Tozzi Qatar W . L . L . Presentation.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Electrical & Instrument Construction Department
MAKCO GROUP AN INTRODUCTION. The Group The Group comprises of the following companies: Makco Libya Ltd, Libya Makco UK Ltd, United Kingdom Makco Pvt.
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Company Profile Specialized Technical Services. Introduction Power Distribution Systems play a significant role in energy sector around the globe. Professional.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
The Power to Make a Difference PPL Electric Utilities April 2010.
 Waste Water Treatment Fax:
Introduction Transition of Management Initial Challenges Revival and Restoration Production for 2013 Year 2014 Major Works Production Mobile plant Projections.
CDB Consulting Engineers Ltd Mechanical, Electrical and Public Health Design Engineers, M & E Project Management.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
AL RAMI Aluminum & Glass Prequalification Manual
DMK Mechanical Services Ltd Pipework Solutions… Service Excellence.
CH/1 © Dr. Christian Hicks and Dr Tom McGovern An analysis of the impact of the restructuring of the UK civil nuclear industry on tier 1 and tier 2 suppliers.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
SK Engineering & Projects Ltd
profile Ajanta International W.L.L. Tel:
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
NCSX NCSX DCT Project Meeting Raki Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PROJECT – D TO C Site DC Transmission PROJECT MANAGEMENT.
BUILD WITH US. ™ Contractors
The Challenges to Implementing an AMR System in the Middle East Presented By: Maha Chalouhi Chalhoub NEEDS Near East Engineering and Development Services.
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
The knowledge, without know how, is totally useless (M.Plank)
2006 Technical Affairs Water Projects Department.
Special Innovative Symbol
Uniseven Engineering and infrastructure private limited
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
OFFICE OFFICE Tel : BUCHAREST Sos. Pantelimon, no.10-12, floor 5 Fax : WORKSHOP.
PPost - Contractual activities  Warrantee aspects  Assist clients in operation and maintenance  Retrofit and other facility improvement services OUR.
Apollo Power Systems Electrical – Website contents.
Aristotelis Botzios-Valaskakis MSc Mechanical Engineer Division of Development Programmes Building Energy Performance Reliable Predictions ESCO’s point.
04_0001 Elias Semaan Iraq Infrastructure Reconstruction Project Update.
RPG Vision Going for Growth
Visitors to Qatalum All visitors visiting Qatalum must possess a MIC gate pass before arriving at the MIC Gate.
Welcome to Address : Sr. No. 227/1, Sahakar Nagar, Dighi Road, Bhosari, Pune Phone Number:
Project proposal on "Implementation of modern and innovative technologies for road maintenance"
Company Profile P.O. Box E2-117 G-11 E-LOB Office, Hamriya Free zone Sharjah, U.A.E Tel No:
Prefabricated Building’s Expert
1 st PMI AGC ENERGY FORUM: DMS DEBATES June 2, 2010 EPCs Should be on a Bonus Incentive Scheme to Exceed Contract Expectations Dependability, Expertise,
 Established in 1993, Founded by the famous poet Mr. Talal Al Rasheed.  Females magazine has consistently proven to be the leading monthly magazine.
AUCTION TO SELL REAL PROPERTIES ALONG WITH A LAND PLOT Amur region, Tynda, ul.Radistov 8 (0.8738ha) RUSSIAN HOUSING DEVELOPMENT FOUNDATION.
Weddell Power Station unit three
Designer/Contractor JV- Apron Services Projects- A Winning Case
Company Confidential and Proprietary. Do Not Distribute or Copy. Methodology To Cost Effectively Accelerate Local Value Creation Jim Walton Fluor Director,
Biomass Cogeneration Facility Savannah River Site Aiken, SC
1 PORTFOLIO OF SOLUTIONS EAB POWER ENGINEERING LTD CO.KG.
ALMEER TECHNICAL SERVICES CO. W.L.L.
JGC CORPORATION July 5, 2012 Seminar on Japan-Turkey Cooperation in Iraq.
Asahi Switchgear Products Ltd. (ASPL) is a joint venture between Hirose Co. Japan and ASABHANU Technical Services Ltd., (ABTS) India. Asahi is located.
Erdeneburen HPP Project Implementation Unit
1Archer Mechanical. Archer Mechanical is dedicated to providing solutions that save you both time and money. Specializing in sustainable mechanical and.
PRESENTATION April 2005 A global leader in building a better tomorrow.
By SAJJAD KHUDHUR ABBAS – P81540
The Descon Group operates four major business lines
Industry Attraction: Rio Blanco County
Pre-Bid/Proposal Meeting
Western Michigan University Central Power Plant
Welcome to Corporate Electric
A. Datum Corporation Bid package overview
Fundamentals of PROCESS PLANT PIPING DESIGN
RAS AL KHAIMAH FREE TRADE ZONE AUTHORITY
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
A. Datum Corp. Bid package overview.
Qatar General Electricity & Water Corporation
Tom McGovern and Chris Hicks Newcastle University Business School
Instrumentation & Control Solutions Provider
Company Profile Presentation Copyrights 2013
Presentation transcript:

