TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)000121.

Slides:



Advertisements
Similar presentations
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
Advertisements

World Class Standards TC SCP TEC Status Report to TC SCP Plenary #55 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
World Class Standards 1 SCP(11)0001 SCP Plenary #47 January 12-14, 2011 Title*: Update on TC M2M activities (and Smart Metering Mandate) Submitted by:
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #54 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
Status Report on GSM (SMG #29) TSG-T3 #7 Lund, July 1999 TSG-T Dr. Klaus Vedder Chairman SMG9.
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
Overview & Definitions for Downloadable Credentials 1 S GPP2 TSG-S WG1 Source: Sprint, US Cellular, Motorola Mobility, Qualcomm Contact(s):
Report of ETSI NGN IPTV activities Rainer Münch, TISPAN Chairman Presenter: Ian Spiers DOCUMENT #:GSC13-PLEN-56 FOR:Presentation SOURCE:Rainer Münch, Ian.
PRESENTATION OF ETSI © ETSI All rights reserved Sophia Antipolis, 22 May 2014 Luis Jorge Romero Director General, ETSI.
APEC-TPT Intermodal & ITS Group Action Plan (Proposed Format) May 2006 (updated – Ha Noi) CONGESTION AHEAD.
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Standing for trust and integrity 19 th XBRL International Conference Paris, June Status FEE XBRL Task Force, what is happening around Europe.
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
Policy Oversight Committee Update Board of Directors Meeting June 25-26, 2012 Stuart C. Sweet, MD, PhD.
© NOKIADEFAULT.PPT / / AO page: 1 USIM requirements and structure NOKIA Mobile Phones TSGT3#3(99)082.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
GISFI_GICT_ GISIF#8, , March 2012, Patna 1 GISFI#8 Green ICT Working Group Report Company:NEC Corporation Author(s):Chair Contact
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Work Group / Work Item Proposal Slide 1 © 2012 oneM2M Partners oneM2M-TP oneM2M_Work_Group_Work_Item_Proposal Group name: Technical Plenary Source:
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
1 NIIF Summary Report Activities since the NIIF #50 meeting November 4, 2005 Stu GoldmanRobert Schafer NIIF Co Chair.
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
Status Report on Access TP8 Group Name: WG2 Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information  Contact:
Joint Electric Scheduling Subcommittee Update February 18, 2014.
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
Doc.: IEEE /296r0 Submission May 2002 Erwin Noble, PhilipsSlide 1 ETSI-BRAN #28 Interworking Group Liaison Report to IEEE WNG Erwin Noble.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
May 16, 2005Chair, IEEE May 16, 2005Chair, IEEE Next Steps & Action Items from March 2005 Plenary Status Review - - May 2005 Interim.
GISFI_GICT_ GISIF#8, , March 2012, Patna 1 GISFI#8 Green ICT Working Group: Activity Update and Agenda Company:NEC Corporation Author(s):Chair.
SEC #11 WG4 Status & Release 1 Outlook Group Name: Source:,, Meeting Date: Agenda Item:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
CT WG6 status report to TSG CT #75
3GPP TSG-RAN WG4 Meeting #84bis
WG1 status report to TP#15 Group Name: oneM2M TP15
WF on NR spectrum NTT DOCOMO, INC. R
WPM ad-hoc group report TP#25
3GPP RAN1 #90 meeting summary on LAA Enhancements
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
WF on LTE-NR DC with UL coexistence
ETSI EE status of activities in 2013
Secure Element API An introduction.
ETSI NFV ISG IM/DM Modelling progress Report
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
TG1 Draft Topics Date: Authors: September 2012 Month Year
Reinhard Scholl, GTSC-7 Chairman
on the overall 5G-NR eMBB workplan
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report November 2017 Plenary]
IWG Worn tyres Tyre Industry work status July 17th 2019
IWG Worn tyres Tyre Industry work status July 17th 2019
IWG Worn tyres Tyre Industry work status July 17th 2019
EN Spectrum Mask Interpretations
Presentation transcript:

TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)000121

2 Meetings Since Last TC SCP Plenary SCP REQ#46 bis Conference Call 07, 17 and 31 March 2014 SCP REQ#47 Hosted by Morpho March 2014 Bremen, Germany Accepted agenda is available in SCPREQ(14)000061

Discussions, hot topics Multiple or Single set of Profile Management Credential The topic has been discussed deeply in order to define all the options we have today on the field. No agreement has been reached on the options and advice from Plenary has been requested. Profile Interoperability There is a proposal on the field which is trying to reach a compromise, but it has not been finalized. The group agreed to work on this proposal. The direct contribution presented in SCP #62 and sent to REQ has not been accepted by REQ, but its content has been included in the compromise proposal. No agreement has been reached on the compromise proposal and advice from Plenary has been requested. © ETSI All rights reserved 3

Results achieved by the WG REQ during REQ#46bis and REQ#47 13 CRs to be presented for acceptance to SCP#63 60 Documents discussed related to the 3 open work items Main topic for discussion is still eUICC 11 CRs on the eUICC requirements has been accepted 1 CR on the contactless topic has been accepted 1 CR on the UICC Access Optimizations has been accepted 1 new Work Item has been accepted 4

