The Southeast Energy Initiative Considerations for Installation Energy Security and Surety Gordon L. Simmons, P.E. Chief, Engineering Division Savannah.

Slides:



Advertisements
Similar presentations
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Enhanced Use Lease Components, Terms and Conditions Mr. Allan Curlee.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Peter Y. Flynn, September 16, 2014 Utilizing ESPC to Develop Renewable.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Assistant Secretary of the Army (Installations, Energy & Environment) Fifth Annual Energy Workshop NCPPP & ADC Amanda Simpson Executive Director, Army.
September 2012 Energy Opportunities: Solar, Wind, Energy Efficiency.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Energy Security & Resiliency A Conceptual Plan to Provide Affordable Infrastructure Resiliency, while Ensuring Persistence of Mission Capabilities within.
Financing Renewable Energy Projects: Issues and Opportunities Peter Y. Flynn Bostonia Partners July, 2013.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Engineering Technology Division
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Green Energy London Co-operative Inc. (GEL) May 9, 2013 What is GEL?
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
DESC Small Business Forum Newport, RI Installation Energy September 10, 2009.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
Global Energy Issues Burgeoning Demand – U.S., China, India… Peak Oil, Natural Gas / Supply Constraints Climate Change / Emissions Regulations Security.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
GSA National Capital Region Energy Efficiency Exchange Renewable Energy Projects w/ Private Funding Ronald Allard National Capital Region Energy Branch.
Assistant Secretary of the Army (Installations, Energy & Environment) UNCLASSIFIED Privately Financed Projects - Keys To Success Ms. Kathy Ahsing August.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
ANATOMY OF A DEAL: FINANCING Peter Y. Flynn, Bostonia Partners.
Increasing the Role of Renewable Energy Sources Bill Abolt Chicago District Manager Shaw Environmental & Infrastructure, Inc. May 10, 2007.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Phoenix Convention Center Phoenix, Arizona Business as Usual: Cost-Saving Activities that Green the Federal Government Solution ShowcaseGreening the Federal.
LTC Joe Knott/DAIM-ED/(703) Army Compatible Use Buffer (ACUB) Program 1 of October 2006 Army Compatible Use Buffer.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
Army Landfill Gas to Electricity Feasibility Study Mary Matthews Hains, PE AMEC Environment and Infrastructure.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Investing in the green economy: GIB’s approach to ensuring positive green impact 15 th September 2014.
Greenhouse Gas Initiatives: progress and perspective Sandra Meier Environmental Energy Alliance of New York.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Transforming Renewable Energy at the U.S. Department of Energy OFEE Symposium East – June 2008 Anne Sprunt Crawley U.S. Department of Energy.
1 Guidance on Renewable Energy in Federal Facilities under EO and EPACT 05 June 5, 2007 Anne Sprunt Crawley Federal Energy Management Program Energy.
Staples: Developing an Integrated Renewable Energy Strategy.
Connecting the Dots: Policy, Markets and the Clean Energy Future New England Restructuring Roundtable Boston, MA September 30, 2016.
Who Is Southern Power? Stephen Gowland Business Development Manager
Energy Savings Performance Contracts & Energy Service Companies
IREM® Fall Conference San diego, Ca 10/21/2016.
USA Clean Energy Update
Army Engineer Association Engineering & Energy Track 16 June 2015
Base Renewable Projects Legal & Regulatory Hurdles
Stevenson 5 Capacity Planning.
Renewable Energy Project Investments
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
Presentation transcript:

The Southeast Energy Initiative Considerations for Installation Energy Security and Surety Gordon L. Simmons, P.E. Chief, Engineering Division Savannah District

Energy Considerations in the Southeast Issues: Population in the South Atlantic states expected to grow by ~32% by 2030 with a related increases in energy demand Greenhouse gas emissions reduction by replacing coal plants with other forms of alternate and renewable sources Requirements toward energy and fossil fuel reductions (EPAct05, EISA07, EO 13423, and EO 13514) Solutions: Increased focus on reducing energy intensity and increasing conservation Providing a level of energy security to Installation Commanders while adding resiliency to the “Grid” … All while protecting the interest of the tax payer and being good stewards of the environment 2

Savannah District Focus Areas Alternate Energy, Smart Grids, Modernization, Critical Infrastructure, Energy Security New Construction Existing Buildings Conservation, Retrofit, Recommission What’s coming The overall Complex 3 Facility Design being enhanced by the SAS/SAM Center of Energy Excellence Large renewable or alternate power – The SAS Southeast Energy Initiative

Pilot Projects Conclusions  Energy savings are site and facility specific  EISA 2007 energy targets are a high bar to achieve Higher the internal loads the more difficult energy savings become Dining facilities are difficult, barracks are easier, admin somewhere in between Generally speaking, dependent on facility type: o % energy savings: the building yields the maximum energy savings for the lowest investment o % energy savings: each increment of energy saved comes at an increasingly higher investment o Above 60 %: May be cost prohibitive for facility types with high internal loads. Requires that we introduce renewable sources.  Introduction of renewable energy rarely pays back in the life of a single facility. Need to aggregate sources and needs across a grid. 4