Tozzi Qatar W . L . L . Presentation

Tozzi Qatar W . L . L . COMPANY PRESENTATION >>>>> a company of TOZZI INDUSTRIES COMPANY PRESENTATION >>>>> The solution for your turn-key projects parent company Tozzi Sud S.p.A.

Tozzi Qatar W . L . L . SUMMARY >>>>> ATTACHMENT a company of TOZZI INDUSTRIES SUMMARY >>>>> Tozzi Qatar W.L.L. ● General Information ● Company’s Staff ● Labour Policies ● Personnel Work Permit Visa ● Location & Contact Detail ● Assets for Mobilization ATTACHMENT ● Main Job Reference List Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

Tozzi Qatar W . L . L . GENERAL INFORMATION >>>>> a company of TOZZI INDUSTRIES GENERAL INFORMATION >>>>> ● Tozzi Qatar W . L . L . has been established on 2006 (CR. No. 34022), by Italian parent company Tozzi Holding S.p.A ● Tozzi Qatar W . L . L . is supported by Tozzi Holding S.p.A. concerning Engineering and Commercial issues. Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

Tozzi Qatar W . L . L . >>>>> a company of TOZZI INDUSTRIES >>>>> ● Tozzi Qatar W . L . L . is specialized in the following activities: E&I detailed and installation engineering Shop drawing definition Material and equipment procurement Construction Management Instrument Calibration E&I installation and erection Mechanical completion Pre commissioning and Commissioning ● Tozzi Holding S.p.A operates in the following countries through the companies listed below: Tozzi Saudi Arabia Tozzi Egypt Tozzi Poland Tozzi Kazakhstan Tozzi France CTA Venezuela Tozzi do Brazil Tozzi Portugal Tozzi Abu Dhabi Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

Tozzi Qatar W . L . L . COMPANY STAFF >>>>> a company of TOZZI INDUSTRIES COMPANY STAFF >>>>> ● Tozzi Qatar W . L . L . employs highly skilled personnel. The key personnel have proven experience in the E & I installation and construction. ● Qualified TCN staff have been selected and employed for the executions of the projects. LABOUR POLICIES Tozzi Qatar W . L . L . policy in terms of direct workers is to seek the best personnel in terms of efficiency and productivity. For this reason, it employs different nationalities of workers such as: Bangladeshi Filipino Indian Indonesian Malay Nepali Thai Vietnamese PERSONNEL WORK PERMIT VISA ● Nos. 400 block visa ready to use. Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