Status of SCP REQ WIs after SCP REQ#47 5 REL-12 Use cases and requirements related to Embedded UICCs 11 CRs accepted Target: SCP#64 Use cases and requirements related to the addition of new contactless features 1 CR accepted Target: SCP#63 UICC Access Optimizations 1 CR accepted Target: SCP#63

Embedded UICC WI Policy Control: A new set of credential has been introduced in order to allowed the Policy Rules management outside the Profile. No agreement on the Policy Rules definition. Where to store a Policy Rule (inside or outside a Profile) will be defined in REQ and not in TEC, as the rule may have some implication in the rule definition. Definitions: A CR (SCPREQ(14)000042r1) has been accepted to align the naming between REQ and TEC. Management of credentials: Action R45/01 has been discarded because Orange and Samsung was not able to prepare a joint contribution. Companies interested can provide contributions as usual. © ETSI All rights reserved 6

Addition of contactless features WI 1 CR accepted in document SCPREQ(14)000066r1 This CR should address the main ETSI SCP requirements in the context of the Multiple Secure Element Management. 7

UICC access optimisation WI 1 CR accepted in document SCPREQ(13)000103r5 8

Output Documents – TSs None 9

Output Documents – TRs None 10

Output Documents - CRs 11 CRs against TS SCP(14) > SCP(14) CRs against TS SCP(14) and SCP(14) CRs has been sent to REQ by SCP#62: SCP(14)000069: it has been revised and accepted by REQ in document SCPREQ(14)000066r1 and is presented to SCP #63 in document SCP(14) SCP(14)000073: it has been discussed in REQ and 3 companies were against this CR. 11

Output Documents – WIDs A new work item “Mechanism for monitoring the number of updates to some UICC files” has been accepted in document SCPREQ(14)000046r2/SCP(14)

Output Documents – LS SCPREQ(13)000064/SCP(14) DRAFT Reply LS on Naming of off-card entities of the eUICC 13

Request for advice from Plenary Management of profiles: Two different proposals related to the Profile Interoperability have been discussed: SCPREQ(14)000058r2 SCP REQ SCP(14) Deutsche Telekom AG, Apple France, AT&T GNS Belgium SPRL, HUAWEI TECHNOLOGIES Co. Ltd.,Ericsson, Illuminismo Limited, INFINEON TECHNOLOGIES, NOKIA UK Ltd, OBERTHUR TECHNOLOGIES, QUALCOMM UK Ltd, Samsung R&D In The first one was originally ( SCPREQ(14)000058r1 ) proposed by Giesecke & Devrient, Gemalto, Morpho, Oberthur and Valid. The meeting worked on this proposal in order to try to reach consensus and produced SCPREQ(14)000058r2. There are still some concerns on the current wording of the requirements. Requirement proposed in SCP(14) has been included in SCPREQ(14)000058r2. Apple and Deutsche Telekom are not in the position to accept the proposal as it is now. The second one (SCP(14)000073) is the companies contribution presented during last Plenary and sent to REQ. No agreement has been reached on this CR and Valid, Gemalto, Morpho declared to be against this CR. 14

Request for advice from Plenary Management of credentials: Several proposals to introduce the possibility to have more than one set of Profile Management Credentials. Several companies and also the Chairman asked to add use cases to the content of the CR and not only in the Reason for Change. The proposals have been categorized in a table and the Chairman asked a show of hands to understand the support of each option. 15

Request for advice from Plenary Management of credentials: 16 OPTION 1: One PMC for all Profile Management operations (7 supporting companies) Gemalto, Telenor, Orange, Telecom Italia, AT&T, Bouygues Telecom, VALID OPTION 2: SCPREQ(14)000047r1 One PMC for transport and one PMC for all other Profile Management operations. (i.e. functional split) (12 supporting companies) Qualcomm, LG, Sprint, Huawei, Ericsson, Deutsche Telekom, AT&T, Telia Sonera, Giesecke & Devrient, Apple, Bouygues Telecom, Samsung OPTION 3: (SCPREQ(14)000047r1 with SCPREQ(14)000048r1) SCPREQ(14) Multiple PMCs for transport and one PMC for all other Profile Management operations. (7 supporting companies) Ericsson, Deutsche Telekom, Apple, Giesecke & Devrient, Qualcomm, Huawei, Samsung OPTION 4: Multiple PMCs, each enabling overlapping subsets of Profile Management operations (5 supporting companies) Morpho Cards, Qualcomm, Samsung, Deutsche Telekom, Apple OPTION 5: SCPREQ(14)000114r1 Multiple PMCs allow for all Profile Management operations but only one set is usable at a given point in time. (e.g. PMC associated to a Profile and only usable in relation to this Profile) (2 supporting companies) Qualcomm, Huawei,

Next Steps / Milestones To progress WI for Embedded UICC Use Cases and Requirements Should target in priority the points identified by editors notes Should introduce the missing features To progress WI on UICC access optimization Requirements have been defined To progress WI on addition of contactless features Requirements have been defined Continuous collaboration with NFC Forum and GlobalPlatform 17

Meeting Schedule TC SCP REQ SCP REQ#48 23 – 25 June 2014, Kansas City US SCP REQ#49 25 – 27 August 2014, Venice IT SCP REQ#50 01 – 03 December 2014, TBD 18