Disclaimer SAP has not endorsed or approved this presentation.

Slides:



Advertisements
Similar presentations
CA ERwin r8 installing the application things you should know before installing your CA ERwin r8 Data modeling application.
Advertisements

HP Quality Center Overview.
This material is the property of GlobalSolve  Management Services and is not authorized for reproduction or distribution without the prior written approval.
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2015 Wellesley Information Services. All rights reserved. Hands-on Lab: Advanced.
Envision – Architect – Prove Scott Mauvais Technical Director Microsoft Technology Center.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Welcome to RAI, the future of collaborative Project Risk Management Overview of Project Risk and Issue Management RAI for the Project Manager RAI for the.
Migration MIGR-02. David Cervelli Managing Consultant Strategic Systems Group (SSG) June 2007 Preparing for an Implementation.
Tom Sheridan IT Director Gas Technology Institute (GTI)
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2015 Wellesley Information Services. All rights reserved. Hands-on Lab: Advanced.
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2015 Wellesley Information Services. All rights reserved. Hands-on Lab: Introduction.
By Saurabh Sardesai October 2014.
1 Walk-in slide. 2 How to Manage a System Upgrade The Good, The Bad and The Ugly of Conversions David Cervelli Managing Consultant April 25, 2006.
IS&T Project Management: How to Engage the Customer September 27, 2005.
Managing LOB Applications by Using System Center Operations Manager Published: March 2007.
Data Protection Campaign At-a-Glance Call Guide 1.Introduction The reason for my call … We are excited that you responded to our on NetApp data protection.
Other Planning Processes: Final Planning Touches
Microsoft Premier Support for Partners Capitalize on cloud potential Receive and deliver end-to-end cloud support Ease customers’ transition to the cloud.
Release & Deployment ITIL Version 3
Microsoft Office Project Portfolio Server
November 2009 Network Disaster Recovery October 2014.
Chapter 2: Installing and Upgrading to Windows Server 2008 R2 BAI617.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Roles and Responsibilities
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
0 © 2013 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative.
Faye Business Systems Group presents: The Top 10 Reasons Why CRM Implementations Fail.
Innovation Use Case <Solution Title> <Partner Name>
Installing Windows Vista Lesson 2. Skills Matrix Technology SkillObjective DomainObjective # Performing a Clean Installation Set up Windows Vista as the.
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2015 Wellesley Information Services. All rights reserved. Hands-on Lab: Introduction.
Cloud Computing Characteristics A service provided by large internet-based specialised data centres that offers storage, processing and computer resources.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Assessment of Portal Options Presented to: Technology Committee UMS Board of Trustees May 18, 2010.
The Enterprise Project Management (EPM) Professional March 28th, 2007 Brendan Giles, BSc., PMP, MOS, MCP (EPM) The Key to Successful Adoption of Enterprise.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Master Data Management & Microsoft Master Data Services Presented By: Jeff Prom Data Architect MCTS - Business Intelligence (2008), Admin (2008), Developer.
Going beyond business as usual the pci group Integrated Project & Portfolio Management Microsoft Project Server 2003 – ProSight Portfolios Interface Presented.
0 © Copyright 2013 Wellesley Information Services, Inc. All rights reserved. HANDS ON LAB: Exploring SAP HANA Capabilities and SAP HANA Modeling.
Operational and Postimplementation
Or How to Gain and Sustain a Competitive Advantage for Your Sales Team Key’s to Consistently High Performing Sales Organizations © by David R. Barnes Jr.
Avanade Confidential – Do Not Copy, Forward or Circulate © Copyright 2014 Avanade Inc. All Rights Reserved. For Internal Use Only SharePoint Insights (BETA)
Type presentation name here in slide master © 2007 SDL. Company Confidential. Forward-looking information is based upon multiple assumptions and uncertainties.
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2014 Wellesley Information Services. All rights reserved. A Step-By-Step Guide.
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2014 Wellesley Information Services. All rights reserved. A Canvas for Improved.
6/13/2015 Visit the Sponsor tables to enter their end of day raffles. Turn in your completed Event Evaluation form at the end of the day in the Registration.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
Produced by Wellesley Information Services, LLC, publisher of SAPinsider. © 2015 Wellesley Information Services. All rights reserved. Hands-on Lab: WebI.
Job offer IT System & Software Specialist We are currently looking for an IT database administrator in order to respond to one key-account customer demand.
© 2016 IBM Corporation Virtual Appliance migration self-assessment May 2016 IBM Security Identity Manager.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
6 Best Practices for ERP Implementations By Rahul Vyas Believe me; There are Some Requirements Which are Essential for any of the ERP Implementation Project.
Review of IT General Controls
Office 365 Security Assessment Workshop
Partner Toolbox Cloud Infrastructure & Management
BIM 360 Glue Migration to BIM 360 Account Administration (HQ)
SAP SuccessFactors extension with SAP HANA Cloud Platform Innovation Use Case SAP & Partner Confidential
Plan and Safeguard Service Package for SAP S/4HANA
of our Partners and Customers
MISSION POSSIBLE:  Migrating to Oracle’s Planning and Budgeting Cloud Service Bob Usset, EPM Manager © 2016 eCapital Advisors, LLC.
How to prepare for the End of License of Windows Server 2012/R2
Transforming SharePoint Farm Solutions to the Add-in Model
ITSM Governance is Imperative to Succeed
Bridging the ITSM Information Gap
WORKSHOP Establish a Communication and Training Plan
Bridging the ITSM Information Gap
Presentation transcript:

