Radiation Calendar first half 2009 (1): PSI60 MeV p 24-25-26 March BLM electronics Automation equipment Interlocks (DRAFT description of the results in.

Slides:



Advertisements
Similar presentations
Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session th January 2010 Radiations to Electronics.
Advertisements

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd Julien Palluel BE/CO/FE.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The Laboratory 530 R-005: RADMON and more A Masi, The Laboratory 530 R-005: RADMON and more The Laboratory 530 R-005: RADMON and more A. Masi 1.What??
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting

Shashlik type calorimeter for SHIP experiment
Irrigation & Soil Moisture Monitoring of Forage Crops Rad Yager.
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Handling Electronics from Radiation Areas N. Conan, D. Forkel-Wirth, T. Otto, S. Roesler, C. Theis, C. Tromel, V. Tromel, Heinz Vincke, L. Ulrici R2E,
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
LdV project: E-Business in SME in Agriculture and Food processing Industries ACTA Informatique contribution Our web sites: a unique information resource.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
Experiment Electronics UMC 0.18µm radiation hardness studies Progress since last Collaboration Meeting Sven Löchner GSI Darmstadt 15 th CBM Collaboration.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
By Angelica Senders (Fair & Sustainable Advisory Services) APF Gender in value chain kick off workshop Nakuru, Kenya, June The coaching track.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
R2E Workshop Preparations RadWG Meeting March 25 th.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development /
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Matters arising RADWG - 3 July 2009
CHARM facility update 23/04/2015
Annual Calendar January February March April May June July August
Radiation monitoring and follow up during LHC commissioning
Gantt Chart October November December Step One Step Two
How to create an Indico Conference
Task Group Status January ,11, 2017
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
CNGS Run 2007: Radiation Issues
FRAUNHOFER Update on Test-Campaigns
Dosimeters installation during the EYETS 28/03/17
CNRAD dosimetry and Summary of the TS
10/month is the present production rate 2 FTE + sporadic contributions
S. Le Naour / RADWG meeting
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
Euromedim proposal (Applying HEP methods in medical imaging)
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Radiation Monitoring in LHC Experiments
The Derivative as a Function
Demander et dire sa date d’anniversaire.
Radioactive waste management - status
Forward-bias operation of FZ and MCz silicon detectors made with different geometries in view of their applications as radiation monitoring sensors J.
Agenda SLO 3rd Block only: Vocab Unit 10 Vote
Key Dates Tania Pearce Refer to Noreen’s slides..
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

Radiation Calendar first half 2009 (1): PSI60 MeV p March BLM electronics Automation equipment Interlocks (DRAFT description of the results in indico) PSI 250 MeV p April QPS electronics Radmon radfet sensor response WorldFIP derivation CNGS test facility dry run April installation April startup 4 Mai

PROSPERO 1 MeV n11-14 Mai FGC electronics BLM electronics and chamber Radmon neutron response PSI 250 MeV p April QPS electronics Radmon radfets sensors WorldFIP derivation CNGS test facility dry run April installation April startup 4 Mai Radiation Calendar first half 2009 (2):

TSG45 ATSG45 BTSG46 ATSG46 B 1 st slotWorldFIPBLM/BPMQPSCRYOGENICS 2 nd slotWordFIPBLM/BPMQPSCRYOGENICS 3 rd slotWorldFIPBLM/BPMQPSCRYOGENICS 4 rd slotVacuumPower ConvQPSBIC/PIC 6 rd slotVacuumPower ConvQPSBIC/PIC 7 th slotSurveyPower ConvQPSBIC/PIC See talk by J. Palluel this meeting New CNGS Operational Schedule

LIF 60 MeV p June Fire detection/ OD Automation modules CV Survey equipment Total dose testSummer 2009 (tbd) Radiation Calendar first half 2009 (3): Note : Dosimeters and film badges from the local host laboratory must be used at all times when in the facilities. There are new directives for the use of your CERN electronic dosimeter and you CERN film badge. This will be outlined in a memo from RP.

- Aspirateur dédié à la zone radiation - Poubelles dédiées à la zone radiation - PAD- Registre + outils de contrôle - Lavabo en cas de contamination - Aspiration téléscopique - machine à dessouder - Outillage - Etabli mécanique, démontage FGC, QHPS, convertisseur 60A, 120A, 600A, 2kA, autres ? - Etabli électronique (soudage SMD + traditionnel) - Etagères - Table roulante - PC- Espace réservé pour le traitement de l’air issu de l’aspiration - Palette Example from PO – thanks

CERN Radiation Workshop /school 2-3 June 2009 Divonne les Bains (Organisation M. Brugger) New ST radiation solutions in CMOS 65nm – end of Mai 2009 achievements with ESA on the technology assessment new rad-hard libraries new high performance SERDES in CMOS 65nm future ST projects on rad-hard ASICs Upcoming Events