Collaboration K. Artoos, CTC 8th February 2011 Active Structures Laboratory Department of Mechanical Engineering and Robotics Université Libre de Bruxelles.

Slides:



Advertisements
Similar presentations
MYRRHA Injector at UCL Dirk Vandeplassche Luis Medeiros Romão SCK CEN MAX International Design Review Brussels, November 2012 Dirk Vandeplassche,
Advertisements

STABILISATION WG MEETING th FEBRUARY 2013 CTC SUMMARY The research leading to these results has received funding from the European Commission under.
CLIC stabilisation contribution A.Jeremie, B.Caron, A.Badel, R.LeBreton, J.Lottin, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise, S.Vilalte.
Summary of Collaboration “EOI’s” for the CLIC technical developments HS for CTC.
STABILISATION WP STATUS CTC DECEMBER 2012 The research leading to these results has received funding from the European Commission under the FP7 Research.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Güralp Systems Ltd is a leading designer and manufacturer of seismological instruments, digitizers, acquisition modules and software.
STUDY OF THE HYBRID CONTROLLER ELECTRONICS FOR THE NANO-STABILISATION OF MECHANICAL VIBRATIONS OF CLIC QUADRUPOLES P. Fernández Carmona, K. Artoos, C.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
27/3/2009EuCARD NCLinac Kick-Off Meeting 1 Summary NCLinac Kick-Off CERN, 27-Mar-2009.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
LINAC STABILISATION (INCLUDING FF) MECHANICAL STABILISATION AND NANO POSITIONING WITH ANGSTROM RESOLUTION The research leading to these results has received.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
R&D ON STABILIZATION MBQ: FROM CDR TO TECHNICAL IMPLEMENTATION PHASE K. Artoos, C. Collette **, P. Fernandez Carmona, M. Guinchard, C. Hauviller, S. Janssens.
MECHANICAL STABILIZATION AND POSITIONING OF CLIC (MAIN BEAM) QUADRUPOLES WITH SUB- NANOMETRE RESOLUTION K. Artoos, C. Collette **, M. Esposito, P. Fernandez.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
November : PACMAN Kick-off Meeting Introduction to Work Package 3: “Precision mechanics and stabilization” Michele Modena - CERN.
1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
PROGRESS ON THE CLIC MBQ STABILIZATION R&D K. Artoos, C. Collette **, M. Esposito, P. Fernandez Carmona, M. Guinchard, S. Janssens*, R. Leuxe, R. Morón.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
STABILISATION WG MEETING 11 The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
STABILISATION AND PRECISION POINTING QUADRUPOLE MAGNETS IN THE COMPACT LINEAR COLLIDER S. Janssens, P. Fernandez Carmona, K. Artoos, C. Collette, M. Guinchard.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
TBTS Test Program & Schedule G. Riddone
October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
Standard electronics for CLIC module. Sébastien Vilalte CTC
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
FP7: EuCARD after a year of preparation… A.Jeremie.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
10th stabilization meeting
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
ATF2: final doublet support
CLIC MBQ: from CDR to technical implementation phase CLIC Main beam quadrupole Mechanical stabilization S. Janssens*, K. Artoos, C. Collette**, P. Fernandez.
4th stabilization meeting
What Should We Do?.
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
CLIC-ILC BDS & MDI work.
A.Jeremie Some drawings from different CLIC’08 presentations
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Presentation transcript:

Collaboration K. Artoos, CTC 8th February 2011 Active Structures Laboratory Department of Mechanical Engineering and Robotics Université Libre de Bruxelles (ULB), Belgium Institut de Recherche sur les lois Fondamentales de l'Univers CEA (Commissariat à l'énergy atomique) Saclay, France Laboratories in Annecy (France) working on VIbration STAbilisation 1 Contact: Chr. Collette Promoter ASL: A. Preumont Contact: F. Ardellier Desages, M. Fontaine Contact: A. Jeremie Status: No collaboration signed yet with CERN Unilaterally funded by Brussels Capital Region Project Chr. Collette Unpaid associate Status: Contribution exceptionelle de la France au CERN (EDMS ) WP (in CTF 3 collaboration, no addendum for stabilisation) Status: EUCARD 2013 Contribution exceptionelle de la France au CERN (EDMS ) WP (in CTF 3 collaboration, no addendum for stabilisation)

Deliverables Studies of measurement methods independent from the feedback loops, in particular optical ones and application to the mock-up. ACCORD TECHNIQUE D’EXECUTION NO.4: du protocole de collaboration k1597/dg K. Artoos, CTC 8th February 2011 Status: SIOS tri axis interferometer purchased Tests ongoing on mock up (RFQ) for pole tip vibration measurements Tests at CERN foreseen in February on membrane and quadriped

Deliverables 3 K. Artoos, CTC 8th February 2011 EUCARD WP 9.3 LINAC & FF Stabilisation Sub task 1: CLIC quadrupole module Sub task 2: Final Focus Test stand 4/2009Milestone 1 : Calculs vibratoires de l’aimant du démonstrateur (rapport) 12/2009Milestone 2: Construction et qualification d’un démonstrateur simplifié (version LAPP) et du(es) prototype(s) de contrôle servant a ce démonstrateur (rapport) 3/2010Milestone 3 : Analyses vibratoires de l’ensemble du démonstrateur (rapport) 6/2010Milestone 4 : Développement de la méthodologie de contrôle et application au démonstrateur (plusieurs combinaisons) 10/2010Milestone 5 : Rebouclage des calculs vibratoires avec les mesures sur le démonstrateur (rapport) 3/2011Milestone 6 : Evaluation des performances (Rapport) 9.3.1Characterisation of noise/vibrations sources in an accelerator 9.3.5Commisioning of CLIC quadrupole module 9.3.6Quadrupole mock-up manufactured and ready for installation ACCORD TECHNIQUE D’EXECUTION NO.4: du protocole de collaboration k1597/dg

4 K. Artoos, CTC 8th February 2011 Development of stabilisation support FE model of MBQ type 4 Modal analysis Will participate with modal and water cooling vibration measurements in ISR Characterisation in accelerator environment Development seismometers, characterise Eentec chemical seismometer FF stabilisation

5 K. Artoos, CTC 8th February 2011 Objectives ASL Development of a control strategy for the stabilisation of a single module, with equipment compatible with the accelerator environment. Develop a scaled prototype of the model. Integration of the control strategy of a single module in a global strategy for a multi segmented system. Investigate alternative sensors to measure low frequency, small amplitude vibrations