Steve Coan VantagePoint Business Solutions Project Advice to Accelerate Your SAP Business Planning and Consolidation Implementation or Migration Project Steve Coan VantagePoint Business Solutions

Disclaimer SAP has not endorsed or approved this presentation. This is information based on my experience, insights, and current information (and somewhat educated opinion) on the current and future state of the SAP offering.

In This Session Practical, field-tested advice on how to implement BPC successfully and retain your sanity Advice about data integration, validation, and ETL The latest BPC 10.1 – Classic or Unified BPC upgrade paths and approaches BPC version support matrix and horizon

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

Tip 1 — Executive Sponsorship Is there willingness to provide sufficient resources and funding? Does the sponsor have authority to make key decisions across functional areas? Is the sponsor present? Is the sponsor engaged?

Tip 2 — Financial Vision Is there a clear vision across all stakeholders? Gain an understanding of desired output expected from each of the stakeholders Also gain an understanding of the desired input expected from each of the stakeholders

Tip 3 — Communication Do you have an effective form of communication in place for the project? Is there a shared directory available for project artifacts? Personal communication is a must Regular core team status meetings keep the project on track

Tip 4 — Clear Requirements Do you have existing, well documented processes in place? Have you discussed potential new processes required and their downstream impact? Your requirements are always wrong

Tip 5 — Data What is the desired level to plan/analyze, and does your actual data support this desired level? What other metrics are required?

Tip 5 — Data (Validation) Don’t overestimate your knowledge of your own data Don’t underestimate the time required for data validation Don’t even think of validating using a mature, custom report in the source against a brand new custom report in BPC Be patient and expect multiple iterations. Plan on it. Design for it.

Tip 6 — Project Team Do you have the right people for the team? Are they knowledgeable, cooperative, and results-orientated? Make process owners and subject matter experts available during the whole process To mitigate risk, spread the work rather then relying only on key people Make sure extended team members understand their roles

Tip 6 — Project Team (cont.) Do you have your Business Savvy Technologist Technology Savvy Business Person and your ?

Tip 7 — Critical Success Factors CSFs are those few things that must go well for an endeavor to succeed Have stakeholders identified and agreed on CSFs? Have you considered ongoing maintenance and support as a CSF? "Critical success factors are those few things that must go well to ensure success for…an organization, and, therefore, they represent [what] must be given special and continual attention to bring about high performance. CSFs include issues vital to an organization's current operating activities and to its future success.” - Boynlon, A.C., and Zmud, R.W. 1984. "An Assessment of Critical Success Factors," Sloan Management Review (25:4), pp. 17-27.