SAS Energy Cx designs or retrofits existing buildings to the more cost effective energy efficient solution Work with EITF and Installation for large scale secure power solutions on the installation Large Scale Renewable or Alternate Power Ft. Anywhere Renewable Energy Generation 5

6

Large Scale Renewable Projects The EITF “Identify and Prioritize Opportunities” Target: 90 Days Conduct GIS Screening to ID installations w/ RE potential Analyze maturity of effort Assess top level economics Identify sites on installations w/ master plans Visit installation and confirm data on sites Assess Environmental and Operational Issues Conduct Go/No Go Assessment Prioritize sites in portfolio on Army RE goals Sign MOU with installations “Identify and Prioritize Opportunities” Target: 90 Days Conduct GIS Screening to ID installations w/ RE potential Analyze maturity of effort Assess top level economics Identify sites on installations w/ master plans Visit installation and confirm data on sites Assess Environmental and Operational Issues Conduct Go/No Go Assessment Prioritize sites in portfolio on Army RE goals Sign MOU with installations “Developing an Opportunity Into a Project” Target: Days Conduct initial legal and regulatory review Initiate NEPA assessments Provide full Economic Case Analysis (ECA) Coordinate Off-Take and other Stakeholder Input Define Real Estate strategy Define System Integration approach Assess Mission Operation and Security Impacts Obtain Required Approvals and Clearances Define Acquisition Approach “Developing an Opportunity Into a Project” Target: Days Conduct initial legal and regulatory review Initiate NEPA assessments Provide full Economic Case Analysis (ECA) Coordinate Off-Take and other Stakeholder Input Define Real Estate strategy Define System Integration approach Assess Mission Operation and Security Impacts Obtain Required Approvals and Clearances Define Acquisition Approach “Getting a Binding Agreement” Target:.5-1 Years Current: 1-3 Years Develop Acquisition Requirements and Evaluation Criteria Solicit Proposals from Industry Select “Highest Ranking Offeror” Obtain Required Approvals and Clearances Finalize Business Arrangements Award Contract or Execute Lease “Getting a Binding Agreement” Target:.5-1 Years Current: 1-3 Years Develop Acquisition Requirements and Evaluation Criteria Solicit Proposals from Industry Select “Highest Ranking Offeror” Obtain Required Approvals and Clearances Finalize Business Arrangements Award Contract or Execute Lease “Constructing Assets; Structuring Services” Target: 1-3 Years Monitor and Enforce performance, quality, schedule and warranty commitments Structure and Implement Support Service Agreements to Developer Structure and Account for Lease Payments or In-Kind Consideration Structure and Account for Power Purchase Payments Structure and Implement Service Agreements with Developer Structure REC transactions and accounting mechanisms “Constructing Assets; Structuring Services” Target: 1-3 Years Monitor and Enforce performance, quality, schedule and warranty commitments Structure and Implement Support Service Agreements to Developer Structure and Account for Lease Payments or In-Kind Consideration Structure and Account for Power Purchase Payments Structure and Implement Service Agreements with Developer Structure REC transactions and accounting mechanisms “Managing the Operation and Transition to Closure” Target: years Track PPA Payments Track REC management Conduct enforcement of performance, quality, and warranty commitments with operator Conduct validation of O&M activities vs O&M plan/schedule (case by case) Manage Counterparty Risk (credit monitoring) Develop transition/maintenance/de- commissioning plan Update installation energy plan “Managing the Operation and Transition to Closure” Target: years Track PPA Payments Track REC management Conduct enforcement of performance, quality, and warranty commitments with operator Conduct validation of O&M activities vs O&M plan/schedule (case by case) Manage Counterparty Risk (credit monitoring) Develop transition/maintenance/de- commissioning plan Update installation energy plan Current: 1-3 years The EITF Renewable Energy Project Development Guide 7

Current EITF Assessments Fort Bliss, TX Fort Bragg, NC Fort Carson, CO Fort Detrick, MD Fort Drum, NY Fort Hunter Liggett, CA Fort Irwin, CA Fort Lewis, WA Fort Riley, KS Fort Sill, OK Iowa Army Ammo Plant, IA Kahuku Training Area, HI Letterkenny Army Depot, PA Oregon Army National Guard, OR Parks Reserve Forces Training Area, CA Rock Island Arsenal, IL Sierra Army Depot, CA Tooele Army Depot, UT USAG-Hawaii, HI West Point (U.S. Military Academy), NY White Sands Missile Range, NM Yuma Proving Ground, AZ WA OR NV CA HI UT AZ NM CO KS OK TX IA IL PA NY MD NC Current Installation Engagements Fewer opportunities here 8

Ft. Anywhere Regional Energy Initiative AFB Biomass Navy Yard SMR Tenant Agency Other Federal Installation 9

