up in an array configuration. Then, operators will induce faults in the remote nodes by manually disabling the network connections and power supply to check for proper relay of alerts to the communications node.  Subtest 2 Collection Management Test personnel will use the communications node to remotely initiate collection and then later collect the samples to verify successful collection.  Subtest 3 Alarm Management Test personnel will walk to each detection node in turn to stimulate it with a contractor-provided “stimulator”. The “stimulator” will initiate an alarm while personnel at the C2 center assess adequate alarm transmission to the communications node.  Data Collection JBTDS personnel will collect data such as but not limited to: Proper relay of system alerts from the detector/collector nodes to the communications node; Proper relay of information from the communications node to the detector/collector nodes such as remotely initiated collection; and Proper relay of system alarms from the detector/collector nodes to the communications node.  Duration: March 2012 (1 Week)

False Alarm Rate 8 Test Site: JBTDS Personnel / ECBC Environmental Field Test Branch (EFTB), M-Field Test Range  Systems Per Vendor: 4 Detectors, 4 Collectors, and 3 Identifiers.  Test Procedure: Detectors and Collectors will be set-up in an array configuration. Systems will be powered by local 110VAC. Systems will run 24 hours per day for 3 weeks (500 hours). Testers will periodically collect samples and analyze them with the identifier. Testers will periodically restart all system nodes (force them to run through their Built In Test (BIT)).  Shut downs and start ups during personnel shift changes (every 8 or 12 hours).  Duration: March – April 2012 (4 Weeks)

Early Operational Assessment 9 Test Site: ECBC (JBTDS Personnel)  Systems per vendor: 4 detectors, 4 collectors, and 3 identifiers.  Vendor Training: Representative Warfighters from local units to Aberdeen Proving Ground (APG) will be trained in the operation (to include operator maintenance) of the systems.  Evaluations: Operation and Maintenance evaluations will be conducted on the Warfighters.  Data Collection: JBTDS personnel, as well as, Army Research Laboratory (ARL) Human Factors Engineers will collect operational data such as but not limited to: Time to set-up, Time to tear down, Time to replenish consumables, Time to perform operator maintenance, and Time to train.  User Survey: Consist of questions regarding the ease of use and ease of repair of the system. Test subjects will also be interviewed by ARL personnel to provide data for completing the Improved Performance Research Integration Tool (IMPRINT) Model.  Duration: Late April – Early May 2012 (1 Week)

Environmental MIL-STD-810G 10 Test Site: US Army Aberdeen Test Center (ATC) High Temperature (Operational) Blowing Rain Low Temperature (Operational) Blowing Sand High Altitude Blowing Dust Salt Fog Freezing Rain Solar Radiation Transportation Drop (48”) Humidity Vibration (Unsecured Cargo)  Systems Per Vendor: 1 Detector, 1 Collector, and 1 Identifier.  Test Procedure: Tests will be conducted sequentially with the least destructive tests first. BEFORE and AFTER each test, detectors will be “triggered”, collectors will collect a sample, and identifiers will process a training assay. Identifiers will not be subjected to all environmental tests due to anticipated mission profile  Duration: May – July 2012 (8 Weeks)  Proposed Tests: (SELECTED)

EMI / NSL / HAEMP MIL-STD-461/ Test Site: US Army Test Center (ATC), Naval Air Warfare Center Aircraft Division  Systems Per Vendor: 1 Detector, 1 Collector, and 1 Identifier.  Test Procedure: Tests will be conducted sequentially with the least destructive tests first. DURING EMI tests, detectors will alarm to stimulator material, collectors will collect a sample, and identifiers will process a training assay. AFTER the NSL and HAEMP tests, detectors will alarm to stimulator material, collectors will collect a sample, and identifiers will process a training assay.  Duration: May – July 2012 (8 Weeks) EMI CE 102Conducted Emissions, Power Leads, 10 kHz to 10 MHz CS 101Conducted Susceptibility, Power Leads, 120 Hz to 150 kHz CS 114Conducted Susceptibility, Bulk Cable Injection, 10 kHz to 200 MHz CS 115Conducted Susceptibility, Bulk Cable Injection, Impulse Excitation CS 116Conducted Susceptibility, Damped Sinusoidal Transients, Cables and Power Leads, 10 kHz to 100 MHz RE 102Radiated Emissions, Electric Field, 2 MHz to 18 GHz NSLElectric field rate of 10 meters (6.8×10 11 V/m/s) HAEMPTest parameters are classified (SELECTED)