Tip 8 — Implementation Partner Have you developed an adequate RFP to assess vendors? Make arrangements to meet your finalists in person Find a partner who has done similar projects before. Many times. Lean on your partner. Avoid the trap of thinking, “We do things differently around here …”

Tip 9 — Project Management Does your organization contain project management skills? Will the project manager have proper authority over resources? A good project manager unshackles talented team members to make great deliveries

Tip 10 — Change Management Do you expect a high level of change to your current process? Gain an understanding of where your highest resistance will come from, and be proactive in selling the change Source: Spencer Johnson, M.D.

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

Data Tip 1 — Keep the Focus on Required Insights What types of questions do you want to ask of your data? Focus on what is required for planning or reporting and not what data is available More is not always better

Data Tip 2 — Minimize Movement, Maximize Visibility Focus on minimizing the data movement from one system to another Use drill-through for access to transactional data or a Web- enabled transaction that is already sufficient in another system HANA can handle large volumes easily, but getting all the data into BPC involves multiple ETL steps and adds overhead, time lag, and complexity to the environment

Data Tip 3 — Keep Actuals in Focus You can’t report data you don’t diligently capture Plan at the level where comparable actual data is available Don’t confuse what “is” available with what you “would like to be” available Example: Planned wiper blade sales for Sedans vs. SUVs Example: Profitability by Product instead of by Brand or Region Example: You want to plan how many widgets will sell for installation in cars versus SUV’s. If you don’t have a way to track the final installation target for your widgets, then you could end up assuming that actual=plan. Example: You want to report profitability for each product, but many costs are regional or brand-specific. It may be better to do brand or regional profitability rather than convey a false idea that costs are recorded to individual products

Data Tip 4 — The Right Data for Your Specific Model Planning models have different requirements from reporting models A healthy BPC environment has separate models for separate types of data: Financials and management reporting Capital Expenditures Workforce/headcount management Sales (by customer) Expenses (by vendors)

Data Tip 5 — Remember the Bottom Line Every bit of data has a cost: Disk space Network bandwidth Performance degradation Backup and recovery Interface development User training Project management and documentation Compare value provided vs. additional cost when deciding what data to bring into BPC

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

BPC 10.1 NW Classic vs. Unified Feature Classic Model Unified Model Data Modeling Single Key Figure Protected Namespace Multi-Key Figure Full EDW access Transact Data All transactional records must be copied into BPC namespace Transactional records can be sourced directly from the host EDW Master Data Must be copied into BPC namespace Cannot use compound master data Master data from the host EDW can be utilized Can use compounded master data definitions SQL Push Down to HANA Technically possible with a BAdI Capability is delivered functionality Cell locking Last in wins First in wins Source: SAP Platform Solution Group

BPC 10.1 NW Classic vs. Unified (cont.) Feature Classic Model Unified Model Calcs Script logic (no current plans to execute directly on HANA) HANA Optimized functions: dimension member formulas, top down planning using HANA, allocations using HANA FOX Formula logic – many functions capable to execute directly in HANA HANA Optimized functions: Copy, Repost, Revaluation, Delete, Deletion of Invalid Combinations, Set Key Figure Values, Distribution by Reference Data, Generate Combinations, repost on basis of Characteristic Relationship, Distribution with Keys, and Formula (many restrictions) Consol Full function consolidation Minimal consolidation functionality – more capability on current roadmap Source: SAP Platform Solution Group

BPC 10.1 NW Classic vs. Unified (cont.) Feature Classic Model Unified Model EPM Add-In Direct access to BPC model and data EPM Add-In supported functions available: Drill thru Disaggregation model selection Disaggregation Requires a BEx query acting as a data provider to support EPM Add-In Drill thru (on future roadmap) Disaggregation (on future roadmap), workaround available today through BEx or planning function User Interface EPM Add-In and Web EPM Add-In (via BEx query), Analysis for MS Office, BEx, and Web Source: SAP Platform Solution Group