Introduction to Regional Initiatives Obtain secure regional renewable energy at the best value possible:  Combining and resolving the needs of multiple Federal partners on multiple sites with a best value solution that provides economy of scale and shared investment.  Providing a focus on regional solutions and economics and the development of regional expertise.  Development of partnerships with industry, utilities, investors, and customers for successful, repeated, distributed RE projects within the region. Providing available Federal land at no cost Providing land with NEPA clearance to reduce risk Providing a guaranteed customer base of Federal users Shared risk and reward with the goal of providing the best value solution 10

BLUF - Southeast Energy Initiative (SEEI)  Savannah District is leading Army/ Federal Partners to produce commercial RE Power in various states in the southeast: Army/Federal Partners – Customers / Initial Investment / Strategic Mgmt USACE Savannah District – Regional Leadership/ Planning/ Execution/ Oversight of PPA DOE/ Savannah River National Lab – RE/Alternate Technology/ Existing Pilot Project/ Feasibility Local Utilities – Business Plan / RFP / PPA/ Transmission/ Marketing  Goal: Secure Energy Solutions, renewable, alternate, hybred  Private investment $400-$600 million to $1 billion  Biomass, Solar, Waste-to-energy, small modular reactors  Power Purchase Agreement (PPA) or ESPC 11

The Savannah District/Savannah River National Lab Team The Savannah River National Lab is a premier research, development and execution agent on the leading edge of all state-of-the-art clean energy opportunities  Existing partnership with USACE and Savannah District  Proven applications of Private-Public partnerships in the development of renewable energy projects that supplement the Site’s power requirements  Active in applying multiple forms of energy independence research and development that will be a benefit to the Army and the nation: Regional Industrial Hydrogen Fuel cells Small Modular Reactors and fuel repurposing Carbon neutral fuels (Biomass, algae, recycled CO 2 ) Carbon fuels recycling 12

Southeast Energy Initiative SRS Model - Biomass It’s not just a theory… Ameresco is providing turn-key delivery of this 20 MWe/200,000 pph steam biomass cogeneration plant at the Savannah River Site under an ESPC. Completed in Sept 2011 and now fully operational. Pilot Project at Savannah River Site:  Commercially funded biomass plant  40% of site’s required electricity  100% of site’s required steam  Design/build/operate by a commercial firm for 19 years (ESPC)  The government still owns the plant from day one  Minimum Federal investment Actively partnering and holding discussions for expansion into the region:  Ameresco Federal Services  Forts Gordon, Stewart, Bragg, Jackson  Utility Consortiums (SCANA, Duke…)  DOE, DHS, others 13

Landfill Gas to Energy Project Southeast Energy Initiative SRS Model – Waste to Energy Private – Public Partnership  Three Rivers Solid Waste Authority (Local) Government Owner Gas Collector  Kimberly-Clark Gas Purchaser (15 years)  Siemens Building Technologies Plant Operator/Pipeline Financier  Provides 40% of K-C’s energy needs, increasing to 90% as plant grows  Reduces greenhouse gases by 170,000 tons per year  Generates $150,000 revenue/month 14

SEEI Future Strategies For Example - Biofuels  Energy Independence Reducing dependence on foreign oil  Small scale demonstrations underway in US Producing ~2000 gal/acre/yr  Utilize large quantities of land and carbon dioxide Algae farm Carbon source Biomass Plants Landfill SEEI is looking beyond the immediate need toward applying other developed solutions to the southeast’s demands Algae farm project in Hawaii 15

REI Keys to Success – Giving All Parties What they Need  Developers need “shovel ready” projects to back up PPA RFPs – Completed environmental and real estate reviews, resource assessments, etc.  Financiers need PPA (with developer) that “guarantees” repayment of invested capital – Profitable sale price, provisions for full repayment if contract terminated, right to lien, etc. Ability to assume contract from the developer once construction is complete.  Utilities need protection from new generation affecting power quality, reliability, and cost to other customers. That is a state requirement for all retail utilities and a Federal requirement for all wholesale providers (generators, transmission owners, etc.). 18

REI Challenges – There is no cookbook yet  States regulate retail power, and crossing state lines on a REI may present issues. Federal agencies are bound by State regulations per 40 USC 591  Connection to the transmission grid highly regulated Adding to the grid is a long process The frequency response of the grid must be maintained Smart Grid technologies not mature Transmission lines between sites decrease security issues  Different agencies have different authorities with respect to entering into such agreements  How to share/purchase RECs if necessary  How to define “secure” energy 19

Particular Challenges of SEEI Regulated markets – profit fixed and controlled Who gets the projects? How much is needed for 25% in 2025? Economic downturn changes demand curves – looks like it may be flat for the next 10 years. $/KWh in the SE already low – hard to compete with new capital costs Natural gas prices remain low, discouraging renewables 20

Particular Challenges of SEEI Utility Companies Integrated Resource Plans vs. Installation renewable requirements Master planning of utility infrastructure on installations being lost in privatization –Privatized firms may not report their plans/vulnerabilities –Installations may not adequately share future plans with utility companies Infrastructure not in place to “manage” new power sources –Microgrid/Secure Grid –Definitions of Critical Infrastructure 21

How do you eat an elephant? 22

23