Tozzi Qatar W . L . L . LOCATION & CONTACT DETAIL >>>>> a company of TOZZI INDUSTRIES LOCATION & CONTACT DETAIL >>>>> Tozzi Qatar W . L . L . Head Office is located at Airport road in Doha which is the center of company’s operation activities in Qatar. Tozzi Qatar W . L . L . No. 43, Airport Road Al Ansari Bldg., 3rd Floor, Umm Ghwailina Doha, State of Qatar PO Box 55941 Tel: +974 44323121 Tel: +974 44365438 Fax: +974 44428483 Website : www.tozziqatar.com.qa Management Team Proposal Dept. Technical Office Procurement Dept. ASSETS FOR MOBILIZATION VARIOUS Double Cabin Pick-up Minibus Mini Truck Truck with Crane (10T) Portable Instrument Calibration Room Electrical Test Equipments (LV/HV) Units Genset Portable Office (20 x 4 meter) Scaffolding Material * Warehouse / Lay Down Area (including Fabrication Shop) 8.000 sq.mtrs. Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

>>>>> MAIN JOB REFERENCE LIST Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

QATOFIN – LLDPE Plant - Messaieed Industrial City PROJECTS >>>>> Ras Laffan – RL (3) Common Offplot Projects – Ras Laffan Industrial City EPC Contractor : FLUOR Contractor : Astaldi Arabia Project : A2RG - Common Offplot Projects Final Client : RAS GAS Job Description : Supply and Erection of Electrical System, Fire and Gas HVAC Instrument and Control System No. 5 Electrical Substation, No. 2 Remote Building No. 1 Central Control Building Total Man Hours : 135,000 Hrs Contract Amount : 1.9 Million USD (*) Construction Period : February 2007 to April 2008 Yard Manpower : 50 people (Average) (*) including materials QATOFIN – LLDPE Plant - Messaieed Industrial City EPC Contractor : Snamprogetti Contractor : Astaldi Arabia Project : LLDPE Plant at Mesaieed Final Client : QATOFIN Job Description : Supply and Erection of Electrical System, Fire and Gas HVAC Instrument Electrical Substation, No. 2 Remote Building Control System No. 1 Total Man Hours : 95,000 Hrs Contract Amount : 1.35 Million USD (*) Construction Period : October 2007 to December 2008 Yard Manpower : 30 people (Average) (*) including materials Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

ADGO – Fuel Dehydration/Treatment Package, Abu Dhabi, U.A.E. PROJECTS >>>>> ADGO – Fuel Dehydration/Treatment Package, Abu Dhabi, U.A.E. EPC Contractor : MEPI / Technip Contractor : COMART Project : Fuel Gas Dehydration / Treatment Package Final Client : Abu Dhabi Gas Liquification Co. Ltd. Job Description : Supply and Erection of Electrical and Instrumentation System Total Man Hours : 118,000 Hrs Contract Amount : : 1.18 Million USD Construction Period : February 2008 to December 2008 Yard Manpower : 45 people (Average) Qatalum – Service Area and Potroom Bldg., Temporary Power Generation & Distribution EPC Contractor : SNC Lavalin Contractor : SNC Lavalin Project : Qatalum - Service Area and Potroom Building Final Client : Qatalum Job Description : E and I Activities Total Man Hours : 500,000 Hrs Contract Amount : 5 Million USD Construction Period : November 2007 to August 2009 Yard Manpower : 100 people (Average) Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

PROJECTS >>>>> Qatalum – Entrance, Road Lighting and Earthing, Mesaieed Industrial City EPC Contractor : SNC Lavalin Contractor : Al Jaber Engineering Project : Qatalum - Service Area and Potroom Building Final Client : Ras Gas Job Description : Road Lighting and Earthing, System for nr. 4 Substation Total Man Hours : 10,500 Hrs Contract Amount : 0.105 Million USD Construction Period : February 2009 to April 2009 Yard Manpower : 20 people (Average) Qatalum – Service Area and Potroom Bldg., Road Lighting & Earthing System EPC Contractor : SNC Lavalin Contractor : SNC Lavalin Project : Qatalum - Utilities and Service System Final Client : Qatalum Job Description : E and I Activities Total Man Hours : 1,118,000 Hrs Contract Amount : 11.18 Million USD Construction Period : February 2008 to September 2011 Yard Manpower : 100 people (Average) Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