Migrating to BPC 10.1 NW Re-implement BPC 10.0 NW PAK BW-IP BPC 10.1 Classic BPC 10.1 Unified Re-implement

Migrating to Classic BPC 10.0/10.1 NW Classic BPC NW Migration Paths 7.0 > 7.5 > 10.0 > 10.1 7.0 > 7.5 > 10.1  (Optional) BW Accelerator (BWA) 7.0 > 7.2

Migration Information in the PAM Prerequisites and dependencies are in the Product Availability Matrix (PAM) https://support.sap.com/pam BPC Version Official Product Name 7.5 MS SBOP PC 7.5 FOR MICROSOFT 10.0 MS SBOP PC 10.0 FOR MICROSOFT 7.5 NW SBOP PC 7.5 FOR SAP NW 10.0 NW SBOP PC 10.0 FOR SAP NW 10.1 NW SAP PC 10.1 FOR SAP NW (includes Classic and Unified)

Migration Steps to Classic BPC 10.0/10.1 First, migrate software components Migrate to BW 7.3 or 7.4 (in-place or system copy) Migrate to BWA 7.2 (optional) Execute the migration program 7.5 to 10.0 tcode: SE38, program: UJT_MIGRATE_75_TO_10 7.5 to 10.1 tcode: SE38, program: UJT_MIGRATE_75_TO_101 10.0 to 10.1 tcode: SE38, program: UJT_MIGRATE_100_TO_101

Migration Steps to Classic BPC 10.0/10.1 (cont.) Next, migrate customer data and features Upgrade security from Active Directory or CMS to SAP BW user accounts Create SAP BW user accounts Assign security roles and authorizations to the new user accounts Create a tab-delimited mapping file for use by the migration program to map old users to new users Deal with problems and unforeseen issues Migrate features that are not supported by the mapping program (coming slides) Regression test and validate Old User (Active Directory) New User (NetWeaver) <Domain>\<AD User ID> <ABAP User_ID>

Migration Utility for BPC 7.5 NW to 10.0 NW

Migration Utility Parameters

BPC Features That Migrate from 7.5 NW to 10.0 NW Objects, Tasks, Processes Migrated Administrative settings  yes Applications > Models Dimensions Terminology adjustments for new naming conventions User IDs Owner and reviewer properties of the dimensions Security: teams, task profiles, data access profiles, assignments Journals Business rules Validation rules > controls

BPC Features That Migrate from 7.5 NW to 10.0 NW (cont.) Objects, Tasks, Processes Migrated Data Manager features, including process chains, script logic, prompts, and all other features  yes Content Library Business Process Flows (BPFs) Log files from the Data Manager  no Live Reports (these are required to be rebuilt in the workspace area of the new version) Custom web pages and reports (these need to be rebuilt using the new web reporting and input template features) SAP BusinessObjects Dashboards (Xcelsius)

Viable Migration Options for Classic BPC 10.x NW In-Place Option 2 Copy Option 3 Clean Slate Direct migration on your current system. Migrate BW first, then BPC The entire system is copied and then migrated Perform a fresh installation of SAP BW 7.3+ and BPC 10.x Run UJBR to transfer data Pros: Straightforward Technical upgrade, little or no reimplementation No additional hardware or system requirements Production not affected Most controlled and manageable Clean Cons Disruptive BW and BPC systems are completely unavailable Exacerbated if problems cause delays Issues in current environment may be propagated Requires full installation and configuration of all servers, dependencies, prerequisites, and customizations

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

Migrating to BPC 10.0 MICROSOFT Migration on the Microsoft platform is different: No server software migration program — BPC is uninstalled and reinstalled with the new version Migrating an Appset (7.5) to an Environment (10.0) is accomplished using BPC Server Manager on the Application Server

Migration Steps to BPC 10.0 MS Migration from BPC 7.x to 10.x MICROSOFT Server Software Migration Uninstall BPC 7.x Install BPC 10.0 on the Application Server Data Migration Restore the 7.x APPSET backup Migrate the 7.x APPSET to a 10.0 ENVIRONMENT Review the Migration Log Deal with problems and unforeseen issues Migrate features that are not supported by the mapping program (coming slides) Regression test and validate

