HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.

Slides:



Advertisements
Similar presentations
Department Leadership Teams Involving Everyone in the Plan on a Page! November 17, 2009.
Advertisements

Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
ELENA Installation follow-up 21/05/2015 Worksite follow-up.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
HiRadMat : report from WG2 – WANF dismantling WG3 - Irradiation Area October S. Evrard 1 WG2&3 meeting organization Preliminary WBS for related.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
NA YETS: schedule week by week S. Evrard.
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
MTA Installation Meeting March 7, 2007 Agenda 1)Progress report (Fernanda) 2)Water skid discussion (Maurice) 3)Alignment needs (O’Sheg + all) 4)AOB Key.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
HiRadMat : report from WG2 – WANF dismantling December 10, 2009S. Evrard 1 WANF cleaning T1 removal Access and Ventilation hardware Integration : naming.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
HIGH RADIATION TO MATERIALS Ans Pardons for the HiRadMat project team IEFC Workshop, March 22, 2011 Outline  The HiRadMat facility – Why, What, When,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EHN1 Extension planning
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Safety in Construction and Upgrade Phases
News about the WA104 Programme
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
Installations, modifications, consolidation in 2005:
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Cryogenic Risk Assessment in LHC
Extension SR1 WP3 Electrical installations
Radiation-safe area for electronics, or laser or
ACS news Circulator TCU: control tests in progress All cavity racks
HiRadMat Test Facility
Present and Future test facilities for High-intensity Targetry CERN
LS1 status 17/03/2014.
Experimental Areas – LS2 planning
East Hall under construction
East Hall under construction
Presentation transcript:

HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal for next weeks AOC or work notification ? Agenda

Worksite : activities in progress (W1&2) January 15, 2010S. Evrard 2 B846 access control 2/3 completed (cabling and new grid door OK, PLC upgrade in week 3) Furet dismantled RIA installed, hoses box to be fixed TT61 cleaned, shielding blocks (TCX) ready for installation TNC re-lighting done

WANF cleaning January 15, 2010S. Evrard 3 Work procedure and dose estimate received and validated with DG/SCR Team of 4 Cern today: paper work and VIC achieved Cleaning in W3

Proposal for S. Evrard 4 Remove as much as possible during monthly LHC technical stops (outlined area). MTR’s and T1 target during LHC shutdown (need to remove TI2 line  investigation in progress T1 dismantling January 15, 2010

Proposal for W4 S. Evrard 5 Survey network points 8 drilling operations to be carried out by GS/SEM January 15, 2010

Proposal for S. Evrard 6 Removal of old AHU in TA7 Could be achieved on CV small works contractor January 15, 2010

Proposal for S. Evrard 7 Removal of beam line equipment from TNC 2 magnets Beam instrumentation January 15, 2010

Proposal for S. Evrard 8 Other activities Red telephone in TNC (F. Schmitt) Pas de câble de ce type en stock au CERN, un mois nécessaire pour approvisionner, F. Schmitt fera propositions palliatives lors de la réunion (tél. normal en TNC ?). Fire detection removal in TNC. (D. Raffourt) Crane crémaillère check (A. Calderone) January 15, 2010