PROJECTS >>>>> Shell Pearl GTL, Ras Laffan Industrial City EPC Contractor : CB&I Contractor : Astaldi Arabia Project : Fuel Tankage Project Final Client : Ras Gas Job Description : Installation of Electrical and HVAC System for nr. 4 Substation Total Man Hours : 233,000 Hrs Contract Amount : 4.5 Million USD (*) Construction Period : February 2009 to May 2010 Yard Manpower : 75 people (Average) (*) including materials Qatalum –Fume Treatment Center, Mesaieed Industrial City EPC Contractor : Solios Contractor : Solios Environment Project : Fume Treatment Center Final Client : Qatalum Job Description : E and I Activities Total Man Hours : 180,000 Hrs Contract Amount : 1.8 Million USD Construction Period : February 2009 to May 2009 Yard Manpower : 230 people (Average) Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

PROJECTS >>>>> Qatalum – Fume Treatment Plants 1-4, Mesaieed Industrial City EPC Contractor : Solios Contractor : Solios Environment Project : Fume Treatment Plants 1-4 Final Client : Qatalum Job Description : E and I Activities Total Man Hours : 1,310,000 Hrs Contract Amount : 13.1 Million USD Construction Period : February 2009 to August 2010 Yard Manpower : 280 people (Average) Solid Waste Management System EPC Contractor : Keppel Seghers Contractor : AMEM Project : Solid Waste Managment System Final Client : DSWMC Job Description : E and I Commissioning Total Man Hours : 50,000 Hrs Contract Amount : 0.50 Million USD Construction Period : February 2010 to August 2010 Yard Manpower : 35 people (Average) Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

MV/LV Switchboards Supply Reference List >>>>> QAFCO – Supply of MV Switchboard Contractor : Saipem/Snamprogetti Project : QAFCO V Final Client : QAFCO Job Description : Supply of 11KV Switchboards Contract Amount : 3 Million USD Construction Period : 2009 QATALUM – Supply of LV Switchboard Contractor : FATA Project : QATALUM - Anode Baking Plant Final Client : QATALUM Job Description : Supply of LV Switchboards Contract Amount : 1.5 Million USD Construction Period : 2009 QAFCO – Supply of MV Switchboard Contractor : Saipem/Snamprogetti Project : QAFCO VI Final Client : QAFCO Job Description : Supply of 11KV Switchboards Contract Amount : 1.8 Million USD Construction Period : 2010 Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa

PROJECTS >>>>> Doha North Sewerage Treatment & Associated Works EPC Contractor : Keppel Seghers Contractor : Keppel Seghers Project : Doha North Sewerage Treatment & Associated Works Final Client : DSWMC Job Description : E and I Commissioning Total Man Hours : 170,000 Hrs. Contract Amount : 1.8 Million USD Construction Period : September 2012 on Progress Yard Manpower : 120 people (Average) QSTec – Polysilicon Project, Ras Laffan Industrial City EPC Contractor : Punj Lloyd Limited Contractor : Punj Lloyd Limited Project : Polysilicon Project Final Client : QSTec Job Description : E and I Activities Total Man Hours : 1,600,000 Hrs. Contract Amount : 15.82 Million USD Construction Period : July 2013 on Progress Yard Manpower : 533 people (Average) Tozzi Qatar W . L . L . Parent Company Tozzi Sud S.p.A. P.O. Box: 55941 - Doha - State of Qatar Via Zuccherificio, 10 - 48123 Mezzano (RA) Italy C.R. No.: 34022 - Capital: 500,000 QR e-mail : commerciale.ra@tozzisud.com Tel: +974 44323121 - Fax: +974 44428483 website : www.tozzisud.com e-mail : info.tozziqatar@tozziholding.com website : www.tozziqatar.com.qa