BPC Features That Migrate from 7.x MS to 10.0 MS Objects, Tasks, Processes Migrated Fact table data and comments  yes Administrative settings Applications > Models Dimensions Terminology adjustments for new naming conventions User IDs Owner and reviewer properties of the dimensions Security: teams, task profiles, data access profiles, assignments Journals Business rules

BPC Features That Migrate from 7.x MS to 10.0 MS (cont.) Objects, Tasks, Processes Migrated Data Manager package lists and settings, script logic, prompts, and all other features  yes Content Library Business Process Flows (BPFs), but some have been removed/changed Published Books Log files from the Data Manager Stored procedures and other custom SQL objects Live Reports (these are required to be rebuilt in the workspace area of the new version)  no Custom Data Manager Packages (any package with an SAP BPC task); standard packages (Copy, Move, Admin_Optimize) can be copied from EnvironmentShell to each Model

BPC 10.0 MS Server Manager

BPC 10.0 MS Server Manager (cont.)

BPC 10.0 MS Server Manager (cont.)

BPC 10.0 MS Migration Log

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

A Word on EvDRE > EPM Add-In Report Migration Don’t worry

EvDRE Support in the EPM Add-In EvDRE performs very well in the EPM Add-In There is a very short list of EvDRE features and EV functions that are not supported in BPC 10.0 Notable: Insert Member functionality EvHNV() EvMNU() MNU macros (e.g., MNU_eTools_Expand) Refactoring and testing converted templates can be a time sink

Legacy EvDRE Report Migration Strategy If you have in-house EvDRE expertise: Train your organization on the new report writer Migrate the 7.x Appset to 10.x Identify all mission critical report and input templates Regression test these EvDRE templates Remediate as required Create all new reports and input schedules using the EPM report writer Do all ad hoc reporting with the new EPM report writer As proficiency increases and schedule allows, migrate the legacy EvDRE templates

Legacy EvDRE Report Migration Strategy (cont.) If you DO NOT have in-house EvDRE expertise: Train your organization on the new report writer Migrate the 7.x Appset to 10.x Identify all mission critical report and input templates Regression test these EvDRE templates Decision point: Remediate the EvDRE template, then migrate it with the migration tool, or Recreate from scratch using the new EPM report writer Create new reports and input schedules using the EPM report writer Do all ad hoc reporting with the new EPM report writer

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

SAP’s Support Strategy for All BPC Versions GA* EOMM** Location Migration < From Calculations 10.1 NW Unified Jun, 2014 12/31/2020 EDW BW Integrated Planning (BW-IP), Planning Application Kit (PAK) FOX, HANA Optimized functions 10.1 NW Classic /CPMB/ BPC 10.0 BPC Advanced Logic, BAdI 10.0 NW Apr, 2012 BPC 7.5 NW < BPC 7.0 NW 7.5 NW Aug, 2010 12/31/2017 BPC 7.0 NW 7.0 NW Apr, 2009 3/31/2016 N/A 10.0 M Feb, 2012 Any SQL instance BPC 7.0 M, BPC 7.5 M BPC Advanced Logic, Stored Procedures 7.5 M Dec, 2009 BPC 7.0 M 7.0 M Aug, 2008 *Generally Available **End of Mainstream Maintenance

What We’ll Cover Ten preparation tips for a successful BPC implementation Five tips for identifying the right data granularity for your project Migration options for moving to BPC 10.0/10.1 NW Migration options for moving to BPC 10.0 MS Migrating from EvDRE to EPM Add-In templates SAP’s support strategy for all BPC versions Wrap-up

Return on Investment It goes to 11, doesn’t it?

Please remember to complete your session evaluation How to contact me: Steve Coan scoan@vantagepoint-solutions.com Please remember to complete your session evaluation

Disclaimer SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies. Wellesley Information Services is neither owned nor controlled by SAP SE.